Project intelligenceTDLR TABS2025017226New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

IH 20 (CSJ: 0095-14-036) in Forney, TX

From: West of FM 741 To: Big Brushy Creek, Forney, TX, 75126

Opening ~Aug 2034Review Complete

IH 20 (CSJ: 0095-14-036) is a new construction project at From: West of FM 741 To: Big Brushy Creek, Forney, in Kaufman County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Aug 2034. The project has an estimated value of $243.9M across about 1,000 sq ft.

Estimated project value
$243.9M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$243.94K/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3y 1mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 22, 20253,388 days across supplied datesAug 1, 2034

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    2,292 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    1,096 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About IH 20 (CSJ: 0095-14-036)

TxDOT District: Dallas is developing a new frontage road system along Interstate 20 in Forney, Kaufman County. The project, registered under the identifier Csj: 0095-14-036, involves the construction of 0 to 4 lane continuous frontage roads. The work stretches from west of FM 741 to Big Brushy Creek. This is a new construction effort that utilizes public funds and public land.

The estimated cost for this infrastructure project is $243,943,049. The filing lists a square footage of 1,000 sq ft, resulting in a computed cost per square foot of $243,943. This figure places the project's cost above the county median for new construction filings in Kaufman County. The scheduled build window is 1,096 days, which is longer than the county median of 242 days.

Project Details and Design

Wsb, LLC serves as the design firm of record for this project. Frank Fonseca is the registered accessibility specialist associated with the filing. The project was registered with TDLR in April 2025, and plan review was completed in the same month. The TDLR status is Review Complete. Construction is scheduled to start in August 2031 and is scheduled to finish in August 2034.

Census estimates for the surrounding ZIP code 75126 indicate a population of about 77,116 and a median household income of $104,001. The area has 24,316 housing units, with a median owner-occupied home value of $337,200. Housing in this region is predominantly owner-occupied.

TxDOT District: Dallas has six other TDLR-registered projects totaling $60,982,724. These include projects in Addison, Dallas, McKinney, and Grand Prairie. Wsb, LLC has four other registered projects totaling $97,606,948, located in Sherman, Dallas, and Van Alstyne. Other new construction projects in the immediate area include a retail shell development, Kemp Junior High School, and Broadstreet Bank.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75126 (Forney)

One email per change. Unsubscribe in one click. Privacy.

IH 20 (CSJ: 0095-14-036) is a New Construction project located at From: West of FM 741 To: Big Brushy Creek in Forney, Texas. The project has an estimated value of $243.9M covering 1,000 sq ft. TxDOT District: Dallas is the property owner and WSB, LLC is the design firm of record. The project was registered with TDLR on April 22, 2025.

Frequently Asked Questions

When is construction scheduled to start and finish?

Construction is scheduled to start in August 2031 and is scheduled to finish in August 2034. The total build window is 1,096 days.

Who is the owner and design firm for this project?

TxDOT District: Dallas is the owner of record. Wsb, LLC is the design firm of record for the frontage road construction.

What is the estimated cost of the project?

The estimated cost is $243,943,049. This amount is above the county median for new construction filings in Kaufman County.

Is the project located in a flood zone?

It is designated as zone X on the National Flood Hazard Layer.

What is the scope of work for Csj: 0095-14-036?

The scope includes constructing 0 to 4 lane continuous frontage roads from west of FM 741 to Big Brushy Creek.

What is IH 20 (CSJ: 0095-14-036)?

IH 20 (CSJ: 0095-14-036) is a new construction project at From: West of FM 741 To: Big Brushy Creek in Forney, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construct 0 to 4 lane continuous frontage roads.

Is IH 20 (CSJ: 0095-14-036) open in Forney?

IH 20 (CSJ: 0095-14-036) is still under construction in Forney, TX, with an estimated completion of Aug 2034 according to its TDLR registration.

Where is IH 20 (CSJ: 0095-14-036) located?

IH 20 (CSJ: 0095-14-036) is located at From: West of FM 741 To: Big Brushy Creek, Forney, TX, 75126, in Kaufman County.

Who is the owner or developer of IH 20 (CSJ: 0095-14-036)?

TxDOT District: Dallas is the property owner/developer of record for IH 20 (CSJ: 0095-14-036), per its TDLR project registration.

Who is the architect or design firm for IH 20 (CSJ: 0095-14-036)?

WSB, LLC is the design firm of record for IH 20 (CSJ: 0095-14-036), according to its TDLR filing.

How much does IH 20 (CSJ: 0095-14-036) cost and how big is it?

IH 20 (CSJ: 0095-14-036) has an estimated construction value of $243.9M and approximately 1,000 square feet (about $243.94K/sqft), based on its TDLR filing.

Scope of Work

Construct 0 to 4 lane continuous frontage roads.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

From: West of FM 741 To: Big Brushy Creek, Forney, TX, 75126

Loading location map…
32.60164, -96.33751

Watch all construction in 75126 (Forney)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.