Funding type
This project is privately funded, on private land for private use.
Shannon MC West 6th in San Angelo, TX
120 E Harris Ave, San Angelo, TX, 76903
Shannon MC West 6th is a renovation/alteration project at 120 E Harris Ave, San Angelo, in Tom Green County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Aug 2025 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $5.0M across about 6,000 sq ft.
- Estimated project value
- $5.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 6,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $833/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 3 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
13 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
92 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Shannon MC West 6th
Shannon MC West 6th is a $5,000,000 renovation of the sixth floor at Shannon Medical Center in San Angelo. The project covers 6,000 square feet of interior space within the facility located at 120 E Harris Ave. The work is classified as a renovation or alteration, specifically targeting the spaces on the sixth floor of the existing structure.
O'Connell Robertson serves as the design firm of record for Shannon MC West 6th. The registered accessibility specialist is Susan D Gregonis. The filing indicates the project is privately funded on private land for private use. Shannon Medical Center is listed as the owner and developer of record. The estimated cost of $5,000,000 places the project above the median estimated cost for renovation and alteration filings in Tom Green County.
Construction Timeline and Status
TDLR completed the plan review process for Shannon MC West 6th in April 2025. Construction was scheduled to begin in May 2025, with a target completion date of August 2025. The scheduled build window of 92 days is close to the county median of 122 days for similar projects. The cost per square foot is estimated at $833, which is above the county median of $94 for this type of work.
The TDLR status for this registration is Review Complete. However, TDLR has not yet recorded a final inspection. This means the current state of the site is not confirmed in the public record. The absence of a final inspection record prevents verification of whether the renovation is fully finished or if any issues remain unresolved in the official file.
Shannon Medical Center has six other TDLR-registered projects in San Angelo, with a combined value of $12,564,000. These include closed projects at Shannon South Hospital and Hospice of San Angelo, as well as a review-complete project at Beauregard Clinic. The design firm O'Connell Robertson has worked on six other registered projects totaling $17,400,000, including work in Houston and San Antonio. This project is one of several recent filings in the San Angelo area, which also includes new construction and renovations for local businesses.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 76903 (San Angelo)
One email per change. Unsubscribe in one click. Privacy.
Shannon MC West 6th is a Renovation/Alteration project located at 120 E Harris Ave, San Angelo, TX 76903 in San Angelo, Texas. The project has an estimated value of $5.0M covering 6,000 sq ft. SHANNON MEDICAL CENTER is the property owner and O'CONNELL ROBERTSON is the design firm of record. The project was registered with TDLR on April 18, 2025.
Frequently Asked Questions
What is the scope of the Shannon MC West 6th project?
The scope involves the renovation of spaces on the sixth floor of Shannon Medical Center. The project covers 6,000 square feet of interior space within the facility.
Who is the design firm for this renovation?
O'Connell Robertson is the design firm of record for this project. Susan D Gregonis is the registered accessibility specialist.
Is the Shannon MC West 6th renovation finished?
TDLR has not yet recorded a final inspection. The scheduled completion date was August 2025, but the public record does not confirm the final state of the site.
How much does the Shannon MC West 6th project cost?
The estimated cost is $5,000,000. This amount is above the median estimated cost for renovation and alteration filings in Tom Green County.
Where is the Shannon MC West 6th project located?
The project is located at 120 E Harris Ave, San Angelo, TX 76903. It is part of the Shannon Medical Center facility.
What is Shannon MC West 6th?
Shannon MC West 6th is a renovation/alteration project at 120 E Harris Ave in San Angelo, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of spaces on the 6th floor of the facility.
Is Shannon MC West 6th open in San Angelo?
Shannon MC West 6th was scheduled to finish construction in Aug 2025 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Shannon MC West 6th located?
Shannon MC West 6th is located at 120 E Harris Ave, San Angelo, TX, 76903, in Tom Green County.
Who is the owner or developer of Shannon MC West 6th?
SHANNON MEDICAL CENTER is the property owner/developer of record for Shannon MC West 6th, per its TDLR project registration.
Who is the architect or design firm for Shannon MC West 6th?
O'CONNELL ROBERTSON is the design firm of record for Shannon MC West 6th, according to its TDLR filing.
How much does Shannon MC West 6th cost and how big is it?
Shannon MC West 6th has an estimated construction value of $5.0M and approximately 6,000 square feet (about $833/sqft), based on its TDLR filing.
Scope of Work
Renovation of spaces on the 6th floor of the facility.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
120 E Harris Ave, San Angelo, TX, 76903
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$62.5M totalWatch all construction in 76903 (San Angelo)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in San Angelo?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.