Encinal, TX Construction Projects

What's being built in Encinal — 17 projects on file from Texas public records

17
Total Projects
$24.4M
Total Investment
8
New Construction
9
Renovations
151K
Total Sq Ft
$1.4M
Avg. Value

What is being built in Encinal, Texas?

Encinal, Texas has 17 construction and development projects on file worth $24.4M — 8 new construction and 9 renovations or remodels, 1 of them filed in the last six months. Each record is a real filing from Texas public construction records and names the project, its declared value and the date it was registered.

What new businesses are coming to Encinal?

The most recently filed new-construction projects in Encinal are Encinal Food Pantry ($1.3M), Parking Lot Improvements ($126K), Encinal Rosalie Welhausen City Park ($150K), LA SALLE COUNTY ENCINAL COMMUNITY CENTER ($4.5M). A new-construction filing is the earliest public signal that something new is being built, usually well before it opens, so this list leads street-level visibility rather than following it.

La Salle County Economy

Driving Encinal construction · FRED

Unemployment:4.2%
Zabalist / visual intelligence

See the shape of development

Compare project scale, registration dates, and locations across 17 loaded TDLR filings. This is the loaded selection, not a measure of every project in the market.

Encinal
Estimated construction value$24.4MSum of 17 shown records with value
Records in view17 / 17Ready to inspect and compare
Largest record’s share18.4%Share of reported value shown
01

Where the value sits

Area = reported value
Select a block to inspect0 without reported value
Encinal

Comparisons use only these 17 records. Missing values are excluded from totals. Recorded value is not revenue or a quality rating.

Construction & Development in Encinal, Texas

Encinal is experiencing significant construction and development activity with 17 registered projects valued at $24.4M. The city's development portfolio includes 8 new construction projects and 9 renovation projects, representing 150,757 square feet of built space across commercial, residential, and mixed-use developments.

Development Activity

  • 8 new construction projects (47%)
  • 9 renovation/remodel projects (53%)
  • Average project value: $1.4M
  • 1 new projects in last 6 months

Key Players

Encinal's construction market features 5 major property owners and 5 active design firms driving development across the city.

Leading developers include COTULLA ISD and ROB LEWIS, working with architecture firms such as PASCAL AUGHTRY & ASSOCIATES and RHEILANDER ARCHITECTS.

Our database tracks all TDLR-registered construction projects in Encinal. Projects span La Salle counties, providing comprehensive coverage of commercial construction, residential development, and infrastructure improvements throughout Encinal and the surrounding area.

1 New Projects
Registered in the last 6 months

All Projects

17 TDLR · 0 Site Plans

Showing 17 of 17 listed TDLR filings

Registered
$1.3M

Encinal Food Pantry

Intersection of Alpine Street and S. Frost Street, Encinal, TX 78019

1,008 sqftSep 2, 2026

Encinal construction questions

How many construction projects are there in Encinal, Texas?
There are 17 registered construction projects in Encinal, Texas with a total estimated value of $24.4M and 150,757 square feet of development. The average project is valued at $1.4M.
What kind of construction is happening in Encinal?
Encinal has 8 new construction projects (47%) and 9 renovation or remodel projects (53%) on file, together totaling 150,757 square feet. Work spans commercial, residential and mixed-use development.
Who is building in Encinal?
The most active property owners on file in Encinal are COTULLA ISD, ROB LEWIS, LOVE'S TRAVEL STOPS. The architecture and design firms appearing most often on Encinal filings are PASCAL AUGHTRY & ASSOCIATES, RHEILANDER ARCHITECTS, ALAMO ARCHITECTS.
Where does this Encinal construction data come from?
Every project on this page is a TDLR-registered construction filing from Texas public records, not an estimate or a listing. Each entry keeps the project name, declared value, owner and registration date exactly as filed, which is why a project can appear here months before any visible work starts on site.

Figures on this page are counted from the Encinal filings themselves and change as new records are registered. How Zabalist sources Texas construction records.