Project intelligenceTDLR TABS2025013085Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Camp Bowie Boulevard & Bryant Irvin Road Intersection Improvements in Fort Worth, TX

5930 Camp Bowie Blvd, Fort Worth, TX, 76107

Opening ~Jan 2027Review Complete

Camp Bowie Boulevard & Bryant Irvin Road Intersection Improvements is a renovation/alteration project at 5930 Camp Bowie Blvd, Fort Worth, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jan 2027. The project has an estimated value of $116K across about 3,780 sq ft.

Estimated project value
$116K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
3,780 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$31/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
8 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Feb 28, 2025702 days across supplied datesJan 31, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    458 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    244 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Camp Bowie Boulevard & Bryant Irvin Road Intersection Improvements

The City of Fort Worth is leading a renovation and alteration project at the intersection of Camp Bowie Boulevard and Bryant Irvin Road, located at 5930 Camp Bowie Blvd in the Como neighborhood of Fort Worth. This site in Tarrant County covers 3,780 sq ft and involves the installation of turn lanes, crosswalks, sidewalks, curb ramps, signage, and pavement markings, including 420SY of property sidewalk. The estimated cost for this infrastructure upgrade is $115,700, which equates to $31 per square foot.

Project Scope and Design

Kimley-Horn serves as the design firm of record for this project, which is funded through public funds, public land, or a Federally funded roadway project. The scope focuses on improving accessibility and traffic flow at this major intersection. George A Patterson is the registered accessibility specialist associated with the filing. The work is classified as a Renovation/Alteration, distinct from new construction, aiming to enhance the existing roadway and pedestrian infrastructure.

TDLR completed plan review for this project in February 2025. The construction phase is set to begin in June 2026, with the timeline scheduled to finish in January 2027. This build window spans approximately 244 days. The project’s estimated cost is below the county median for renovation and alteration filings in Tarrant County, placing it in the bottom quarter of costs for similar types of work. The cost per square foot of $31 is also below the county median of $79.

The intersection is situated in a commercial area with several local businesses, including Zeke's Fish n Chips, Szechuan Chinese Restaurant, and Sunflower Shoppe Wellness Market. The surrounding ZIP code 76107 has a population of about 31,112 residents, with a median household income of $79,473. Housing in this area is mostly renter-occupied, and the median owner-occupied home value is estimated at $431,300. The City of Fort Worth has six other TDLR-registered projects, totaling over $397 million, including the Fort Worth Convention Center and Meacham Airport Terminal Building.

Kimley-Horn has designed six other TDLR-registered projects across Texas, with a combined value of nearly $198 million. These include large-scale developments like the Red River Rise Lodge in Vernon and the Terra Nova Amenity Center in Terrell. The Tarrant County unemployment rate was 4.4 percent in August 2026, lower than a year earlier. Other registered projects in the Como area include the Texas Health Breeze Urgent Care and the Neill Building, both undergoing renovation or alteration work.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76107 (Fort Worth)

One email per change. Unsubscribe in one click. Privacy.

Camp Bowie Boulevard & Bryant Irvin Road Intersection Improvements is a Renovation/Alteration project located at 5930 Camp Bowie Blvd, Fort Worth, TX 76107 in Fort Worth, Texas. The project has an estimated value of $116K covering 3,780 sq ft. City of Fort Worth is the property owner and Kimley-Horn is the design firm of record. The project was registered with TDLR on February 28, 2025.

Frequently Asked Questions

When is the construction scheduled to finish?

The project is scheduled to finish in January 2027. Construction start is planned for June 2026, following the completion of plan review in February 2025.

Who is the owner and design firm for this project?

The owner of record is the City of Fort Worth. The design firm of record is Kimley-Horn, with George A Patterson serving as the registered accessibility specialist.

What specific improvements are included in the scope of work?

The scope includes installation of turn lanes, crosswalks, sidewalks, curb ramps, signage, and pavement markings, along with 420SY of property sidewalk.

What is the estimated cost of the project?

The estimated cost is $115,700. This figure is below the median estimated cost for renovation and alteration projects in Tarrant County.

Is the project currently open to the public?

The project is in the planning and pre-construction phase. It is not open for construction work yet, which is scheduled to start in June 2026.

What is Camp Bowie Boulevard & Bryant Irvin Road Intersection Improvements?

Camp Bowie Boulevard & Bryant Irvin Road Intersection Improvements is a renovation/alteration project at 5930 Camp Bowie Blvd in Fort Worth, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Installation of turn lanes, crosswalks, sidewalks, curb ramps, signage, and pavement markings. 420SY of prop sidewalk.

Is Camp Bowie Boulevard & Bryant Irvin Road Intersection Improvements open in Fort Worth?

Camp Bowie Boulevard & Bryant Irvin Road Intersection Improvements is still under construction in Fort Worth, TX, with an estimated completion of Jan 2027 according to its TDLR registration.

Where is Camp Bowie Boulevard & Bryant Irvin Road Intersection Improvements located?

Camp Bowie Boulevard & Bryant Irvin Road Intersection Improvements is located at 5930 Camp Bowie Blvd, Fort Worth, TX, 76107, in Tarrant County.

Who is the owner or developer of Camp Bowie Boulevard & Bryant Irvin Road Intersection Improvements?

City of Fort Worth is the property owner/developer of record for Camp Bowie Boulevard & Bryant Irvin Road Intersection Improvements, per its TDLR project registration.

Who is the architect or design firm for Camp Bowie Boulevard & Bryant Irvin Road Intersection Improvements?

Kimley-Horn is the design firm of record for Camp Bowie Boulevard & Bryant Irvin Road Intersection Improvements, according to its TDLR filing.

How much does Camp Bowie Boulevard & Bryant Irvin Road Intersection Improvements cost and how big is it?

Camp Bowie Boulevard & Bryant Irvin Road Intersection Improvements has an estimated construction value of $116K and approximately 3,780 square feet (about $31/sqft), based on its TDLR filing.

Scope of Work

Installation of turn lanes, crosswalks, sidewalks, curb ramps, signage, and pavement markings. 420SY of prop sidewalk.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

5930 Camp Bowie Blvd, Fort Worth, TX, 76107

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 76107 (Fort Worth)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Fort Worth?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.