UCNT
UCNT is a renovation/alteration project at 10932 N. Riverside Dr. Suite 100, Fort Worth, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $250K across about 5,265 sq ft.
๐Project Metrics
TDLR #TABS2025017361Project Registered
Project has been registered with TDLR and is in pre-construction phase
UCNT is a Renovation/Alteration project located at 10932 N. Riverside Dr. Suite 100, Fort Worth, TX 76244 in Fort Worth, Texas. The project has an estimated value of $250K covering 5,265 sq ft. Urology Clinics Investment Alliance, LLC is the property owner and ANPH Architects is the design firm of record. The project was registered with TDLR on April 23, 2025.
โFrequently Asked Questions
What is UCNT?
UCNT is a renovation/alteration project at 10932 N. Riverside Dr. Suite 100 in Fort Worth, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Partial remodel of an existing out-patient medical clinic
Is UCNT open in Fort Worth?
UCNT is currently under construction in Fort Worth, TX. Its current TDLR status is "Project Registered".
Where is UCNT located?
UCNT is located at 10932 N. Riverside Dr. Suite 100, Fort Worth, TX, 76244, in Tarrant County.
Who is the owner or developer of UCNT?
Urology Clinics Investment Alliance, LLC is the property owner/developer of record for UCNT, per its TDLR project registration.
Who is the architect or design firm for UCNT?
ANPH Architects is the design firm of record for UCNT, according to its TDLR filing.
How much does UCNT cost and how big is it?
UCNT has an estimated construction value of $250K and approximately 5,265 square feet (about $47/sqft), based on its TDLR filing.
๐Scope of Work
Partial remodel of an existing out-patient medical clinic
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 23, 2025
Review Complete
Inspection Complete
Closed