Project intelligenceTDLR TABS2025016171Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Security Vestibule - Zavala in Austin, TX

310 Robert T Martinez Jr St, Austin, TX, 78702

Construction complete · Jan 2026Project Closed

Security Vestibule - Zavala is a renovation/alteration project at 310 Robert T Martinez Jr St, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2026). The project has an estimated value of $240K across about 1,112 sq ft.

Estimated project value
$240K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1,112 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$216/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 8, 2025296 days across supplied datesJan 29, 2026

6 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    48 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    67 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    132 days after the preceding date shown.

    Source: TDLR filing

    View source record
  6. Project closed · TDLR filing

    The project record was closed in TDLR.

    49 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Security Vestibule - Zavala

The TDLR record for the Security Vestibule renovation at Zavala Elementary School is now complete. The project closed the project file in January 2026, marking the end of the accessibility review process for this construction. The work involved an interior remodel of the existing school facility located at 310 Robert T Martinez Jr St in Austin, Texas.

Austin Independent School District served as the owner of record for this 1,112 sq ft renovation. The estimated cost for the project was $240,000, which equates to $216 per square foot. Smith Holt Architecture and Project Management was the design firm of record, and Mark S Robinson was the registered accessibility specialist. The project was registered with TDLR in April 2025, and plan review was completed in the same month.

Construction Timeline and Scope

Construction began in May 2025, with a scheduled completion date of August 2025. The actual final inspection passed in December 2025. This timeline indicates that the construction phase extended beyond the initial scheduled window. The scope of work was specifically an interior remodel, focusing on the security vestibule area of the school. The project involved public funds and was conducted on public land.

In the context of Travis County renovation filings, this project’s estimated cost is below the county median of $299,975. The scheduled build window of 67 days was shorter than the county median of 98 days. However, the cost per square foot of $216 is above the county median of $103. Austin Independent School District has six other TDLR-registered projects totaling $8,112,002, including work at Covington Middle School and Noack Sports Complex. Smith Holt Architecture and Project Management has six other registered projects totaling $1,420,000, such as work at Galindo Elementary School.

City of Austin permit records show six permits on file at this street address between June 2025 and June 2026. These include two electrical permits, two building permits, one plumbing permit, and one mechanical permit. Four of these permits have a final status. The most recent permits describe the installation of new doors and an interior remodel of an existing school. The area profile for ZIP code 78702 indicates a population of about 26,495 and a median household income of $101,304, according to U.S. Census ACS 2023 five-year estimates.

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78702 (Austin)

One email per change. Unsubscribe in one click. Privacy.

Security Vestibule - Zavala is a Renovation/Alteration project located at 310 Robert T Martinez Jr St, Austin, TX 78702 in Austin, Texas. The project has an estimated value of $240K covering 1,112 sq ft. Austin Independent School District is the property owner and Smith Holt Architecture and Project Management is the design firm of record. The project was registered with TDLR on April 8, 2025.

Frequently Asked Questions

What is the current status of the Zavala Elementary renovation?

The TDLR record shows the project is closed. The file was closed in January 2026, and the final inspection passed in December 2025.

Who is the owner of the Zavala Elementary project?

Austin Independent School District is the owner of record for this renovation project at 310 Robert T Martinez Jr St.

How much did the Zavala Elementary vestibule renovation cost?

The estimated cost for the 1,112 sq ft interior remodel was $240,000.

When was the Zavala Elementary construction completed?

The final inspection passed in December 2025, and the TDLR project file was closed in January 2026.

Is the Zavala Elementary school open?

The construction record indicates the renovation is complete and the project file is closed. It does not specify current school operational hours or opening status.

What is Security Vestibule - Zavala?

Security Vestibule - Zavala is a renovation/alteration project at 310 Robert T Martinez Jr St in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior remodel of an existing school.

Is Security Vestibule - Zavala open in Austin?

Construction on Security Vestibule - Zavala is complete — TDLR records show the project passed its required accessibility inspection in Jan 2026. The building is finished and very likely open.

Where is Security Vestibule - Zavala located?

Security Vestibule - Zavala is located at 310 Robert T Martinez Jr St, Austin, TX, 78702, in Travis County.

Who is the owner or developer of Security Vestibule - Zavala?

Austin Independent School District is the property owner/developer of record for Security Vestibule - Zavala, per its TDLR project registration.

Who is the architect or design firm for Security Vestibule - Zavala?

Smith Holt Architecture and Project Management is the design firm of record for Security Vestibule - Zavala, according to its TDLR filing.

How much does Security Vestibule - Zavala cost and how big is it?

Security Vestibule - Zavala has an estimated construction value of $240K and approximately 1,112 square feet (about $216/sqft), based on its TDLR filing.

Scope of Work

Interior remodel of an existing school.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

310 Robert T Martinez Jr St, Austin, TX, 78702

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Related City Permits

Building permits found at or near this location

3105 MC ELROY DR

Construct new driveway approach of 18 FT. No sidewalk inspection per plan review.

ActiveDriveway / SidewalksNewOct 2026
View Details
2025-155730 DS
Hyper Construction
3102 WHITE ROCK DR

ePlan: Residential Expedited Review - New Construction of 2-Story Single Family Res [5bed 6.5bath] with attached garage/carport covd porch

ActiveBuilding PermitNewOct 2026
View Details
2026-138550 BP
Blue Wizard Homes LLC
3104 YELLOWPINE TER

Excavate 45 tunnel to repair the main drain under the house / excavate 15 trench to repair the main drain line in the yard

ActivePlumbing PermitRepairOct 2026
View Details
2026-135565 PP
Radiant Plumbing & AC
3106 SILVERLEAF DR

1-story addition/remodel to existing residence. 3 bed/2.5 bath

ActiveMechanical PermitAddition and RemodelOct 2026
View Details
2026-018771 MP
Airtron
3105 HATLEY DR

Total demo of SFR 1842 SqFt circa 1955

ActiveBuilding PermitDemolitionOct 2026
View Details
2026-123845 BP
Paradisa Homes, LLC***MAIN***

Watch all construction in 78702 (Austin)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.