AUS16 B1 is a renovation/alteration project at 11815 Alterra Pkwy, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2025). The project has an estimated value of $2.0M across about 1,530 sq ft.
๐Project Metrics
TDLR #TABS2025018146Project Closed
Project has been completed and closed
AUS16 B1 is a Renovation/Alteration project located at 11815 Alterra Pkwy, Austin, TX 78758 in Austin, Texas. The project has an estimated value of $2.0M covering 1,530 sq ft. TR DOMAIN 10 LLC is the property owner and Cushing Terrell is the design firm of record. The project was registered with TDLR on May 5, 2025.
โFrequently Asked Questions
What is AUS16 B1?
AUS16 B1 is a renovation/alteration project at 11815 Alterra Pkwy in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Reconfiguration of an existing server room into a new occupied work room.
Is AUS16 B1 open in Austin?
Construction on AUS16 B1 is complete โ TDLR records show the project passed its required accessibility inspection in May 2025. The building is finished and very likely open.
Where is AUS16 B1 located?
AUS16 B1 is located at 11815 Alterra Pkwy, Austin, TX, 78758, in Travis County.
Who is the owner or developer of AUS16 B1?
TR DOMAIN 10 LLC is the property owner/developer of record for AUS16 B1, per its TDLR project registration.
Who is the architect or design firm for AUS16 B1?
Cushing Terrell is the design firm of record for AUS16 B1, according to its TDLR filing.
How much does AUS16 B1 cost and how big is it?
AUS16 B1 has an estimated construction value of $2.0M and approximately 1,530 square feet (about $1.31K/sqft), based on its TDLR filing.
๐Scope of Work
Reconfiguration of an existing server room into a new occupied work room.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
May 5, 2025
Review Complete
Inspection Complete
Closed
May 5, 2025