Project intelligenceTDLR TABS2025013958New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Walnut St. Pedestrian Improvements - Walnut St. Corridor, First St. & Mars Dr. in Garland, TX

Walnut St. from N 4th St. to N Country Club Rd., Garland, TX, 75040

Target date passed (Dec 2025)Project Registered

Walnut St. Pedestrian Improvements - Walnut St. Corridor, First St. & Mars Dr. is a new construction project at Walnut St. from N 4th St. to N Country Club Rd., Garland, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Dec 2025 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $2.4M across about 72,000 sq ft.

Estimated project value
$2.4M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
72,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$33/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
9 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Mar 12, 2025282 days across supplied datesDec 19, 2025

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    26 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    256 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Walnut St. Pedestrian Improvements - Walnut St. Corridor, First St. & Mars Dr.

Walnut St. Pedestrian Improvements - Walnut St. Corridor, First St. & Mars Dr. is a new construction project by the City of Garland valued at $2,400,000. The work involves building reinforced concrete sidewalks along 12,000 linear feet of Walnut Street between N 4th St. and N Country Club Rd., plus 530 linear feet on First Street. The total estimated area is 72,000 square feet.

GEI Consultants serves as the design firm of record, with Ernesto Sarabia listed as the registered accessibility specialist. The project was registered with TDLR in March 2025, with construction scheduled to begin in April 2025 and a target completion date of December 2025. The estimated cost per square foot is $33, which is below the county median of $125 for similar new construction filings in Dallas County.

Project Status and Scope

The filing details the scope as 12,000 LF of 6' Reinforced Concrete Sidewalk Construction on Walnut Street and 2,400 LF of 8' Reinforced Sidewalk Construction. It also includes 530 LF of 6' Reinforced Concrete Sidewalk Construction on First Street. The scheduled build window of 256 days is close to the county median of 243 days. The project is located in the South Dallas area of Garland, TX 75040.

No plan review or inspection has been recorded since registration, so whether the project proceeded as scheduled is not confirmed in the public record. The TDLR status remains Project Registered. The project involves public funds and is part of the City of Garland's infrastructure improvements, which include six other TDLR-registered projects totaling $57,909,975.

GEI Consultants has designed six other TDLR-registered projects totaling $108,558,400, including work on Riverfront Boulevard in Dallas. Nearby businesses include Baylor Scott & White Community Care and The Winners Assembly. The area profile for ZIP 75040 indicates a population of about 64,205 and a median household income of $73,537 according to Census estimates.

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75040 (Garland)

One email per change. Unsubscribe in one click. Privacy.

Walnut St. Pedestrian Improvements - Walnut St. Corridor, First St. & Mars Dr. is a New Construction project located at Walnut St. from N 4th St. to N Country Club Rd., Garland, TX 75040 in Garland, Texas. The project has an estimated value of $2.4M covering 72,000 sq ft. City of Garland is the property owner and GEI Consultants is the design firm of record. The project was registered with TDLR on March 12, 2025.

Frequently Asked Questions

What is the name of this project?

The project is named Walnut St. Pedestrian Improvements - Walnut St. Corridor, First St. & Mars Dr. It is a new construction project in Garland, Texas.

What is being built on Walnut Street?

New reinforced concrete sidewalks are being constructed. The scope includes 12,000 linear feet of 6-foot wide sidewalk on Walnut Street and 530 linear feet of 6-foot wide sidewalk on First Street.

Who is the owner of this project?

The owner of record is the City of Garland. GEI Consultants is the design firm, and Ernesto Sarabia is the registered accessibility specialist.

What is the estimated cost?

The estimated cost is $2,400,000. This covers 72,000 square feet of new sidewalk construction in Garland, Texas.

Is the project finished?

The target completion date was December 2025. However, no plan review or inspection has been recorded, so the final status is not confirmed in the public record.

What is Walnut St. Pedestrian Improvements - Walnut St. Corridor, First St. & Mars Dr.?

Walnut St. Pedestrian Improvements - Walnut St. Corridor, First St. & Mars Dr. is a new construction project at Walnut St. from N 4th St. to N Country Club Rd. in Garland, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Walnut St: 12,000 LF of 6' Reinforced Concrete Sidewalk Construction, 2,400 LF of 8' Reinforced Sidewalk Construction First St.: 530 LF of 6' Reinforced Concrete Sidewalk Construction

Is Walnut St. Pedestrian Improvements - Walnut St. Corridor, First St. & Mars Dr. open in Garland?

Walnut St. Pedestrian Improvements - Walnut St. Corridor, First St. & Mars Dr. was scheduled to finish construction in Dec 2025 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Walnut St. Pedestrian Improvements - Walnut St. Corridor, First St. & Mars Dr. located?

Walnut St. Pedestrian Improvements - Walnut St. Corridor, First St. & Mars Dr. is located at Walnut St. from N 4th St. to N Country Club Rd., Garland, TX, 75040, in Dallas County.

Who is the owner or developer of Walnut St. Pedestrian Improvements - Walnut St. Corridor, First St. & Mars Dr.?

City of Garland is the property owner/developer of record for Walnut St. Pedestrian Improvements - Walnut St. Corridor, First St. & Mars Dr., per its TDLR project registration.

Who is the architect or design firm for Walnut St. Pedestrian Improvements - Walnut St. Corridor, First St. & Mars Dr.?

GEI Consultants is the design firm of record for Walnut St. Pedestrian Improvements - Walnut St. Corridor, First St. & Mars Dr., according to its TDLR filing.

How much does Walnut St. Pedestrian Improvements - Walnut St. Corridor, First St. & Mars Dr. cost and how big is it?

Walnut St. Pedestrian Improvements - Walnut St. Corridor, First St. & Mars Dr. has an estimated construction value of $2.4M and approximately 72,000 square feet (about $33/sqft), based on its TDLR filing.

Scope of Work

Walnut St: 12,000 LF of 6' Reinforced Concrete Sidewalk Construction, 2,400 LF of 8' Reinforced Sidewalk Construction First St.: 530 LF of 6' Reinforced Concrete Sidewalk Construction

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Walnut St. from N 4th St. to N Country Club Rd., Garland, TX, 75040

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75040 (Garland)