Project intelligenceTDLR TABS2025016277New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Gene Tomas High School Stadium in Richmond, TX

7902 FM 723, Richmond, TX, 77406

Construction complete · Jun 2026Project Closed

Gene Tomas High School Stadium is a new construction project at 7902 FM 723, Richmond, in Fort Bend County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2026). The project has an estimated value of $24.5M across about 21,421 sq ft.

Estimated project value
$24.5M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
21,421 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$1.14K/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
11 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Sep 2, 2024656 days across supplied datesJun 20, 2026

6 timeline dates shown.

  1. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Source: TDLR filing

    View source record
  2. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    219 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    115 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    185 days after the preceding date shown.

    Source: TDLR filing

    View source record
  6. Project closed · TDLR filing

    The project record was closed in TDLR.

    137 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Gene Tomas High School Stadium

The Gene Tomas High School Stadium project in Richmond, Texas, is a new construction effort valued at $24,500,000. Located at 7902 FM 723 in Fort Bend County, the facility spans 21,421 square feet. The primary scope of work includes added concessions, a press box, and locker room buildings designed to support the existing competition track and field infrastructure.

Lamar CISD serves as the owner of record, while PBK Architects is the design firm responsible for the project. William T Winning registered as the accessibility specialist for this build. The TDLR record indicates that construction started in September 2024. The filing listed an estimated completion date of August 2025, but the final inspection did not pass until February 2026.

The project involved public funds and public land. It was registered with TDLR in April 2025, and plan review was completed in the same month. TDLR closed the project file in June 2026, which marks the end of the accessibility review process for this construction. This status confirms that the regulatory requirements for the accessibility review have been satisfied and the file is no longer active.

Comparative Context

Among 4152 new construction filings in Fort Bend County, this project's cost is above the county median. The median estimated cost for such filings is $700,000, with the middle half ranging from $260,000 to $1,800,000. The median size for these projects is 9,215 square feet, whereas this stadium project is significantly larger at 21,421 square feet. The cost per square foot for this project is $1,144, which is above the county median of $100 per square foot.

The scheduled build window for this project was 334 days, which is longer than the county median of 201 days. Lamar CISD has six other TDLR-registered projects totaling $197,894,426, including several elementary schools in Richmond, Brookshire, and Beasley. PBK Architects has six other registered projects totaling $118,327,737, including work in Katy and Houston.

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77406 (Richmond)

One email per change. Unsubscribe in one click. Privacy.

Gene Tomas High School Stadium is a New Construction project located at 7902 FM 723, Richmond, TX 77406 in Richmond, Texas. The project has an estimated value of $24.5M covering 21,421 sq ft. Lamar CISD is the property owner and PBK Architects is the design firm of record. The project was registered with TDLR on April 9, 2025.

Frequently Asked Questions

Is the Gene Tomas High School Stadium open?

The TDLR record indicates the project file was closed in June 2026 after the final inspection passed in February 2026. This confirms the construction and accessibility review are complete, but the record does not specify a public opening date.

Who is the owner of the stadium project?

Lamar CISD is the owner of record for the Gene Tomas High School Stadium project in Richmond, Texas.

What was the total cost of the new construction?

The estimated cost for the new construction of the stadium, including concessions and locker rooms, was $24,500,000.

When did the construction start and finish?

Construction started in September 2024. The final inspection passed in February 2026, and TDLR closed the project file in June 2026.

Who designed the stadium facility?

PBK Architects is the design firm of record for the Gene Tomas High School Stadium project.

What is Gene Tomas High School Stadium?

Gene Tomas High School Stadium is a new construction project at 7902 FM 723 in Richmond, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Added concessions, press box, and locker room buildings in order to support existing competition track and field.

Is Gene Tomas High School Stadium open in Richmond?

Construction on Gene Tomas High School Stadium is complete — TDLR records show the project passed its required accessibility inspection in Jun 2026. The building is finished and very likely open.

Where is Gene Tomas High School Stadium located?

Gene Tomas High School Stadium is located at 7902 FM 723, Richmond, TX, 77406, in Fort Bend County.

Who is the owner or developer of Gene Tomas High School Stadium?

Lamar CISD is the property owner/developer of record for Gene Tomas High School Stadium, per its TDLR project registration.

Who is the architect or design firm for Gene Tomas High School Stadium?

PBK Architects is the design firm of record for Gene Tomas High School Stadium, according to its TDLR filing.

How much does Gene Tomas High School Stadium cost and how big is it?

Gene Tomas High School Stadium has an estimated construction value of $24.5M and approximately 21,421 square feet (about $1.14K/sqft), based on its TDLR filing.

Scope of Work

Added concessions, press box, and locker room buildings in order to support existing competition track and field.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

7902 FM 723, Richmond, TX, 77406

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 77406 (Richmond)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Richmond?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.