Project intelligenceTDLR TABS2025014717New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Sidewalk Improvements with Precinct 2

4760 Avenue J, Houston, TX, 77011

Target date passed (Apr 2026)Review Complete

Sidewalk Improvements with Precinct 2 is a new construction project at 4760 Avenue J, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Apr 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $750K across about 15,000 sq ft.

Estimated project value
$750K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
15,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$50/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
8 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Mar 20, 2025379 days across supplied datesApr 3, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    137 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    242 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77011 (Houston)

One email per change. Unsubscribe in one click. Privacy.

Sidewalk Improvements with Precinct 2 is a New Construction project located at 4760 Avenue J, Houston, TX 77011 in Houston, Texas. The project has an estimated value of $750K covering 15,000 sq ft. Harrisburg Redevelopment Authority (TIRZ 23) is the property owner and Gauge Engineering is the design firm of record. The project was registered with TDLR on March 20, 2025.

Frequently Asked Questions

What is Sidewalk Improvements with Precinct 2?

Sidewalk Improvements with Precinct 2 is a new construction project at 4760 Avenue J in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Project consists of sidewalk and ramp improvements in an area predominantly without sidewalks.

Is Sidewalk Improvements with Precinct 2 open in Houston?

Sidewalk Improvements with Precinct 2 was scheduled to finish construction in Apr 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Sidewalk Improvements with Precinct 2 located?

Sidewalk Improvements with Precinct 2 is located at 4760 Avenue J, Houston, TX, 77011, in Harris County.

Who is the owner or developer of Sidewalk Improvements with Precinct 2?

Harrisburg Redevelopment Authority (TIRZ 23) is the property owner/developer of record for Sidewalk Improvements with Precinct 2, per its TDLR project registration.

Who is the architect or design firm for Sidewalk Improvements with Precinct 2?

Gauge Engineering is the design firm of record for Sidewalk Improvements with Precinct 2, according to its TDLR filing.

How much does Sidewalk Improvements with Precinct 2 cost and how big is it?

Sidewalk Improvements with Precinct 2 has an estimated construction value of $750K and approximately 15,000 square feet (about $50/sqft), based on its TDLR filing.

Scope of Work

Project consists of sidewalk and ramp improvements in an area predominantly without sidewalks.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

4760 Avenue J, Houston, TX, 77011

Location by street address

Watch all construction in 77011 (Houston)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.