Project intelligenceTDLR TABS2025013202Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

600 Building Renovation & Middle School Restroom Addition (1)

800 N Rancho Rd, Nixon, TX, 78140

Construction complete · May 2026Inspection Complete

600 Building Renovation & Middle School Restroom Addition (1) is a renovation/alteration project at 800 N Rancho Rd, Nixon, in Gonzales County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2026). The project has an estimated value of $1.4M across about 9,544 sq ft.

Estimated project value
$1.4M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
9,544 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$147/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
8 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Mar 3, 2025445 days across supplied datesMay 22, 2026

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    90 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    245 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    110 days after the preceding date shown.

    Source: TDLR filing

    View source record

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78140 (Nixon)

One email per change. Unsubscribe in one click. Privacy.

600 Building Renovation & Middle School Restroom Addition (1) is a Renovation/Alteration project located at 800 N Rancho Rd, Nixon, TX 78140 in Nixon, Texas. The project has an estimated value of $1.4M covering 9,544 sq ft. Nixon-Smiley Consolidated ISD is the property owner and LaMarr Womack & Associates LP is the design firm of record. The project was registered with TDLR on March 3, 2025.

Frequently Asked Questions

What is 600 Building Renovation & Middle School Restroom Addition (1)?

600 Building Renovation & Middle School Restroom Addition (1) is a renovation/alteration project at 800 N Rancho Rd in Nixon, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior finish & ADA restrooms.

Is 600 Building Renovation & Middle School Restroom Addition (1) open in Nixon?

Construction on 600 Building Renovation & Middle School Restroom Addition (1) is complete — TDLR records show the project passed its required accessibility inspection in May 2026. The building is finished and very likely open.

Where is 600 Building Renovation & Middle School Restroom Addition (1) located?

600 Building Renovation & Middle School Restroom Addition (1) is located at 800 N Rancho Rd, Nixon, TX, 78140, in Gonzales County.

Who is the owner or developer of 600 Building Renovation & Middle School Restroom Addition (1)?

Nixon-Smiley Consolidated ISD is the property owner/developer of record for 600 Building Renovation & Middle School Restroom Addition (1), per its TDLR project registration.

Who is the architect or design firm for 600 Building Renovation & Middle School Restroom Addition (1)?

LaMarr Womack & Associates LP is the design firm of record for 600 Building Renovation & Middle School Restroom Addition (1), according to its TDLR filing.

How much does 600 Building Renovation & Middle School Restroom Addition (1) cost and how big is it?

600 Building Renovation & Middle School Restroom Addition (1) has an estimated construction value of $1.4M and approximately 9,544 square feet (about $147/sqft), based on its TDLR filing.

Scope of Work

Interior finish & ADA restrooms.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

800 N Rancho Rd, Nixon, TX, 78140

Location by street address

Watch all construction in 78140 (Nixon)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.