Project intelligenceTDLR TABS2025019600New Construction
Funding type

This project is privately funded, on private land for private use.

Lidell Walker Subdivision - Phase 3 in Hutto, TX

815 CR 132, Hutto, TX, 78634

Construction complete · Aug 2026Inspection Complete

Lidell Walker Subdivision - Phase 3 is a new construction project at 815 CR 132, Hutto, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2026). The project has an estimated value of $140K across about 10,115 sq ft.

Estimated project value
$140K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
10,115 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$14/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
7 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

May 22, 2025461 days across supplied datesAug 26, 2026

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    13 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    196 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    252 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Lidell Walker Subdivision - Phase 3

Lidell Walker Subdivision - Phase 3 in Hutto, Texas, consists of approximately 2,023 linear feet of 5-foot concrete sidewalk with associated ramps. The project is a new construction effort located at 815 CR 132 in Williamson County. With a total estimated cost of $140,300 and a scope covering 10,115 square feet, the development focuses on pedestrian accessibility infrastructure for the subdivision.

The construction phase began in June 2025, following a plan review completed in May 2025. The filing indicated a scheduled completion date of December 2025. However, the project passed its final TDLR accessibility inspection in August 2026, confirming that construction is complete and the facility has met all required accessibility standards.

Project Details and Ownership

GRBK Edgewood LLC serves as the owner and developer of record for this privately funded project on private land. Gray Engineering, Inc. is the design firm of record, responsible for the project's engineering specifications. Richard Emerson is the registered accessibility specialist associated with the filing. The project was registered with TDLR in May 2025, establishing its compliance timeline within the state’s accessibility framework.

At $14 per square foot, this project’s cost is below the county median of $110 per square foot for similar new construction filings in Williamson County. The estimated total cost of $140,300 is also below the county median estimated cost of $850,862. The scheduled build window of 196 days was close to the county median of 245 days, reflecting a standard timeline for infrastructure projects of this nature.

Local Context and Nearby Projects

Gray Engineering, Inc. has two other TDLR-registered projects, including Lidell Walker Subdivision - Phase 2B in Hutto, which is also inspection complete. GRBK Edgewood LLC has six other registered projects totaling $1,359,376, spanning locations such as Pilot Point, Flower Mound, and Fort Worth. Nearby registered projects in the area include Villas at Cottonwood Trail and the Prairie Winds Amenity Center, indicating active development in the Hutto region.

The surrounding ZIP code 78634 has a population of about 43,466 residents, with a median household income of $111,227. Housing is predominantly owner-occupied, with a median home value of $334,200. This area profile suggests a stable residential market where accessibility infrastructure like this sidewalk network supports daily mobility for residents and visitors.

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78634 (Hutto)

One email per change. Unsubscribe in one click. Privacy.

Lidell Walker Subdivision - Phase 3 is a New Construction project located at 815 CR 132, Hutto, TX 78634 in Hutto, Texas. The project has an estimated value of $140K covering 10,115 sq ft. GRBK Edgewood LLC is the property owner and Gray Engineering, Inc. is the design firm of record. The project was registered with TDLR on May 22, 2025.

Frequently Asked Questions

Is Lidell Walker Subdivision - Phase 3 open?

The project passed its final TDLR accessibility inspection in August 2026, indicating construction is complete. The record does not specify if the subdivision is fully occupied or open to the public, only that the construction phase is finished.

Who built the sidewalks in Phase 3?

The design firm of record is Gray Engineering, Inc. The owner and developer is GRBK Edgewood LLC. The filing does not list a specific general contractor for the construction work.

How long did the construction take?

Construction started in June 2025 and the final inspection passed in August 2026. This represents a total timeline of approximately 14 months from start to final approval.

What is the cost per square foot?

The estimated cost is $140,300 for 10,115 square feet, resulting in a cost of $14 per square foot. This is below the Williamson County median of $110 per square foot.

Where is the project located?

The project is located at 815 CR 132, Hutto, TX 78634, in Williamson County. It is part of the Lidell Walker Subdivision development.

What is Lidell Walker Subdivision - Phase 3?

Lidell Walker Subdivision - Phase 3 is a new construction project at 815 CR 132 in Hutto, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Approx. 2,023 linear feet of 5' concrete sidewalk, with associated ramps.

Is Lidell Walker Subdivision - Phase 3 open in Hutto?

Construction on Lidell Walker Subdivision - Phase 3 is complete — TDLR records show the project passed its required accessibility inspection in Aug 2026. The building is finished and very likely open.

Where is Lidell Walker Subdivision - Phase 3 located?

Lidell Walker Subdivision - Phase 3 is located at 815 CR 132, Hutto, TX, 78634, in Williamson County.

Who is the owner or developer of Lidell Walker Subdivision - Phase 3?

GRBK Edgewood LLC is the property owner/developer of record for Lidell Walker Subdivision - Phase 3, per its TDLR project registration.

Who is the architect or design firm for Lidell Walker Subdivision - Phase 3?

Gray Engineering, Inc. is the design firm of record for Lidell Walker Subdivision - Phase 3, according to its TDLR filing.

How much does Lidell Walker Subdivision - Phase 3 cost and how big is it?

Lidell Walker Subdivision - Phase 3 has an estimated construction value of $140K and approximately 10,115 square feet (about $14/sqft), based on its TDLR filing.

Scope of Work

Approx. 2,023 linear feet of 5' concrete sidewalk, with associated ramps.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

815 CR 132, Hutto, TX, 78634

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Related City Permits

Building permits found at or near this location

815 SUSANA ALMANZA ST

*SMART Housing* *Green Building* New 3-story 3 bedroom 2.5 bathroom duplex condo residence with covered front porch and rear covered patio.

ActiveMechanical PermitNewOct 2026
View Details
2025-027010 MP
JCS HEATING AND COOLING
815 W 47TH ST UNIT 102A

CLAY DOUGH Front Building Sign

FinalElectrical PermitWallAug 2026
View Details
2026-098845 EP
815 SUSANA ALMANZA ST

*SMART Housing* *Green Building* New 3-story 3 bedroom 2.5 bathroom duplex condo residence with covered front porch and rear covered patio.

ActiveElectrical PermitNewAug 2026
View Details
2025-027010 EP
Martinez Electric
815 CHICON ST

Per Tx Gas we need to relocate the gas meter due to being to close to the tankless and crawl space vents. 10 clearance.

ActivePlumbing PermitRepairAug 2026
View Details
2026-097246 PP
AUSTIN FACILITY SERVICES
815 SUSANA ALMANZA ST

*SMART Housing* *Green Building* New 3-story 3 bedroom 2.5 bathroom duplex condo residence with covered front porch and rear covered patio.

ActivePlumbing PermitNewJul 2026
View Details
2025-027010 PP
Christianson Plumbing

Watch all construction in 78634 (Hutto)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.