Project intelligenceTDLR TABS2025015011Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

Love's 298 EV Charging Staton

28527 I-35, Encinal, TX, 78019

Construction complete · Aug 2026Project Closed

Love's 298 EV Charging Staton is a renovation/alteration project at 28527 I-35, Encinal, in La Salle County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2026). The project has an estimated value of $600K across about 1,600 sq ft.

Estimated project value
$600K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1,600 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$375/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Mar 25, 2025499 days across supplied datesAug 6, 2026

6 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    67 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    92 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    163 days after the preceding date shown.

    Source: TDLR filing

    View source record
  6. Project closed · TDLR filing

    The project record was closed in TDLR.

    177 days after the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78019 (Encinal)

One email per change. Unsubscribe in one click. Privacy.

Love's 298 EV Charging Staton is a Renovation/Alteration project located at 28527 I-35, Encinal, TX 78019 in Encinal, Texas. The project has an estimated value of $600K covering 1,600 sq ft. Love's Travel Stops & Country Stores Inc. is the property owner and Larson Design Group is the design firm of record. The project was registered with TDLR on March 25, 2025.

Frequently Asked Questions

What is Love's 298 EV Charging Staton?

Love's 298 EV Charging Staton is a renovation/alteration project at 28527 I-35 in Encinal, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Installation of two dual electric vehicle charging stations, four powerblock modules, one 2000A electrical switchgear

Is Love's 298 EV Charging Staton open in Encinal?

Construction on Love's 298 EV Charging Staton is complete — TDLR records show the project passed its required accessibility inspection in Aug 2026. The building is finished and very likely open.

Where is Love's 298 EV Charging Staton located?

Love's 298 EV Charging Staton is located at 28527 I-35, Encinal, TX, 78019, in La Salle County.

Who is the owner or developer of Love's 298 EV Charging Staton?

Love's Travel Stops & Country Stores Inc. is the property owner/developer of record for Love's 298 EV Charging Staton, per its TDLR project registration.

Who is the architect or design firm for Love's 298 EV Charging Staton?

Larson Design Group is the design firm of record for Love's 298 EV Charging Staton, according to its TDLR filing.

How much does Love's 298 EV Charging Staton cost and how big is it?

Love's 298 EV Charging Staton has an estimated construction value of $600K and approximately 1,600 square feet (about $375/sqft), based on its TDLR filing.

Scope of Work

Installation of two dual electric vehicle charging stations, four powerblock modules, one 2000A electrical switchgear

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

28527 I-35, Encinal, TX, 78019

Location by street address

Watch all construction in 78019 (Encinal)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.