Project intelligenceTDLR TABS2025017568Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Hays CISD | Johnson High School 2025 Additions and Renovations in Buda, TX

4260 Ranch to Market Road 967, Buda, TX, 78610

Construction complete · Nov 2026Inspection Complete

Hays CISD | Johnson High School 2025 Additions and Renovations is a renovation/alteration project at 4260 Ranch to Market Road 967, Buda, in Hays County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Nov 2026). The project has an estimated value of $27.6M across about 94,864 sq ft.

Estimated project value
$27.6M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
94,864 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$291/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 8mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 25, 2025735 days across supplied datesApr 30, 2027

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    135 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    424 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    176 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Hays CISD | Johnson High School 2025 Additions and Renovations

Hays CISD | Johnson High School 2025 Additions and Renovations is a completed accessibility project located at 4260 Ranch to Market Road 967 in Buda, Texas. The scope of work involved significant renovation and alteration to the educational facility, resulting in a total structure of 94,864 sq ft. The estimated cost for this work was $27,600,000, which calculates to $291 per sq ft. This project was registered with the Texas Department of Licensing and Regulation (TDLR) in April 2025, with plan review also completed in April 2025.

Project Timeline and Completion

Construction on the Johnson High School additions began in September 2025, as reported by Community Impact. The filing listed a completion date of April 2027, but the project advanced ahead of schedule. The building passed its final TDLR accessibility inspection in November 2026, so construction is complete. The TDLR status is recorded as Inspection Complete. This timeline indicates a build window that is longer than the median for similar projects in Hays County, which is 92 days.

Financial and Scope Context

The $27,600,000 estimated cost places this project well above the county median for renovation and alteration filings, which sits at $250,000. The size of 94,864 sq ft is also significantly larger than the median size of 3,268 sq ft for the same project type in the area. The cost per sq ft of $291 exceeds the county median of $95. The project involves public funds and public land, consistent with its status as a school district improvement.

Hays CISD is the owner and developer of record. Huckabee served as the design firm of record for the project. Ross A Thomas was the registered accessibility specialist responsible for the TABS compliance. This project is one of six TDLR-registered projects for Hays CISD, which also include new high school construction and other renovations in Buda and Kyle. The design firm Huckabee has also worked on other projects in the region, including Trinity High School in Euless and Jarvis ISD | Atlas Ranch Elementary School in Jarrell.

Other registered projects in the immediate Buda area include Txapa, Building 5, Building 2, Building 4, and the Barbershop Building. Local businesses near the Johnson High School site include Main St. Dental, Buda Bike Co., Color Me Happy Hair Studio and Headspa, Rise -N- Stop, Headway Health, and Live Oak Cardiology. The ZIP 78610 area has a population of about 46,685, with a median household income of $110,417 and 17,271 housing units according to U.S. Census ACS 2023 estimates.

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78610 (Buda)

One email per change. Unsubscribe in one click. Privacy.

Hays CISD | Johnson High School 2025 Additions and Renovations is a Renovation/Alteration project located at 4260 Ranch to Market Road 967, Buda, TX 78610 in Buda, Texas. The project has an estimated value of $27.6M covering 94,864 sq ft. Hays CISD is the property owner and Huckabee is the design firm of record. The project was registered with TDLR on April 25, 2025.

Frequently Asked Questions

What is the current status of the Johnson High School 2025 Additions and Renovations?

The project is complete. It passed its final TDLR accessibility inspection in November 2026, and the TDLR status is Inspection Complete.

Who is the registered accessibility specialist for this project?

Ross A Thomas is the registered accessibility specialist listed for the Hays CISD | Johnson High School 2025 Additions and Renovations.

What is the estimated cost per square foot for this renovation?

The estimated cost per square foot is $291, based on a total estimated cost of $27,600,000 for 94,864 sq ft.

When did construction start and finish?

Construction started in September 2025. The building passed its final TDLR accessibility inspection in November 2026, marking completion.

Is the Johnson High School facility open for students?

The TDLR record covers construction only and does not record whether the business has started serving customers. The inspection is complete.

What is Hays CISD | Johnson High School 2025 Additions and Renovations?

Hays CISD | Johnson High School 2025 Additions and Renovations is a renovation/alteration project at 4260 Ranch to Market Road 967 in Buda, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Hays CISD | Johnson High School 2025 Additions and Renovations

Is Hays CISD | Johnson High School 2025 Additions and Renovations open in Buda?

Construction on Hays CISD | Johnson High School 2025 Additions and Renovations is complete — TDLR records show the project passed its required accessibility inspection in Nov 2026. The building is finished and very likely open.

Where is Hays CISD | Johnson High School 2025 Additions and Renovations located?

Hays CISD | Johnson High School 2025 Additions and Renovations is located at 4260 Ranch to Market Road 967, Buda, TX, 78610, in Hays County.

Who is the owner or developer of Hays CISD | Johnson High School 2025 Additions and Renovations?

Hays CISD is the property owner/developer of record for Hays CISD | Johnson High School 2025 Additions and Renovations, per its TDLR project registration.

Who is the architect or design firm for Hays CISD | Johnson High School 2025 Additions and Renovations?

Huckabee is the design firm of record for Hays CISD | Johnson High School 2025 Additions and Renovations, according to its TDLR filing.

How much does Hays CISD | Johnson High School 2025 Additions and Renovations cost and how big is it?

Hays CISD | Johnson High School 2025 Additions and Renovations has an estimated construction value of $27.6M and approximately 94,864 square feet (about $291/sqft), based on its TDLR filing.

Scope of Work

Hays CISD | Johnson High School 2025 Additions and Renovations

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

4260 Ranch to Market Road 967, Buda, TX, 78610

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Related City Permits

Building permits found at or near this location

4260 BERKMAN DR

New 2-story single-family Row House. Covered breezeway to attached garage covered front porch. **SMART HOUSING 62.5% Waived**

FinalMechanical PermitNewMar 2009
View Details
2008-096930 MP
Christianson Plumbing & Air Co
4260 BERKMAN DR

New 2-story single-family Row House. Covered breezeway to attached garage covered front porch. **SMART HOUSING 62.5% Waived**

FinalPlumbing PermitNewFeb 2009
View Details
2008-096930 PP
Christianson Plumbing
4260 BERKMAN DR

New 2-story single-family Row House. Covered breezeway to attached garage covered front porch. **SMART HOUSING 62.5% Waived**

FinalElectrical PermitNewFeb 2009
View Details
2008-096930 EP
4260 BERKMAN DR

Construct new sidewalk and driveway approach.**nmt New 2-story single-family Row House. Covered breezeway to attached garage covered front porch. **SMART HOUSING 62.50% waived**

FinalDriveway / SidewalksNewDec 2008
View Details
2008-096930 DS
David Weekley Homes (MAIN)
4260 BERKMAN DR

New 2-story single-family Row House. Covered breezeway to attached garage covered front porch. **SMART HOUSING 62.5% Waived**

FinalBuilding PermitNewDec 2008
$143K
View Details
2008-096930 BP
David Weekley Homes (MAIN)

Watch all construction in 78610 (Buda)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.