Evelyn Tract Phase One
๐Project Metrics
TDLR #TABS2025018050Review Complete
Design review complete, construction may proceed
๐Scope of Work
Sidewalks along frontage of new street and sidewalk along existing Blue Good Road. 6,300SF of sidewalk and 24 sidewalk ramps
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐Related City Permits
Building permits found at or near this location
Tunnel under the foundation to repair broken PVC pipes; Two access holes at the back of the house and at the side of the house. At the master bathroom there was a broken pipe and near the side access hole there was a break in the main line.
Replacement of complete existing central heat and air system with or without duct work
Express- Remove and replace 9 windows like for like.
200amp OH service build
Replacement of an existing water heater 40gal gas tank located in an outside closet