CohnReznick
CohnReznick is a renovation/alteration project at 301 Congress, Suite 2000, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2025). The project has an estimated value of $600K across about 6,337 sq ft.
๐Project Metrics
TDLR #TABS2025015039Project Closed
Project has been completed and closed
CohnReznick is a Renovation/Alteration project located at 301 Congress, Suite 2000, Austin, TX 78701 in Austin, Texas. The project has an estimated value of $600K covering 6,337 sq ft. PR 301 CONGRESS LP is the property owner and Interior Architects is the design firm of record. The project was registered with TDLR on March 25, 2025.
โFrequently Asked Questions
What is CohnReznick?
CohnReznick is a renovation/alteration project at 301 Congress, Suite 2000 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior renovation of existing suite, including adding offices and conference rooms as well as upgrades to the break room including associated MEP scope.
Is CohnReznick open in Austin?
Construction on CohnReznick is complete โ TDLR records show the project passed its required accessibility inspection in Mar 2025. The building is finished and very likely open.
Where is CohnReznick located?
CohnReznick is located at 301 Congress, Suite 2000, Austin, TX, 78701, in Travis County.
Who is the owner or developer of CohnReznick?
PR 301 CONGRESS LP is the property owner/developer of record for CohnReznick, per its TDLR project registration.
Who is the architect or design firm for CohnReznick?
Interior Architects is the design firm of record for CohnReznick, according to its TDLR filing.
How much does CohnReznick cost and how big is it?
CohnReznick has an estimated construction value of $600K and approximately 6,337 square feet (about $95/sqft), based on its TDLR filing.
๐Scope of Work
Interior renovation of existing suite, including adding offices and conference rooms as well as upgrades to the break room including associated MEP scope.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 25, 2025
Review Complete
Inspection Complete
Closed
Mar 25, 2025
๐Related Projects
๐คSame Owner
$28.4M total๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work HVAC Changeout/Alteration
15 DAY - interior renovation of an existing Universal Technical Institute occupied space. New work to include new utilities required to support HVACR training equipment. No change of use or work to the exterior. - OVA
15 DAY - interior renovation of an existing Universal Technical Institute occupied space. New work to include new utilities required to support HVACR training equipment. No change of use or work to the exterior. - OVA
7 DAY - fire damage. Replace roof replace siding replace 2 balconies replace trusses drywall lights in corridor painting exterior. - OVA
Replace kitchen outlets with GFCI bring garbage disposal hook up to code Install CIP concrete ramp and landing at front door to driveway.