Funding type
This project is privately funded, on private land for private use.
Majors Fuel in Greenville, TX
1750 Jack Finney Boulevard, Greenville, TX, 75402
Majors Fuel is a new construction project at 1750 Jack Finney Boulevard, Greenville, in Hunt County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Sep 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $180K across about 6,050 sq ft.
- Estimated project value
- $180K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 6,050 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $30/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 1mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
3 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
144 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
394 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Majors Fuel
Majors Fuel is a new construction project for a convenience store located at 1750 Jack Finney Boulevard in Greenville, Texas. The filing describes the scope of work specifically as the construction of a C-Store. The building is designed to cover 6,050 square feet of space. This size is close to the median size of 6,045 square feet for new construction filings in Hunt County.
The estimated cost for this project is $180,000. This figure places the project in the bottom quarter of estimated costs for new construction filings in Hunt County. The estimated cost per square foot is $30, which is below the county median of $170 per square foot for similar filings. The project is privately funded on private land for private use.
Project Details and Status
Rakesh Patel is listed as the owner or developer of record for this site. Gandhi Designs, LLC is the design firm of record. The registered accessibility specialist for the project is David S Drepaul. The project was registered with TDLR in April 2025. The filing indicates a construction start date of September 2025. The status of the project is registered with TDLR. Plan review is pending for this filing. The completion date listed on the filing is targeted for September 2026. This scheduled build window spans 394 days, which is longer than the county median build window of 225 days for new construction projects in Hunt County.
Rakesh Patel has two other TDLR-registered projects, including Classic Collision in McKinney and Radisson Hotel in Corpus Christi. Gandhi Designs, LLC has six other registered projects across Texas, including Livsmart Studios By Hilton in Orange and Baskin Robbins in New Caney. The Hunt County unemployment rate was 4.9 percent in June 2026.
Project Registered
Project has been registered with TDLR and is in pre-construction phase
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75402 (Greenville)
One email per change. Unsubscribe in one click. Privacy.
Majors Fuel is a New Construction project located at 1750 Jack Finney Boulevard in Greenville, Texas. The project has an estimated value of $180K covering 6,050 sq ft. Rakesh Patel is the property owner and Gandhi Designs, LLC is the design firm of record. The project was registered with TDLR on April 10, 2025.
Frequently Asked Questions
Where is the Majors Fuel project located?
The project is located at 1750 Jack Finney Boulevard in Greenville, Texas, in Hunt County.
What is the estimated cost and size of the building?
The estimated cost is $180,000 for a building of 6,050 square feet.
Who is the developer and design firm?
Rakesh Patel is the owner/developer of record, and Gandhi Designs, LLC is the design firm of record.
Is the business currently open?
The TDLR record indicates plan review is pending and the project is targeted for September 2026, so it is not yet operational.
What is Majors Fuel?
Majors Fuel is a new construction project at 1750 Jack Finney Boulevard in Greenville, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of C-Store
Is Majors Fuel open in Greenville?
Majors Fuel was scheduled to finish construction in Sep 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Majors Fuel located?
Majors Fuel is located at 1750 Jack Finney Boulevard, Greenville, TX, 75402, in Hunt County.
Who is the owner or developer of Majors Fuel?
Rakesh Patel is the property owner/developer of record for Majors Fuel, per its TDLR project registration.
Who is the architect or design firm for Majors Fuel?
Gandhi Designs, LLC is the design firm of record for Majors Fuel, according to its TDLR filing.
How much does Majors Fuel cost and how big is it?
Majors Fuel has an estimated construction value of $180K and approximately 6,050 square feet (about $30/sqft), based on its TDLR filing.
Scope of Work
Construction of C-Store
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
1750 Jack Finney Boulevard, Greenville, TX, 75402
Related Projects
Same Owner
$2.8M totalWatch all construction in 75402 (Greenville)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Greenville?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.