Project intelligenceTDLR TABS2025009779Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

EPISD Campus Vestibules Region 3 24.555B

903 W. Missouri Avenue, El Paso, TX, 79902

Construction complete · Sep 2026Project Closed

EPISD Campus Vestibules Region 3 24.555B is a renovation/alteration project at 903 W. Missouri Avenue, El Paso, in El Paso County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2026). The project has an estimated value of $75K across about 70 sq ft.

Estimated project value
$75K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
70 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$1.07K/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
5 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jan 16, 2025621 days across supplied datesSep 29, 2026

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    18 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    150 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Project closed · TDLR filing

    The project record was closed in TDLR.

    453 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About EPISD Campus Vestibules Region 3 24.555B

El Paso Independent School District completed a $75,000 renovation at Vilas Elementary School, located at 903 W. Missouri Avenue in the Union Plaza area. The work involved constructing an access-controlled vestibule at the campus main entry, adding 70 square feet of new space to the historic building. TDLR closed the project file in September 2026, marking the end of the accessibility review process for this construction.

The project was registered with the Texas Department of Licensing and Regulation in January 2025. Plan review was completed in the same month, and construction began in February 2025. The filing scheduled completion for July 2025. This timeline represents a 150-day build window, which is close to the county median of 120 days for similar renovation and alteration filings in El Paso County.

Project Scope and Cost Context

The estimated cost of $75,000 places this project below the county median for its type. In El Paso County, the median estimated cost for renovation and alteration projects is $204,870. This specific filing falls within the bottom quarter of costs for that category. The scope was strictly limited to the vestibule construction, ensuring controlled access at the primary entrance without expanding the overall footprint of the school significantly beyond the 70-square-foot addition.

El Paso Independent School District is the owner of record for this work. The district has six other TDLR-registered projects in the area, totaling $16,446,000. These include renovations at El Paso High School, Coronado High School, Burges High School, Bowie High School, and Lamar Elementary School. The Vilas project is one of several district initiatives focused on facility improvements and accessibility compliance across the region.

Location and Area Context

The school is situated in ZIP code 79902, a neighborhood with a population of about 18,529. According to U.S. Census American Community Survey estimates for 2023, the median household income in this area is $45,333. The housing stock consists of 9,752 units, with a median owner-occupied home value of $223,300. The area is largely renter-occupied, reflecting the demographic profile of downtown El Paso.

Nearby landmarks and businesses include The Plaza Theatre, the Abraham Chavez Theatre, and the DoubleTree by Hilton Hotel El Paso Downtown. The Anson Mills landmark and the Visit El Paso Information Center are also in the vicinity. The Bert Williams Downtown Santa Fe Transfer Center serves as a local bus station. These points of interest indicate a bustling urban environment surrounding the school campus.

The TDLR record confirms that the project utilized public funds and public land. The filing status is now closed, indicating that all required accessibility reviews and construction milestones have been satisfied according to the regulatory timeline. No further action is pending in the TDLR database for this specific 70-square-foot vestibule addition at Vilas Elementary School.

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 79902 (El Paso)

One email per change. Unsubscribe in one click. Privacy.

EPISD Campus Vestibules Region 3 24.555B is a Renovation/Alteration project located at 903 W. Missouri Avenue, El Paso, TX 79902 in El Paso, Texas. The project has an estimated value of $75K covering 70 sq ft. El Paso Independent School District is the property owner. The project was registered with TDLR on January 16, 2025.

Frequently Asked Questions

What was the scope of work at Vilas Elementary?

The project involved the construction of an access-controlled vestibule at the campus main entry. This addition totaled 70 square feet and was designed to improve controlled access to the historic school building.

How much did the renovation cost?

The estimated cost for the project was $75,000. This figure is below the El Paso County median for renovation and alteration projects, which stands at $204,870.

When was the construction completed?

Construction began in February 2025, and the filing scheduled completion for July 2025. TDLR closed the project file in September 2026, confirming the end of the regulatory process.

Who owns the property?

The owner of record is the El Paso Independent School District. The district manages several other renovation projects in the El Paso area, totaling over $16 million.

Is the school open to the public?

The TDLR record confirms the construction of the vestibule is complete. Local coverage from the El Paso Times noted that the campus is merging with Mesita Elementary, which may affect daily operations and access.

What is EPISD Campus Vestibules Region 3 24.555B?

EPISD Campus Vestibules Region 3 24.555B is a renovation/alteration project at 903 W. Missouri Avenue in El Paso, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of access-controlled vestibule at campus main entry.

Is EPISD Campus Vestibules Region 3 24.555B open in El Paso?

Construction on EPISD Campus Vestibules Region 3 24.555B is complete — TDLR records show the project passed its required accessibility inspection in Sep 2026. The building is finished and very likely open.

Where is EPISD Campus Vestibules Region 3 24.555B located?

EPISD Campus Vestibules Region 3 24.555B is located at 903 W. Missouri Avenue, El Paso, TX, 79902, in El Paso County.

Who is the owner or developer of EPISD Campus Vestibules Region 3 24.555B?

El Paso Independent School District is the property owner/developer of record for EPISD Campus Vestibules Region 3 24.555B, per its TDLR project registration.

How much does EPISD Campus Vestibules Region 3 24.555B cost and how big is it?

EPISD Campus Vestibules Region 3 24.555B has an estimated construction value of $75K and approximately 70 square feet (about $1.07K/sqft), based on its TDLR filing.

Scope of Work

Construction of access-controlled vestibule at campus main entry.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

903 W. Missouri Avenue, El Paso, TX, 79902

Location by street address

Watch all construction in 79902 (El Paso)