St. David's Foundation - Level 5 Remodel is a renovation/alteration project at 1303 San Antonio St. Suite 500, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2026). The project has an estimated value of $700K across about 3,864 sq ft.
Final inspection completed, awaiting project closure
St. David's Foundation - Level 5 Remodel is a Renovation/Alteration project located at 1303 San Antonio St. Suite 500, Austin, TX 78701 in Austin, Texas. The project has an estimated value of $700K covering 3,864 sq ft. St. David's Community Health Foundation Initiatives is the property owner and Studio8 Architects is the design firm of record. The project was registered with TDLR on May 16, 2025.
St. David's Foundation - Level 5 Remodel is a renovation/alteration project at 1303 San Antonio St. Suite 500 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior remodel of existing office spce.
Construction on St. David's Foundation - Level 5 Remodel is complete โ TDLR records show the project passed its required accessibility inspection in Jun 2026. The building is finished and very likely open.
St. David's Foundation - Level 5 Remodel is located at 1303 San Antonio St. Suite 500, Austin, TX, 78701, in Travis County.
St. David's Community Health Foundation Initiatives is the property owner/developer of record for St. David's Foundation - Level 5 Remodel, per its TDLR project registration.
Studio8 Architects is the design firm of record for St. David's Foundation - Level 5 Remodel, according to its TDLR filing.
St. David's Foundation - Level 5 Remodel has an estimated construction value of $700K and approximately 3,864 square feet (about $181/sqft), based on its TDLR filing.
Interior remodel of existing office spce.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
May 16, 2025
Review Complete
May 16, 2025
Inspection Complete
Jun 20, 2026
Closed
400d
Construction phase
Building permits found at or near this location
septic tank cut over to tie into city tap
Replacement of complete existing central heat and air system with or without duct work
New carport structure
Install irrigation system
Replacement of an existing water heater Moving an existing tankless water heater from one location on wall to just 3ft away around on to another wall right around the corner from where its currently located.