Project intelligenceTDLR TABS2025012451New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Sulphur Springs ISD- New ES 2

College St., Sulphur Springs, TX, 75482

Construction complete · Aug 2026Inspection Complete

Sulphur Springs ISD- New ES 2 is a new construction project at College St., Sulphur Springs, in Hopkins County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2026). The project has an estimated value of $55.0M across about 110,000 sq ft.

Estimated project value
$55.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
110,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$500/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 3mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Feb 21, 2025554 days across supplied datesAug 29, 2026

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    70 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    457 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    27 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Sulphur Springs ISD- New ES 2

Sulphur Springs ISD has completed the New ES 2 elementary school on College Street in Sulphur Springs. The 110,000-square-foot facility, valued at $55,000,000, passed its final TDLR accessibility inspection in August 2026, marking the end of the construction phase. This new building stands as the largest recent addition to the district's infrastructure, significantly expanding educational capacity in Hopkins County.

The project was registered with TDLR in February 2025, with plan review completed in the same month. Construction began in May 2025 and concluded in August 2026. The scheduled build window of 457 days is longer than the county median of 242 days for similar new construction filings. This extended timeline reflects the scale of the work, which involved creating a full elementary school from the ground up rather than renovating existing structures.

Design and Cost Context

Huckabee served as the design firm of record for this project. The estimated cost of $500 per square foot is above the county median of $113 per square foot for new construction. This premium reflects the comprehensive nature of the build, which includes modern educational spaces and necessary accessibility features. The project utilizes public funds and public land, aligning with federal and state requirements for public education infrastructure.

Sulphur Springs ISD has four other TDLR-registered projects totaling $68,517,805. These include the Douglas Early Education Center, Jim Bowie Elementary School, Barbara Bush Elementary School, and New ES 1. All four of these projects have also completed their inspections. The New ES 2 project represents a significant investment in the district's physical plant, comparable in cost to the New ES 1 project but distinct in its location and specific educational focus.

The site is located in ZIP code 75482, where the U.S. Census estimates the population at about 26,086. The median household income in this area is $64,049, and the median owner-occupied home value is $202,600. The construction of a new elementary school addresses the growing needs of families in this community. Nearby businesses include Galyean Insurance and the Hopkins County Tax Collector, indicating a well-established local commercial and administrative presence.

Ross A Thomas is the registered accessibility specialist for this project. The final TDLR accessibility inspection confirmed that the building meets all required standards for accessibility. This completion allows the district to proceed with its operational plans for the new facility. The project stands as a testament to the district's commitment to providing modern, accessible educational environments for students in Sulphur Springs.

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75482 (Sulphur Springs)

One email per change. Unsubscribe in one click. Privacy.

Sulphur Springs ISD- New ES 2 is a New Construction project located at College St., Sulphur Springs, TX 75482 in Sulphur Springs, Texas. The project has an estimated value of $55.0M covering 110,000 sq ft. Sulphur Springs ISD is the property owner and Huckabee is the design firm of record. The project was registered with TDLR on February 21, 2025.

Frequently Asked Questions

Is the New ES 2 school open for enrollment?

The TDLR record confirms the building passed its final accessibility inspection in August 2026. This indicates construction is complete, but it does not confirm if the school has officially opened for student enrollment or operations.

Who designed the new elementary school?

Huckabee is listed as the design firm of record for the New ES 2 project. They are responsible for the architectural and design aspects of the 110,000-square-foot facility.

How much did the New ES 2 project cost?

The estimated cost for the project is $55,000,000. This translates to approximately $500 per square foot, which is above the Hopkins County median for new construction.

When did construction finish?

Construction was scheduled to complete in August 2026, and the final TDLR accessibility inspection was passed in that month. The project status is now listed as Inspection Complete.

Where is the New ES 2 school located?

The school is located on College Street in Sulphur Springs, Texas 75482. It is situated in Hopkins County, near other local businesses and educational facilities.

What is Sulphur Springs ISD- New ES 2?

Sulphur Springs ISD- New ES 2 is a new construction project at College St. in Sulphur Springs, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New elementary school for Sulphur Springs ISD

Is Sulphur Springs ISD- New ES 2 open in Sulphur Springs?

Construction on Sulphur Springs ISD- New ES 2 is complete — TDLR records show the project passed its required accessibility inspection in Aug 2026. The building is finished and very likely open.

Where is Sulphur Springs ISD- New ES 2 located?

Sulphur Springs ISD- New ES 2 is located at College St., Sulphur Springs, TX, 75482, in Hopkins County.

Who is the owner or developer of Sulphur Springs ISD- New ES 2?

Sulphur Springs ISD is the property owner/developer of record for Sulphur Springs ISD- New ES 2, per its TDLR project registration.

Who is the architect or design firm for Sulphur Springs ISD- New ES 2?

Huckabee is the design firm of record for Sulphur Springs ISD- New ES 2, according to its TDLR filing.

How much does Sulphur Springs ISD- New ES 2 cost and how big is it?

Sulphur Springs ISD- New ES 2 has an estimated construction value of $55.0M and approximately 110,000 square feet (about $500/sqft), based on its TDLR filing.

Scope of Work

New elementary school for Sulphur Springs ISD

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

College St., Sulphur Springs, TX, 75482

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75482 (Sulphur Springs)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Sulphur Springs?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.