FM 2552 (CSJ: 1179-03-012) in Weatherford, TX

At Black Warrior Branch, Weatherford, TX, 76086

Opening ~Jun 2027Review Complete

FM 2552 (CSJ: 1179-03-012) is a new construction project at At Black Warrior Branch, Weatherford, in Parker County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jun 2027. The project has an estimated value of $6.0M across about 6,813 sq ft.

Estimated project value
$6.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
6,813 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$877/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1 year
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 2, 2025819 days across supplied datesJun 30, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    468 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    351 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About FM 2552 (CSJ: 1179-03-012)

TxDOT District: Fort Worth is replacing a bridge and reconstructing the approach roadway on FM 2552 at Black Warrior Branch in Weatherford. The project, identified in filings as FM 2552 (Csj: 1179-03-012), involves new construction with an estimated cost of $5,973,098. The structure covers 6,813 sq ft, resulting in a computed cost of $877 per square foot. This infrastructure work is scheduled to finish in June 2027, with construction starting in July 2026.

Teague Nall and Perkins, Inc. serves as the design firm of record for this Parker County project. The site is located inside a FEMA Special Flood Hazard Area, specifically zone AE, which is a designated floodway. This environmental classification is a critical factor in the engineering and construction planning for the bridge replacement and roadway reconstruction. The project involves public funds and is a Federally funded roadway project.

Project Context and Costs

The estimated cost of $5,973,098 places this project in the top quarter of new construction filings in Parker County. The county median estimated cost for similar work is $800,000, with the middle half of projects ranging from $350,000 to $2,143,000. The scheduled build window for this bridge project is 351 days, which is longer than the county median of 212 days for new construction. The $877 per square foot cost is significantly above the county median of $133 per square foot, reflecting the specialized nature of bridge work compared to general building construction.

TxDOT District: Fort Worth has six other TDLR-registered projects totaling $3,529,565. These include projects in Fort Worth with costs ranging from $59,381 to $517,000. Teague Nall and Perkins, Inc. has designed six other TDLR-registered projects totaling $16,476,341. Notable projects by this firm include a $6,749,126 roadway reconstruction in Garland and a $3,700,000 project in Dallas. The firm’s experience with large-scale infrastructure work supports its role in this Weatherford bridge project.

Local Area and Registration

Weatherford, in Parker County, has a population of about 22,900 according to U.S. Census ACS 2023 five-year estimates for ZIP 76086. The median household income is $61,415, and the median owner-occupied home value is $235,100. The housing market in this area is an even mix of owner- and renter-occupied. The Parker County unemployment rate was 4.1 percent in June 2026, higher than a year earlier, according to FRED data.

The project was registered with TDLR in April 2025, and plan review was completed in the same month. The TDLR status is Review Complete. Frank Fonseca is the registered accessibility specialist for this project. Third-party listings on ConstructConnect identify this as a Texas Department of Transportation project in Weatherford, Texas. The project is part of a broader set of infrastructure developments in the area, including other new construction and renovation projects in Weatherford.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76086 (Weatherford)

One email per change. Unsubscribe in one click. Privacy.

FM 2552 (CSJ: 1179-03-012) is a New Construction project located at At Black Warrior Branch in Weatherford, Texas. The project has an estimated value of $6.0M covering 6,813 sq ft. TxDOT District: Fort Worth is the property owner and Teague Nall and Perkins, Inc. is the design firm of record. The project was registered with TDLR on April 2, 2025.

Frequently Asked Questions

What is the estimated cost of the bridge project on FM 2552?

The estimated cost for the bridge replacement and roadway reconstruction on FM 2552 in Weatherford is $5,973,098. This figure is from the TDLR filing and places the project in the top quarter of new construction costs in Parker County.

When is construction scheduled to start and finish?

Construction is scheduled to start in July 2026 and is scheduled to finish in June 2027. The total build window is 351 days, which is longer than the county median of 212 days for new construction projects.

Who is the design firm for this TxDOT project?

Teague Nall and Perkins, Inc. is the design firm of record for the FM 2552 bridge project. The firm has designed other large infrastructure projects in Texas, including a $6.7 million roadway reconstruction in Garland.

Is the project site in a flood zone?

Yes, the site at Black Warrior Branch is inside a FEMA Special Flood Hazard Area, specifically zone AE, which is a designated floodway. This classification is noted in the project facts and influences construction planning.

What is the TDLR status of this project?

The TDLR status is Review Complete. Plan review was completed in April 2025, the same month the project was registered with TDLR. The project is ready for construction, which is scheduled to begin in July 2026.

What is FM 2552 (CSJ: 1179-03-012)?

FM 2552 (CSJ: 1179-03-012) is a new construction project at At Black Warrior Branch in Weatherford, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Replacing Bridge and Reconstructing approach roadway.

Is FM 2552 (CSJ: 1179-03-012) open in Weatherford?

FM 2552 (CSJ: 1179-03-012) is still under construction in Weatherford, TX, with an estimated completion of Jun 2027 according to its TDLR registration.

Where is FM 2552 (CSJ: 1179-03-012) located?

FM 2552 (CSJ: 1179-03-012) is located at At Black Warrior Branch, Weatherford, TX, 76086, in Parker County.

Who is the owner or developer of FM 2552 (CSJ: 1179-03-012)?

TxDOT District: Fort Worth is the property owner/developer of record for FM 2552 (CSJ: 1179-03-012), per its TDLR project registration.

Who is the architect or design firm for FM 2552 (CSJ: 1179-03-012)?

Teague Nall and Perkins, Inc. is the design firm of record for FM 2552 (CSJ: 1179-03-012), according to its TDLR filing.

How much does FM 2552 (CSJ: 1179-03-012) cost and how big is it?

FM 2552 (CSJ: 1179-03-012) has an estimated construction value of $6.0M and approximately 6,813 square feet (about $877/sqft), based on its TDLR filing.

Scope of Work

Replacing Bridge and Reconstructing approach roadway.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

At Black Warrior Branch, Weatherford, TX, 76086

Loading location map…
32.75568, -97.78587

Watch all construction in 76086 (Weatherford)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Weatherford?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.