Travis Middle School-Secure Vestibules at Various Campuses in Irving, TX
1600 Finley Road, Irving, TX, 75062
Travis Middle School-Secure Vestibules at Various Campuses is a renovation/alteration project at 1600 Finley Road, Irving, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2026). The project has an estimated value of $553K across about 680 sq ft.
- Estimated project value
- $553K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 680 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $813/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 11 days
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
5 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
26 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
11 days after the preceding date shown.
Source: TDLR filing
View source recordInspection complete · TDLR filing
The filing records completion of the accessibility inspection.
364 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Travis Middle School-Secure Vestibules at Various Campuses
Travis Middle School in Irving completed a renovation project involving the addition of secure vestibules and a new lobby area. The work, registered with TDLR in May 2025, passed its final TDLR accessibility inspection in June 2026, confirming that construction is complete. The project is located at 1600 Finley Road in the Arts District of Dallas County.
The scope of work included adding a secure vestibule into an existing school entrance and creating a lobby and reception area within the existing cafeteria. The total estimated cost for this renovation was $552,618. The project added 680 square feet of new space, resulting in a cost of $813 per square foot.
Irving Independent School District is the owner of record for this project. Orcutt | Winslow served as the design firm. Bonita L Anderson is the registered accessibility specialist associated with the filing. The project utilized public funds, consistent with its status as a school district facility.
Project Context and Comparison
Compared to other renovation and alteration filings in Dallas County, this project’s cost is above the county median of $249,838. The scheduled build window of 11 days is shorter than the county median of 92 days. The cost per square foot of $813 is above the county median of $73 per square foot.
Irving Independent School District has six other TDLR-registered projects totaling $5,114,370. These include MacArthur High School, Irving High School, Jack Singley Academy, Lamar Middle School, and Nimitz High School, all of which have completed their inspections. Orcutt | Winslow has designed several of these same projects, indicating a consistent partnership with the district for facility improvements.
Inspection Complete
Final inspection completed, awaiting project closure
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75062 (Irving)
One email per change. Unsubscribe in one click. Privacy.
Travis Middle School-Secure Vestibules at Various Campuses is a Renovation/Alteration project located at 1600 Finley Road, Irving, TX 75062 in Irving, Texas. The project has an estimated value of $553K covering 680 sq ft. Irving Independent School District is the property owner and Orcutt | Winslow is the design firm of record. The project was registered with TDLR on May 22, 2025.
Frequently Asked Questions
Is Travis Middle School renovation complete?
Yes, the project passed its final TDLR accessibility inspection in June 2026. The TDLR status is listed as Inspection Complete, confirming that the construction phase has ended.
What was the cost of the secure vestibule project?
The estimated cost for the renovation was $552,618. This figure covers the addition of the secure vestibule and the lobby and reception area in the cafeteria.
Who designed the Travis Middle School renovation?
Orcutt | Winslow is the design firm of record for this project. They are responsible for the architectural and design aspects of the secure vestibule and lobby additions.
How much space was added to the school?
The project added 680 square feet of new space. This includes the secure vestibule at the entrance and the new lobby and reception area within the cafeteria.
Is the business open?
The construction is complete, but the TDLR record only verifies the building's accessibility compliance. It does not confirm operational hours or business status.
What is Travis Middle School-Secure Vestibules at Various Campuses?
Travis Middle School-Secure Vestibules at Various Campuses is a renovation/alteration project at 1600 Finley Road in Irving, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Addition of secure vestibule into existing school entrance; and addition of a lobby and reception into existing cafeteria.
Is Travis Middle School-Secure Vestibules at Various Campuses open in Irving?
Construction on Travis Middle School-Secure Vestibules at Various Campuses is complete — TDLR records show the project passed its required accessibility inspection in Jun 2026. The building is finished and very likely open.
Where is Travis Middle School-Secure Vestibules at Various Campuses located?
Travis Middle School-Secure Vestibules at Various Campuses is located at 1600 Finley Road, Irving, TX, 75062, in Dallas County.
Who is the owner or developer of Travis Middle School-Secure Vestibules at Various Campuses?
Irving Independent School District is the property owner/developer of record for Travis Middle School-Secure Vestibules at Various Campuses, per its TDLR project registration.
Who is the architect or design firm for Travis Middle School-Secure Vestibules at Various Campuses?
Orcutt | Winslow is the design firm of record for Travis Middle School-Secure Vestibules at Various Campuses, according to its TDLR filing.
How much does Travis Middle School-Secure Vestibules at Various Campuses cost and how big is it?
Travis Middle School-Secure Vestibules at Various Campuses has an estimated construction value of $553K and approximately 680 square feet (about $813/sqft), based on its TDLR filing.
Scope of Work
Addition of secure vestibule into existing school entrance; and addition of a lobby and reception into existing cafeteria.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
1600 Finley Road, Irving, TX, 75062
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$480.9M totalWatch all construction in 75062 (Irving)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Irving?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.