Project intelligenceTDLR TABS2025016547New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Wink-Loving ISD Band Hall

200 Rosey Dodd Avenue, Wink, TX, 79789

Construction complete · Apr 2025Project Closed

Wink-Loving ISD Band Hall is a new construction project at 200 Rosey Dodd Avenue, Wink, in Winkler County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2025). The project has an estimated value of $3.2M across about 10,000 sq ft.

Estimated project value
$3.2M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
10,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$320/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2y 1mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 14, 2023748 days across supplied datesMay 1, 2025

4 timeline dates shown.

  1. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Source: TDLR filing

    View source record
  2. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    731 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    17 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Wink-Loving ISD Band Hall

The Band Hall at 200 Rosey Dodd Avenue in Wink is a new construction project completed for Wink-Loving Independent School District. The facility spans 10,000 sq ft and was built at an estimated cost of $3,200,000. The project is listed in TDLR records as the Wink-Loving ISD Band Hall, with a scope of work defined as a new band hall with no associated parking structures.

Project Status and Timeline

TDLR closed the project file in April 2025, which marks the end of the accessibility review process for this construction. The filing indicates a construction start date of April 2023 and a scheduled completion date of May 2025. The registered accessibility specialist for this project is Landy Perkins. The project involves public funds and public land, consistent with its ownership by a school district.

The design firm of record is Stiles, Wallace & Associates. This firm has registered six other projects in Texas, totaling $63,918,000, including work in Andrews, New Deal, and Lubbock. Wink-Loving Independent School District has six other TDLR-registered projects totaling $59,000,000, such as the New Ag Farm & Baseball / Softball Complex and the Wink Aquatic Center (Site A), all of which are closed.

Regional Context

Among 56 TDLR-registered new construction filings in Winkler County, the median estimated cost is $3,100,000. This project's cost is close to that county median. The median size for these projects is 10,592 sq ft, while this band hall is 10,000 sq ft. The median cost per square foot in the county is $359, whereas this project came in at $320 per sq ft. The scheduled build window for this project was 748 days, which is longer than the county median of 368 days.

The area profile for ZIP 79789, based on U.S. Census ACS 2023 five-year estimates, shows a population of about 1,380. The median household income is $127,898, and the median owner-occupied home value is $141,400. Housing in this area is predominantly owner-occupied, with 565 housing units recorded. Other nearby registered projects include the Wink-Loving ISD Football Pavilion and Storage and the Wink - Loving ISD Swine Barn.

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 79789 (Wink)

One email per change. Unsubscribe in one click. Privacy.

Wink-Loving ISD Band Hall is a New Construction project located at 200 Rosey Dodd Avenue in Wink, Texas. The project has an estimated value of $3.2M covering 10,000 sq ft. Wink-Loving Independent School District is the property owner and Stiles, Wallace & Associates is the design firm of record. The project was registered with TDLR on April 14, 2025.

Frequently Asked Questions

What is the address of the Band Hall in Wink?

The Band Hall is located at 200 Rosey Dodd Avenue in Wink, Texas, within Winkler County. This specific address identifies the new construction site for the school district facility.

Who is the owner of the Band Hall project?

The owner of record listed in the TDLR filing is Wink-Loving Independent School District. The project involves public funds and is situated on public land owned by the district.

What is the estimated cost of the Band Hall?

The estimated cost for the new construction is $3,200,000. This figure reflects the total budget for the 10,000 sq ft facility, which includes the band hall structure but excludes parking.

Is the Band Hall project complete?

TDLR closed the project file in April 2025. This action marks the end of the accessibility review process for the construction, confirming the project status in the official records.

Who designed the Band Hall?

The design firm of record is Stiles, Wallace & Associates. They are responsible for the architectural plans of this 10,000 sq ft facility, which was built at an estimated cost of $3,200,000.

What is Wink-Loving ISD Band Hall?

Wink-Loving ISD Band Hall is a new construction project at 200 Rosey Dodd Avenue in Wink, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New Band Hall, no parking

Is Wink-Loving ISD Band Hall open in Wink?

Construction on Wink-Loving ISD Band Hall is complete — TDLR records show the project passed its required accessibility inspection in Apr 2025. The building is finished and very likely open.

Where is Wink-Loving ISD Band Hall located?

Wink-Loving ISD Band Hall is located at 200 Rosey Dodd Avenue, Wink, TX, 79789, in Winkler County.

Who is the owner or developer of Wink-Loving ISD Band Hall?

Wink-Loving Independent School District is the property owner/developer of record for Wink-Loving ISD Band Hall, per its TDLR project registration.

Who is the architect or design firm for Wink-Loving ISD Band Hall?

Stiles, Wallace & Associates is the design firm of record for Wink-Loving ISD Band Hall, according to its TDLR filing.

How much does Wink-Loving ISD Band Hall cost and how big is it?

Wink-Loving ISD Band Hall has an estimated construction value of $3.2M and approximately 10,000 square feet (about $320/sqft), based on its TDLR filing.

Scope of Work

New Band Hall, no parking

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

200 Rosey Dodd Avenue, Wink, TX, 79789

Loading location map…
31.75239, -103.15172

Watch all construction in 79789 (Wink)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.