Abilene Wylie ISD Band Hall Addition, Annex w/ Gym/Storm Shelter

4502 Antilley Rd., Abilene, TX, 79606

Opening ~Jul 2027Review Complete

Abilene Wylie ISD Band Hall Addition, Annex w/ Gym/Storm Shelter is a new construction project at 4502 Antilley Rd., Abilene, in Taylor County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jul 2027. The project has an estimated value of $60.0M across about 124,119 sq ft.

Estimated project value
$60.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
124,119 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$483/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2y 1mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

May 3, 2025819 days across supplied datesJul 31, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    67 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    752 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Abilene Wylie ISD Band Hall Addition, Annex w/ Gym/Storm Shelter

The Wylie ISD High School Annex is a new 124,119-square-foot construction project located at 4502 Antilley Rd. in Abilene, Texas. This substantial addition to the Wylie Independent School District campus is scheduled to finish in July 2027, with construction work beginning in July 2025. The project is registered with the Texas Department of Licensing and Regulation (TDLR) under the specific filing name Abilene Wylie ISD Band Hall Addition, Annex w/ Gym/Storm Shelter.

The scope of work defines a two-story classroom annex that includes a multi-purpose storm shelter which also functions as a gymnasium. The building design incorporates athletic locker rooms and a dedicated band hall addition. This facility represents a significant expansion of the district's physical infrastructure, adding over 124,000 square feet of new space in the Far Southside area of Taylor County. The project is funded through public funds, reflecting its status as a critical public infrastructure development.

Design and Financial Scale

CADCO Architects-Engineers, Inc. serves as the design firm of record for this development. The estimated cost for the project is $60,000,000, which calculates to $483 per square foot. This cost per square foot is above the Taylor County median of $175 for new construction filings. Similarly, the total estimated cost is in the top quarter of the 537 TDLR-registered new construction projects in the county, where the median estimated cost is $894,750.

The scheduled build window for this project is 752 days. This duration is longer than the county median of 245 days for similar new construction filings. The length of the construction period reflects the complexity of the two-story structure and the specialized facilities included in the scope, such as the storm shelter and athletic amenities. TDLR completed the plan review process in May 2025, clearing the path for the start of physical construction in the subsequent months.

Wylie Independent School District has four other TDLR-registered projects totaling $95,000,000 in the Abilene area. These include East Intermediate, South Elementary, Wylie High School, and Wylie East Intermediate School. CADCO Architects-Engineers, Inc. has six other registered projects totaling $101,350,000, indicating a significant portfolio of large-scale construction work in the region. The project is situated in a neighborhood with nearby businesses including Crown Of Thorns Barbershop LLC and Modern Lending-Tristan Loop.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 79606 (Abilene)

One email per change. Unsubscribe in one click. Privacy.

Abilene Wylie ISD Band Hall Addition, Annex w/ Gym/Storm Shelter is a New Construction project located at 4502 Antilley Rd., Abilene, TX 79606 in Abilene, Texas. The project has an estimated value of $60.0M covering 124,119 sq ft. Wylie Independent School District is the property owner and CADCO Architects-Engineers, Inc. is the design firm of record. The project was registered with TDLR on May 3, 2025.

Frequently Asked Questions

When will the Wylie ISD High School Annex be completed?

Construction is scheduled to finish in July 2027. Work started in July 2025 following the completion of the TDLR plan review in May 2025.

What is the total square footage of the new annex?

The project adds 124,119 square feet of new construction space. This includes a two-story classroom annex, gym, storm shelter, and band hall.

Who is the architect for the Abilene Wylie ISD Band Hall Addition?

CADCO Architects-Engineers, Inc. is the design firm of record for this project. They are responsible for the architectural and engineering plans for the annex.

Is the project open for public use?

The project is under construction. The TDLR record indicates the status is Review Complete, with construction ongoing and scheduled to finish in July 2027.

What is the estimated cost per square foot?

The estimated cost is $483 per square foot. This figure is derived from the total estimated project cost of $60,000,000 divided by the 124,119 square feet of new construction.

What is Abilene Wylie ISD Band Hall Addition, Annex w/ Gym/Storm Shelter?

Abilene Wylie ISD Band Hall Addition, Annex w/ Gym/Storm Shelter is a new construction project at 4502 Antilley Rd. in Abilene, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: A two story classroom Annex with a storm shelter that doubles as a gym, athletic locker rooms, band hall addition - 124,119sf

Is Abilene Wylie ISD Band Hall Addition, Annex w/ Gym/Storm Shelter open in Abilene?

Abilene Wylie ISD Band Hall Addition, Annex w/ Gym/Storm Shelter is still under construction in Abilene, TX, with an estimated completion of Jul 2027 according to its TDLR registration.

Where is Abilene Wylie ISD Band Hall Addition, Annex w/ Gym/Storm Shelter located?

Abilene Wylie ISD Band Hall Addition, Annex w/ Gym/Storm Shelter is located at 4502 Antilley Rd., Abilene, TX, 79606, in Taylor County.

Who is the owner or developer of Abilene Wylie ISD Band Hall Addition, Annex w/ Gym/Storm Shelter?

Wylie Independent School District is the property owner/developer of record for Abilene Wylie ISD Band Hall Addition, Annex w/ Gym/Storm Shelter, per its TDLR project registration.

Who is the architect or design firm for Abilene Wylie ISD Band Hall Addition, Annex w/ Gym/Storm Shelter?

CADCO Architects-Engineers, Inc. is the design firm of record for Abilene Wylie ISD Band Hall Addition, Annex w/ Gym/Storm Shelter, according to its TDLR filing.

How much does Abilene Wylie ISD Band Hall Addition, Annex w/ Gym/Storm Shelter cost and how big is it?

Abilene Wylie ISD Band Hall Addition, Annex w/ Gym/Storm Shelter has an estimated construction value of $60.0M and approximately 124,119 square feet (about $483/sqft), based on its TDLR filing.

Scope of Work

A two story classroom Annex with a storm shelter that doubles as a gym, athletic locker rooms, band hall addition - 124,119sf

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

4502 Antilley Rd., Abilene, TX, 79606

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 79606 (Abilene)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.