Lenox Hotel is a renovation/alteration project at 216 Overland Avenue, El Paso, TX 79901, in El Paso County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $100K across about 30,926 sq ft.
Design review complete, construction may proceed
Lenox Hotel is a Renovation/Alteration project located at 216 Overland Avenue, El Paso, TX 79901 in El Paso, Texas. The project has an estimated value of $100K covering 30,926 sq ft. 501 Western LLC is the property owner and Materia Architecture Studio is the design firm of record. The project was registered with TDLR on March 17, 2025.
Lenox Hotel is a renovation/alteration project at 216 Overland Avenue, El Paso, TX 79901 in El Paso, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: terabit unorivenebt fir exustubg 30,928 sf three story building with basement and mezzanine containing new restrooms in the basement floor for events venue on level 1 and mezzanine
Lenox Hotel is currently under construction in El Paso, TX. Its current TDLR status is "Review Complete".
Lenox Hotel is located at 216 Overland Avenue, El Paso, TX 79901, El Paso, TX, 79901, in El Paso County.
501 Western LLC is the property owner/developer of record for Lenox Hotel, per its TDLR project registration.
Materia Architecture Studio is the design firm of record for Lenox Hotel, according to its TDLR filing.
Lenox Hotel has an estimated construction value of $100K and approximately 30,926 square feet (about $3/sqft), based on its TDLR filing.
terabit unorivenebt fir exustubg 30,928 sf three story building with basement and mezzanine containing new restrooms in the basement floor for events venue on level 1 and mezzanine
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Mar 17, 2025
Review Complete
Mar 17, 2025
Inspection Complete
Closed