Project intelligenceTDLR TABS2025012289Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Carrollton-Farmers Branch ISD Blalack Middle School Renovations

1706 E Peters Colony Rd, Carrollton, TX, 75007

Opening ~Aug 2027Project Registered

Carrollton-Farmers Branch ISD Blalack Middle School Renovations is a renovation/alteration project at 1706 E Peters Colony Rd, Carrollton, in Denton County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Aug 2027. The project has an estimated value of $34.0M across about 172,000 sq ft.

Estimated project value
$34.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
172,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$198/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2y 3mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Feb 19, 2025893 days across supplied datesAug 1, 2027

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    71 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    822 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Carrollton-Farmers Branch ISD Blalack Middle School Renovations

Carrollton-Farmers Branch Independent School District is executing the Blalack Middle School Renovations, a $34,000,000 project located at 1706 E Peters Colony Rd in Carrollton. This major renovation/alteration covers 172,000 sq ft of the existing middle school facility, with an estimated cost of $198 per square foot. Temporary portables will be installed on the site to support operations while construction proceeds, ensuring continuity during the extensive rebuild.

The project was registered with TDLR in February 2025. Plan review is pending, and the construction start date per the filing is May 2025. The completion date on the filing is targeted for August 2027, representing a scheduled build window of 822 days. This timeline is significantly longer than the county median of 92 days for similar renovation and alteration projects in Denton County, reflecting the scale of the interior demolition and reconstruction involved in this specific scope of work.

Corgan serves as the design firm of record for this project, bringing expertise to the complex redesign of the educational facility. Ronald L Davis is the registered accessibility specialist assigned to ensure compliance with accessibility standards. The project involves public funds and public land, consistent with its status as a Federally funded or publicly supported initiative. This investment is part of a broader portfolio of school improvements by the district, which includes other major renovations in the Carrollton and Irving areas.

In comparison to other renovation/alteration filings in Denton County, this project’s cost is above the county median for its type, placing it in the top quarter of estimated costs. The median estimated cost for similar projects in the county is $235,000, highlighting the substantial nature of this specific school renovation. The $198 per sq ft cost is also above the county median of $80 per sq ft, indicating a higher level of finish or complexity in the construction process compared to typical local projects of this category.

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75007 (Carrollton)

One email per change. Unsubscribe in one click. Privacy.

Carrollton-Farmers Branch ISD Blalack Middle School Renovations is a Renovation/Alteration project located at 1706 E Peters Colony Rd, Carrollton, TX 75007 in Carrollton, Texas. The project has an estimated value of $34.0M covering 172,000 sq ft. Carrollton-Farmers Branch Independent School District is the property owner and Corgan is the design firm of record. The project was registered with TDLR on February 19, 2025.

Frequently Asked Questions

Is Blalack Middle School open?

The TDLR record indicates the project is under renovation with temporary portables installed. It does not state that the school is open or operating, only that construction is ongoing with a completion target.

Who is the owner of the Blalack Middle School renovation project?

The owner of record is Carrollton-Farmers Branch Independent School District. The project is located at 1706 E Peters Colony Rd, Carrollton, TX 75007.

When is the Blalack Middle School renovation expected to be completed?

The completion date on the filing is targeted for August 2027. Construction is scheduled to start in May 2025.

Which design firm is working on the Blalack Middle School project?

Corgan is the design firm of record for the Blalack Middle School Renovations. Ronald L Davis is the registered accessibility specialist for the project.

What is Carrollton-Farmers Branch ISD Blalack Middle School Renovations?

Carrollton-Farmers Branch ISD Blalack Middle School Renovations is a renovation/alteration project at 1706 E Peters Colony Rd in Carrollton, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior full demolition of about 50% of the existing middle school building in additional to other areas being renovated with temporary portables being installed on site while construction is ongoing. Other minor site work is included.

Is Carrollton-Farmers Branch ISD Blalack Middle School Renovations open in Carrollton?

Carrollton-Farmers Branch ISD Blalack Middle School Renovations is still under construction in Carrollton, TX, with an estimated completion of Aug 2027 according to its TDLR registration.

Where is Carrollton-Farmers Branch ISD Blalack Middle School Renovations located?

Carrollton-Farmers Branch ISD Blalack Middle School Renovations is located at 1706 E Peters Colony Rd, Carrollton, TX, 75007, in Denton County.

Who is the owner or developer of Carrollton-Farmers Branch ISD Blalack Middle School Renovations?

Carrollton-Farmers Branch Independent School District is the property owner/developer of record for Carrollton-Farmers Branch ISD Blalack Middle School Renovations, per its TDLR project registration.

Who is the architect or design firm for Carrollton-Farmers Branch ISD Blalack Middle School Renovations?

Corgan is the design firm of record for Carrollton-Farmers Branch ISD Blalack Middle School Renovations, according to its TDLR filing.

How much does Carrollton-Farmers Branch ISD Blalack Middle School Renovations cost and how big is it?

Carrollton-Farmers Branch ISD Blalack Middle School Renovations has an estimated construction value of $34.0M and approximately 172,000 square feet (about $198/sqft), based on its TDLR filing.

Scope of Work

Interior full demolition of about 50% of the existing middle school building in additional to other areas being renovated with temporary portables being installed on site while construction is ongoing. Other minor site work is included.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

1706 E Peters Colony Rd, Carrollton, TX, 75007

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75007 (Carrollton)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Carrollton?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.