Paul Davis Park Trail Improvements

20685 Grass Creek Rd, Garden Ridge, TX, 78266

Opening ~Dec 2026Project Registered

Paul Davis Park Trail Improvements is a new construction project at 20685 Grass Creek Rd, Garden Ridge, in Comal County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2026. The project has an estimated value of $160K across about 20,000 sq ft.

Estimated project value
$160K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
20,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$8/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

Explore the linked construction record and source history

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Sep 10, 202698 days across supplied datesDec 17, 2026

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    39 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    59 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Paul Davis Park Trail Improvements

The Paul Davis Park Trail Improvements project involves the new construction of a 6-foot wide by 4-inch thick stabilized decomposed granite trail at 20685 Grass Creek Rd in Garden Ridge. The City of Garden Ridge is the owner of record for this 20,000 sq ft site located in Comal County.

Halff serves as the design firm for the project, which is registered with TDLR under the accessibility specialist Tom Ellis. The estimated cost for the work is $160,000, resulting in a computed cost of $8 per square foot.

Scope and Schedule

The scope of work includes the completion of the proposed trail and associated site work. The project was registered with TDLR in September 2026; plan review is pending and completion is targeted for December 2026. The scheduled build window is 59 days, which is shorter than the county median of 232 days for similar new construction filings.

Financially, the project cost is below the county median for its type. In Comal County, the median estimated cost for new construction is $777,000, with a median size of 7,665 sq ft. This project's specific cost per square foot is significantly lower than the county median of $125 per sq ft.

The site is located inside a FEMA Special Flood Hazard Area (zone A). The project involves public funds and public land. Halff has six other TDLR-registered projects totaling $22,406,932, including the Lockhart Aquatics Facility and the Buffalo Bayou Greenway.

Comal County unemployment was 4.4 percent in July 2026. The surrounding ZIP code 78266 has a population of about 7,274 residents and a median household income of $132,470 according to U.S. Census ACS 2023 estimates.

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78266 (Garden Ridge)

One email per change. Unsubscribe in one click. Privacy.

Paul Davis Park Trail Improvements is a New Construction project located at 20685 Grass Creek Rd, Garden Ridge, TX 78266 in Garden Ridge, Texas. The project has an estimated value of $160K covering 20,000 sq ft. City of Garden Ridge is the property owner and Halff is the design firm of record. The project was registered with TDLR on September 10, 2026.

Frequently Asked Questions

What is the estimated cost of the Paul Davis Park trail work?

The estimated cost for the trail improvements is $160,000. This figure covers the new construction of the 20,000 sq ft stabilized decomposed granite trail and associated site work.

When is the project targeted for completion?

The project is targeted for December 2026. It was registered with TDLR in September 2026, and the scheduled build window is 59 days from the start date.

Who is the design firm for this project?

Halff is the design firm of record for the Paul Davis Park Trail Improvements. The registered accessibility specialist listed on the filing is Tom Ellis.

Is the site in a flood zone?

Yes, the site at 20685 Grass Creek Rd is inside a FEMA Special Flood Hazard Area, specifically zone A, according to the National Flood Hazard Layer.

How does the cost compare to other projects in Comal County?

The $160,000 cost is below the county median of $777,000 for new construction. The computed cost of $8 per sq ft is also below the county median of $125 per sq ft.

What is Paul Davis Park Trail Improvements?

Paul Davis Park Trail Improvements is a new construction project at 20685 Grass Creek Rd in Garden Ridge, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The Project generally consists of but is not limited to the following: 6’ wide by 4” thick stabilized decomposed granite trail and associate site work for the completion of the proposed project.

Is Paul Davis Park Trail Improvements open in Garden Ridge?

Paul Davis Park Trail Improvements is still under construction in Garden Ridge, TX, with an estimated completion of Dec 2026 according to its TDLR registration.

Where is Paul Davis Park Trail Improvements located?

Paul Davis Park Trail Improvements is located at 20685 Grass Creek Rd, Garden Ridge, TX, 78266, in Comal County.

Who is the owner or developer of Paul Davis Park Trail Improvements?

City of Garden Ridge is the property owner/developer of record for Paul Davis Park Trail Improvements, per its TDLR project registration.

Who is the architect or design firm for Paul Davis Park Trail Improvements?

Halff is the design firm of record for Paul Davis Park Trail Improvements, according to its TDLR filing.

How much does Paul Davis Park Trail Improvements cost and how big is it?

Paul Davis Park Trail Improvements has an estimated construction value of $160K and approximately 20,000 square feet (about $8/sqft), based on its TDLR filing.

Scope of Work

The Project generally consists of but is not limited to the following: 6’ wide by 4” thick stabilized decomposed granite trail and associate site work for the completion of the proposed project.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

20685 Grass Creek Rd, Garden Ridge, TX, 78266

29.63346, -98.30646

Watch all construction in 78266 (Garden Ridge)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Garden Ridge?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.