Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Duck Creek to Audubon Trail Connection in Garland, TX
Audubon Park, Garland, TX, 75043
Duck Creek to Audubon Trail Connection is a new construction project at Audubon Park, Garland, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Sep 2027. The project has an estimated value of $1.7M across about 16,000 sq ft.
- Estimated project value
- $1.7M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 16,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $106/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 10 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
32 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
15 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
303 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Duck Creek to Audubon Trail Connection
The Duck Creek to Audubon Trail Connection is a new construction project in Audubon Park, Garland, TX 75043. This 16,000 sq ft facility includes a 12-foot wide concrete shared use path and a 120-foot long pedestrian bridge. The project is scheduled to finish in September 2027, with an estimated cost of $1,700,000.
Construction begins in November 2026 after TDLR completed plan review in October 2026. The project was registered in September 2026. Halff is the design firm of record, and Steven Schwartz is the registered accessibility specialist. The work involves public funds, public land, or is a Federally funded roadway project.
Scope and Scale
The scope of work focuses on the 12-foot wide concrete shared use path and the 120-foot long pedestrian bridge. The total square footage is 16,000 sq ft. The estimated cost of $1,700,000 equates to $106 per square foot. This cost is above the county median for its type, while the per-square-foot cost is below the county median of $125. The 303-day build window is close to the county median of 243 days.
The City of Garland has six other TDLR-registered projects totaling $56,309,975, including the Granville Arts Center and the Jack Coleman Tennis Center. Halff has designed six other projects totaling $22,246,932, such as the Brays Bayou Greenway and the Buffalo Bayou Greenway. This project adds to the city's infrastructure in Dallas County.
Local Context
The project is located in ZIP code 75043. U.S. Census ACS 2023 five-year estimates show a population of about 63,733 and a median household income of $75,454. There are 23,439 housing units, with a median owner-occupied home value of $253,300. Housing is mostly owner-occupied. The Dallas County unemployment rate was 3 percent in August 2026, lower than a year earlier. The project serves the local community by connecting trails in Audubon Park.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75043 (Garland)
One email per change. Unsubscribe in one click. Privacy.
Duck Creek to Audubon Trail Connection is a New Construction project located at Audubon Park, Garland, TX 75043 in Garland, Texas. The project has an estimated value of $1.7M covering 16,000 sq ft. City of Garland is the property owner and Halff is the design firm of record. The project was registered with TDLR on September 16, 2026.
Frequently Asked Questions
What is the exact scope of the new construction?
The project includes a 12-foot wide concrete shared use path and a 120-foot long pedestrian bridge. The total area is 16,000 sq ft.
Who is the design firm for this project?
Halff is the design firm of record for the Duck Creek to Audubon Trail Connection project.
When does construction start and finish?
Construction starts in November 2026 and is scheduled to finish in September 2027.
What is the estimated cost per square foot?
The estimated cost is $1,700,000 for 16,000 sq ft, resulting in a cost of $106 per sq ft.
Is the project funded by public money?
Yes, the project involves public funds, public land, or is a Federally funded roadway project.
What is Duck Creek to Audubon Trail Connection?
Duck Creek to Audubon Trail Connection is a new construction project at Audubon Park in Garland, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 12-foot Wide Concrete Shared Use Path with 120-foot Long Pedestrian Bridge
Is Duck Creek to Audubon Trail Connection open in Garland?
Duck Creek to Audubon Trail Connection is still under construction in Garland, TX, with an estimated completion of Sep 2027 according to its TDLR registration.
Where is Duck Creek to Audubon Trail Connection located?
Duck Creek to Audubon Trail Connection is located at Audubon Park, Garland, TX, 75043, in Dallas County.
Who is the owner or developer of Duck Creek to Audubon Trail Connection?
City of Garland is the property owner/developer of record for Duck Creek to Audubon Trail Connection, per its TDLR project registration.
Who is the architect or design firm for Duck Creek to Audubon Trail Connection?
Halff is the design firm of record for Duck Creek to Audubon Trail Connection, according to its TDLR filing.
How much does Duck Creek to Audubon Trail Connection cost and how big is it?
Duck Creek to Audubon Trail Connection has an estimated construction value of $1.7M and approximately 16,000 square feet (about $106/sqft), based on its TDLR filing.
Scope of Work
12-foot Wide Concrete Shared Use Path with 120-foot Long Pedestrian Bridge
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
Audubon Park, Garland, TX, 75043
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$499.5M totalWatch all construction in 75043 (Garland)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Garland?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.