SWA Group
SWA Group is a renovation/alteration project at 5646 Milton Street Suite 130, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2026). The project has an estimated value of $750K across about 6,980 sq ft.
๐Project Metrics
TDLR #TABS2025011650Project Closed
Project has been completed and closed
SWA Group is a Renovation/Alteration project located at 5646 Milton Street Suite 130, Dallas, TX 75206 in Dallas, Texas. The project has an estimated value of $750K covering 6,980 sq ft. US Energy Square, LLC is the property owner and Gensler is the design firm of record. The project was registered with TDLR on February 11, 2025.
โFrequently Asked Questions
What is SWA Group?
SWA Group is a renovation/alteration project at 5646 Milton Street Suite 130 in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of existing B occupancy office space on Level 1. All building core elements to remain. Tenant improvement work entails new non-bearing partitions, millwork, ceiling/lighting, doors/frames, power/communication and new finishes.
Is SWA Group open in Dallas?
Construction on SWA Group is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2026. The building is finished and very likely open.
Where is SWA Group located?
SWA Group is located at 5646 Milton Street Suite 130, Dallas, TX, 75206, in Dallas County.
Who is the owner or developer of SWA Group?
US Energy Square, LLC is the property owner/developer of record for SWA Group, per its TDLR project registration.
Who is the architect or design firm for SWA Group?
Gensler is the design firm of record for SWA Group, according to its TDLR filing.
How much does SWA Group cost and how big is it?
SWA Group has an estimated construction value of $750K and approximately 6,980 square feet (about $107/sqft), based on its TDLR filing.
๐Scope of Work
Renovation of existing B occupancy office space on Level 1. All building core elements to remain. Tenant improvement work entails new non-bearing partitions, millwork, ceiling/lighting, doors/frames, power/communication and new finishes.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Feb 11, 2025
Review Complete
Feb 11, 2025
Inspection Complete
Jan 21, 2026
Closed
Apr 12, 2026
344d
Construction phase