Project intelligenceTDLR TABS2025012960Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

FKC Oak Ridge Dialysis in Oak Ridge North, TX

27160 I-45 N, Oak Ridge North, TX, 77385

Target date passed (Jun 2025)Project Registered

FKC Oak Ridge Dialysis is a renovation/alteration project at 27160 I-45 N, Oak Ridge North, in Montgomery County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jun 2025 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $100K across about 8,416 sq ft.

Estimated project value
$100K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
8,416 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$12/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Feb 27, 2025123 days across supplied datesJun 30, 2025

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    32 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    91 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About FKC Oak Ridge Dialysis

The renovation of FKC Oak Ridge Dialysis at 27160 I-45 N in Oak Ridge North is an 8,416 sq ft project estimated at $100,000. The work involves repairs to existing space, alterations to two office spaces, and restroom updates throughout the facility. A new domestic water connection for a fire riser and sprinkler installation is also part of the scope. The project is located in the Town Center area of Montgomery County.

Project Details and Status

Michael Rauschenberger is the owner of record, and eStudio Architecture is the design firm. Kenneth Otten is the registered accessibility specialist. The project was registered with TDLR in February 2025 with a target completion of June 2025; no plan review or inspection has been recorded since, so whether it proceeded is not confirmed in the public record. The scheduled build window was 91 days, which is close to the county median of 92 days for similar renovation filings.

The estimated cost of $100,000 is below the Montgomery County median of $250,000 for renovation and alteration projects. The cost per square foot is $12, which is below the county median of $85. This project is privately funded on private land. The area is in ZIP code 77385, which has a population of about 26,889 and a median household income of $112,798 according to U.S. Census estimates.

Michael Rauschenberger has five other TDLR-registered projects totaling $1,850,000, including FMC Kingwood in Humble and FKC North Shore in Houston. eStudio Architecture has six other registered projects totaling $5,466,000, such as the Evoluciona Compounding Facility in Stafford. Other renovation projects in the same area include 9303 New Trails and Timberloch Place. The Montgomery County unemployment rate was 4.6 percent in August 2026, lower than a year earlier.

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77385 (Oak Ridge North)

One email per change. Unsubscribe in one click. Privacy.

FKC Oak Ridge Dialysis is a Renovation/Alteration project located at 27160 I-45 N in Oak Ridge North, Texas. The project has an estimated value of $100K covering 8,416 sq ft. Michael Rauschenberger is the property owner and eStudio Architecture is the design firm of record. The project was registered with TDLR on February 27, 2025.

Frequently Asked Questions

Is FKC Oak Ridge Dialysis open?

The TDLR record does not confirm business operations. It only tracks construction registration. No plan review or inspection has been recorded since the February 2025 registration, so the current operational status is not verified in this public filing.

What is the scope of the renovation?

The scope includes repairs on existing space, alteration of two office spaces, restroom alterations, and the addition of a new domestic water connection for a fire riser and sprinkler installation.

Who is the owner of the project?

Michael Rauschenberger is the owner of record for the FKC Oak Ridge Dialysis renovation project in Oak Ridge North.

What is the estimated cost of the project?

The estimated cost is $100,000. This is below the Montgomery County median of $250,000 for comparable renovation and alteration filings.

Where is the project located?

The project is located at 27160 I-45 N in the Town Center area of Oak Ridge North, Montgomery County.

What is FKC Oak Ridge Dialysis?

FKC Oak Ridge Dialysis is a renovation/alteration project at 27160 I-45 N in Oak Ridge North, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Repairs on existing space. Alteration of two office spaces. Alterations on restrooms throughout space. Addition of a new domestic water connection for a fire riser and sprinkler installation.

Is FKC Oak Ridge Dialysis open in Oak Ridge North?

FKC Oak Ridge Dialysis was scheduled to finish construction in Jun 2025 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is FKC Oak Ridge Dialysis located?

FKC Oak Ridge Dialysis is located at 27160 I-45 N, Oak Ridge North, TX, 77385, in Montgomery County.

Who is the owner or developer of FKC Oak Ridge Dialysis?

Michael Rauschenberger is the property owner/developer of record for FKC Oak Ridge Dialysis, per its TDLR project registration.

Who is the architect or design firm for FKC Oak Ridge Dialysis?

eStudio Architecture is the design firm of record for FKC Oak Ridge Dialysis, according to its TDLR filing.

How much does FKC Oak Ridge Dialysis cost and how big is it?

FKC Oak Ridge Dialysis has an estimated construction value of $100K and approximately 8,416 square feet (about $12/sqft), based on its TDLR filing.

Scope of Work

Repairs on existing space. Alteration of two office spaces. Alterations on restrooms throughout space. Addition of a new domestic water connection for a fire riser and sprinkler installation.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

27160 I-45 N, Oak Ridge North, TX, 77385

Loading location map…
30.15960, -95.44926

Watch all construction in 77385 (Oak Ridge North)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Oak Ridge North?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.