Millsap Railroad Crossing (CSJ: 0717-01-025)
FM 113 From West Borden to Southwest Front St., Millsap, TX, 76066
Millsap Railroad Crossing (CSJ: 0717-01-025) is a new construction project at FM 113 From West Borden to Southwest Front St., Millsap, in Parker County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish May 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $60K across about 4,700 sq ft.
- Estimated project value
- $60K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 4,700 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $13/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 6 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
3 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
195 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
193 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Millsap Railroad Crossing (CSJ: 0717-01-025)
The Millsap Railroad Crossing project, filed under CSJ 0717-01-025, involves new construction on FM 113 in Millsap, Parker County. The scope covers grading, paving, drainage, and pavement marking improvements for the city of Millsap. It also includes the installation of a sidewalk, curb ramp, and crosswalk markings, totaling 4,700 sq ft of pedestrian improvements. The estimated cost for this work is $59,885.
TxDOT District: Fort Worth is the owner of record for this project, with Freese and Nichols, Inc. serving as the design firm. George A Patterson is the registered accessibility specialist associated with the filing. The project was registered with TDLR in May 2025, with a scheduled construction start in November 2025 and a target completion date of May 2026. The filing indicates that the project involves public funds and is a Federally funded roadway project.
The estimated cost of $59,885 is below the county median for similar new construction filings in Parker County, which stands at $800,000. The scheduled build window of 193 days is close to the county median of 212 days. The computed cost per square foot is $13, which is significantly below the county median of $133 per square foot for comparable projects.
Freese and Nichols, Inc. has six other TDLR-registered projects on record, totaling $39,188,190. These include work in Arlington, Hutto, Austin, and Corpus Christi. TxDOT District: Fort Worth also has six other registered projects in the Fort Worth area, with costs ranging from $76,800 to $517,000. Other registered projects in the Millsap area include Go West Supply, AutoZone #10882, and Texas Oncology.
The project was registered with TDLR in May 2025 with a target completion of May 2026; no plan review or inspection has been recorded since, so whether it proceeded is not confirmed in the public record. The current status is listed as Project Registered. Readers seeking specific details on construction progress should refer to the official TDLR records for the most accurate information.
Project Registered
Project has been registered with TDLR and is in pre-construction phase
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 76066 (Millsap)
One email per change. Unsubscribe in one click. Privacy.
Millsap Railroad Crossing (CSJ: 0717-01-025) is a New Construction project located at FM 113 From West Borden to Southwest Front St. in Millsap, Texas. The project has an estimated value of $60K covering 4,700 sq ft. TxDOT District: Fort Worth is the property owner and Freese and Nichols, Inc. is the design firm of record. The project was registered with TDLR on May 6, 2025.
Frequently Asked Questions
What is the total cost of the Millsap Railroad Crossing project?
The estimated cost for the new construction on FM 113 is $59,885. This figure is below the median cost for similar projects in Parker County.
Who is the design firm for this project?
Freese and Nichols, Inc. is the design firm of record for the Millsap Railroad Crossing project.
What is the current status of the construction?
The project is registered with TDLR. No plan review or inspection has been recorded since registration, so its current status is not confirmed in the public record.
How large is the pedestrian improvement area?
The project includes 4,700 sq ft of pedestrian improvements, including sidewalks, curb ramps, and crosswalk markings.
What is Millsap Railroad Crossing (CSJ: 0717-01-025)?
Millsap Railroad Crossing (CSJ: 0717-01-025) is a new construction project at FM 113 From West Borden to Southwest Front St. in Millsap, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Grading, paving, drainage, pavement marking and signage improvements for the city of Millsap. Installation of sidewalk, curb ramp, and crosswalk markings. 4,700 SF of pedestrian improvements.
Is Millsap Railroad Crossing (CSJ: 0717-01-025) open in Millsap?
Millsap Railroad Crossing (CSJ: 0717-01-025) was scheduled to finish construction in May 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Millsap Railroad Crossing (CSJ: 0717-01-025) located?
Millsap Railroad Crossing (CSJ: 0717-01-025) is located at FM 113 From West Borden to Southwest Front St., Millsap, TX, 76066, in Parker County.
Who is the owner or developer of Millsap Railroad Crossing (CSJ: 0717-01-025)?
TxDOT District: Fort Worth is the property owner/developer of record for Millsap Railroad Crossing (CSJ: 0717-01-025), per its TDLR project registration.
Who is the architect or design firm for Millsap Railroad Crossing (CSJ: 0717-01-025)?
Freese and Nichols, Inc. is the design firm of record for Millsap Railroad Crossing (CSJ: 0717-01-025), according to its TDLR filing.
How much does Millsap Railroad Crossing (CSJ: 0717-01-025) cost and how big is it?
Millsap Railroad Crossing (CSJ: 0717-01-025) has an estimated construction value of $60K and approximately 4,700 square feet (about $13/sqft), based on its TDLR filing.
Scope of Work
Grading, paving, drainage, pavement marking and signage improvements for the city of Millsap. Installation of sidewalk, curb ramp, and crosswalk markings. 4,700 SF of pedestrian improvements.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
FM 113 From West Borden to Southwest Front St., Millsap, TX, 76066
Related Projects
Same Owner
$37.03B totalWatch all construction in 76066 (Millsap)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Millsap?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.