Project intelligenceTDLR TABS2025019563Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Irving High School-Secure Vestibules at Various Campuses

900 N. O'Connor Rd, Irving, TX, 75061

Construction complete · Jun 2026Inspection Complete

Irving High School-Secure Vestibules at Various Campuses is a renovation/alteration project at 900 N. O'Connor Rd, Irving, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2026). The project has an estimated value of $836K across about 1,877 sq ft.

Estimated project value
$836K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1,877 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$445/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
11 days
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

May 22, 2025394 days across supplied datesJun 20, 2026

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    26 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    11 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    357 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Irving High School-Secure Vestibules at Various Campuses

Irving High School completed a $835,987 renovation at 900 N. O'Connor Rd in Irving, Texas. The project, filed with TDLR as "Irving High School-Secure Vestibules at Various Campuses," focused on adding a secure vestibule to the existing school entrance. The work included demolishing the old reception area to create a new lobby, reception, and conference room, spanning 1,877 square feet of altered space.

The building passed its final TDLR accessibility inspection in June 2026. Construction was scheduled to begin and complete in June 2025, resulting in a rapid 11-day build window. This timeline was significantly shorter than the 92-day median for similar renovation projects in Dallas County. The project utilized public funds and was registered with the Texas Department of Licensing and Regulation in May 2025.

Project Scope and Ownership

Irving Independent School District served as the owner of record for this renovation. The design firm of record was Orcutt | Winslow, while Bonita L Anderson acted as the registered accessibility specialist. The scope of work was strictly limited to the entrance security upgrade and lobby reconfiguration. The estimated cost of $835,987 places the project in the top quarter of renovation filings in Dallas County, where the median cost is $249,838. The project cost $445 per square foot, which is above the county median of $73 per square foot for similar work.

Irving Independent School District has six other TDLR-registered projects in Irving, including MacArthur High School and Nimitz High School, all with completed inspections. Orcutt | Winslow has also designed several other school renovations in the district. The project is located in ZIP code 75061, an area with a median household income of $61,260 according to U.S. Census estimates. The Dallas County unemployment rate was 3 percent in August 2026, lower than a year earlier.

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75061 (Irving)

One email per change. Unsubscribe in one click. Privacy.

Irving High School-Secure Vestibules at Various Campuses is a Renovation/Alteration project located at 900 N. O'Connor Rd, Irving, TX 75061 in Irving, Texas. The project has an estimated value of $836K covering 1,877 sq ft. Irving Independent School District is the property owner and Orcutt | Winslow is the design firm of record. The project was registered with TDLR on May 22, 2025.

Frequently Asked Questions

What work was done at Irving High School?

The renovation added a secure vestibule to the entrance. It involved demolishing the existing reception to create a new lobby, reception area, and conference room. The project covered 1,877 square feet of space.

Who designed the secure vestibule project?

Orcutt | Winslow was the design firm of record. Bonita L Anderson served as the registered accessibility specialist for the project filed with TDLR.

Is the construction finished?

Yes, the building passed its final TDLR accessibility inspection in June 2026. The construction status is marked as Inspection Complete by TDLR.

How much did the renovation cost?

The estimated cost for the secure vestibule and lobby renovation was $835,987. This amount is above the median cost for renovation projects in Dallas County.

What is Irving High School-Secure Vestibules at Various Campuses?

Irving High School-Secure Vestibules at Various Campuses is a renovation/alteration project at 900 N. O'Connor Rd in Irving, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Addition of secure vestibule into existing school entrance. Demolition of existing reception into a lobby, new reception and a conference room.

Is Irving High School-Secure Vestibules at Various Campuses open in Irving?

Construction on Irving High School-Secure Vestibules at Various Campuses is complete — TDLR records show the project passed its required accessibility inspection in Jun 2026. The building is finished and very likely open.

Where is Irving High School-Secure Vestibules at Various Campuses located?

Irving High School-Secure Vestibules at Various Campuses is located at 900 N. O'Connor Rd, Irving, TX, 75061, in Dallas County.

Who is the owner or developer of Irving High School-Secure Vestibules at Various Campuses?

Irving Independent School District is the property owner/developer of record for Irving High School-Secure Vestibules at Various Campuses, per its TDLR project registration.

Who is the architect or design firm for Irving High School-Secure Vestibules at Various Campuses?

Orcutt | Winslow is the design firm of record for Irving High School-Secure Vestibules at Various Campuses, according to its TDLR filing.

How much does Irving High School-Secure Vestibules at Various Campuses cost and how big is it?

Irving High School-Secure Vestibules at Various Campuses has an estimated construction value of $836K and approximately 1,877 square feet (about $445/sqft), based on its TDLR filing.

Scope of Work

Addition of secure vestibule into existing school entrance. Demolition of existing reception into a lobby, new reception and a conference room.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

900 N. O'Connor Rd, Irving, TX, 75061

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75061 (Irving)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.