Abilene Wylie ISD Additions & Renos for East Intermediate
4709 Oldham Lane, Abilene, TX, 79602
Abilene Wylie ISD Additions & Renos for East Intermediate is a additions to existing building project at 4709 Oldham Lane, Abilene, in Taylor County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Mar 2027. The project has an estimated value of $18.0M across about 43,193 sq ft.
- Estimated project value
- $18.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 43,193 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $417/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 4mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
80 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
485 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Abilene Wylie ISD Additions & Renos for East Intermediate
Abilene Wylie ISD Additions & Renos for East Intermediate is a $18,000,000 construction project located at 4709 Oldham Lane in Abilene, Taylor County. The scope involves a 43,193-square-foot addition to the existing school building, specifically Phase 2, which includes new classrooms and a gym that also serves as a storm shelter. The project is registered with TDLR and is scheduled to finish in March 2027.
The owner of record is Wylie Independent School District, which has four other TDLR-registered projects in the area totaling $137,000,000. These include the Wylie ISD High School Annex, South Elementary, Wylie High School, and Wylie East Intermediate School. CADCO Architects-Engineers, Inc. is the design firm of record for this project. Landy Perkins is the registered accessibility specialist listed in the filing.
Project Scale and Cost
The estimated cost of $18,000,000 places this project above the median estimated cost for additions to existing buildings in Taylor County, which is $400,000. The size of 43,193 square feet is significantly larger than the county median of 4,500 square feet for similar work. The computed cost per square foot is $417, which is above the county median of $175. These figures are based on 129 TDLR-registered filings for this type of work in the county.
Construction is scheduled to begin in November 2025. TDLR completed the plan review in August 2025. The project involves public funds and public land. The scheduled build window is 485 days, which is longer than the county median of 214 days for comparable projects. The status of the TDLR registration is Review Complete.
Abilene Wylie ISD Additions & Renos for East Intermediate is part of a broader development effort by Wylie Independent School District in Abilene. The project is located in ZIP code 79602, which has a population of about 26,588 according to U.S. Census ACS 2023 five-year estimates. The median household income in this area is $84,845. Taylor County unemployment rate was 3.9 percent in July 2026, higher than a year earlier.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 79602 (Abilene)
One email per change. Unsubscribe in one click. Privacy.
Abilene Wylie ISD Additions & Renos for East Intermediate is a Additions to Existing Building project located at 4709 Oldham Lane, Abilene, TX 79602 in Abilene, Texas. The project has an estimated value of $18.0M covering 43,193 sq ft. Wylie Independent School District is the property owner and CADCO Architects-Engineers, Inc. is the design firm of record. The project was registered with TDLR on August 13, 2025.
Frequently Asked Questions
When is the East Intermediate addition expected to be finished?
The project is scheduled to finish in March 2027. Construction is set to start in November 2025, following the completion of TDLR plan review in August 2025.
Who is building the new classrooms and gym at East Intermediate?
Wylie Independent School District is the owner of record. CADCO Architects-Engineers, Inc. is the design firm. Landy Perkins is the registered accessibility specialist for the project.
How much does the East Intermediate addition cost?
The estimated cost is $18,000,000. This is above the median cost for similar additions in Taylor County, which is $400,000.
What is included in the Phase 2 addition?
Phase 2 includes a 43,193-square-foot addition with new classrooms and a gym that also functions as a storm shelter.
Is the school open for enrollment?
The TDLR record tracks construction status, not school operations. The project is scheduled to finish in March 2027, and construction starts in November 2025.
What is Abilene Wylie ISD Additions & Renos for East Intermediate?
Abilene Wylie ISD Additions & Renos for East Intermediate is a additions to existing building project at 4709 Oldham Lane in Abilene, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Phase 2: 43,193sf addition including new classrooms & gym/storm shelter
Is Abilene Wylie ISD Additions & Renos for East Intermediate open in Abilene?
Abilene Wylie ISD Additions & Renos for East Intermediate is still under construction in Abilene, TX, with an estimated completion of Mar 2027 according to its TDLR registration.
Where is Abilene Wylie ISD Additions & Renos for East Intermediate located?
Abilene Wylie ISD Additions & Renos for East Intermediate is located at 4709 Oldham Lane, Abilene, TX, 79602, in Taylor County.
Who is the owner or developer of Abilene Wylie ISD Additions & Renos for East Intermediate?
Wylie Independent School District is the property owner/developer of record for Abilene Wylie ISD Additions & Renos for East Intermediate, per its TDLR project registration.
Who is the architect or design firm for Abilene Wylie ISD Additions & Renos for East Intermediate?
CADCO Architects-Engineers, Inc. is the design firm of record for Abilene Wylie ISD Additions & Renos for East Intermediate, according to its TDLR filing.
How much does Abilene Wylie ISD Additions & Renos for East Intermediate cost and how big is it?
Abilene Wylie ISD Additions & Renos for East Intermediate has an estimated construction value of $18.0M and approximately 43,193 square feet (about $417/sqft), based on its TDLR filing.
Scope of Work
Phase 2: 43,193sf addition including new classrooms & gym/storm shelter
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
4709 Oldham Lane, Abilene, TX, 79602
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$483.3M totalWatch all construction in 79602 (Abilene)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Abilene?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.