Project intelligenceTDLR TABS2025019705Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

2022 BOND CTE WELDING LAB IMPROVEMENTS AT PASADENA HIGH SCHOOL

206 SHAVER ST., Pasadena, TX, 77506

Construction complete · Oct 2026Inspection Complete

2022 BOND CTE WELDING LAB IMPROVEMENTS AT PASADENA HIGH SCHOOL is a renovation/alteration project at 206 SHAVER ST., Pasadena, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2026). The project has an estimated value of $405K across about 2,500 sq ft.

Estimated project value
$405K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
2,500 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$162/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

May 23, 2025504 days across supplied datesOct 9, 2026

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    14 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    86 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    404 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About 2022 BOND CTE WELDING LAB IMPROVEMENTS AT PASADENA HIGH SCHOOL

Pasadena High School completed a $405,000 renovation of its welding shop at 206 Shaver St., Pasadena. The project, filed as the 2022 Bond CTE Welding LAB Improvements, focused on revising the existing space to accommodate additional equipment and increasing ventilation. The work covered 2,500 square feet of the school facility in Harris County.

The renovation was executed by the Pasadena Independent School District, the owner of record. LTY Engineers served as the design firm for the project. William T Winning was the registered accessibility specialist associated with the filing. The project involved public funds and public land, requiring compliance with state accessibility standards.

The construction timeline was scheduled to begin in June 2025 with a planned completion in August 2025. The actual build window was 86 days, a duration close to the county median of 92 days for similar renovation and alteration filings. The estimated cost placed the project above the Harris County median of $250,000 for this type of work.

Project Specifications and Costs

The total estimated cost of $405,000 resulted in a cost of $162 per square foot. This figure is above the Harris County median of $80 per square foot for renovation and alteration projects. The scope of work specifically targeted the welding shop, aiming to improve functionality for current and future equipment needs while enhancing air quality through increased ventilation.

The project passed its final TDLR accessibility inspection in October 2026. This inspection marked the completion of construction and confirmed that the renovated space met required accessibility standards. The TDLR record now shows the status as Inspection Complete, indicating that all necessary reviews and checks were successfully finished.

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77506 (Pasadena)

One email per change. Unsubscribe in one click. Privacy.

2022 BOND CTE WELDING LAB IMPROVEMENTS AT PASADENA HIGH SCHOOL is a Renovation/Alteration project located at 206 SHAVER ST., Pasadena, TX 77506 in Pasadena, Texas. The project has an estimated value of $405K covering 2,500 sq ft. Pasadena Independent School District is the property owner and LTY Engineers is the design firm of record. The project was registered with TDLR on May 23, 2025.

Frequently Asked Questions

What was the scope of the Pasadena High School welding shop renovation?

The renovation revised the existing welding shop to accommodate additional equipment and increased ventilation to the space.

Who owned and designed the Pasadena High School welding lab project?

The Pasadena Independent School District was the owner, and LTY Engineers was the design firm of record.

Is the Pasadena High School welding lab construction complete?

Yes, the project passed its final TDLR accessibility inspection in October 2026, and the TDLR status is Inspection Complete.

How much did the Pasadena High School welding shop renovation cost?

The estimated cost was $405,000, which is above the Harris County median for similar renovation projects.

Where is the Pasadena High School welding shop located?

The project is located at 206 Shaver St. in Pasadena, Texas, within Harris County.

What is 2022 BOND CTE WELDING LAB IMPROVEMENTS AT PASADENA HIGH SCHOOL?

2022 BOND CTE WELDING LAB IMPROVEMENTS AT PASADENA HIGH SCHOOL is a renovation/alteration project at 206 SHAVER ST. in Pasadena, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Revise the existing welding shop at Pasadena High School to accommodate existing and additional equipment and increase ventilation to the space.

Is 2022 BOND CTE WELDING LAB IMPROVEMENTS AT PASADENA HIGH SCHOOL open in Pasadena?

Construction on 2022 BOND CTE WELDING LAB IMPROVEMENTS AT PASADENA HIGH SCHOOL is complete — TDLR records show the project passed its required accessibility inspection in Oct 2026. The building is finished and very likely open.

Where is 2022 BOND CTE WELDING LAB IMPROVEMENTS AT PASADENA HIGH SCHOOL located?

2022 BOND CTE WELDING LAB IMPROVEMENTS AT PASADENA HIGH SCHOOL is located at 206 SHAVER ST., Pasadena, TX, 77506, in Harris County.

Who is the owner or developer of 2022 BOND CTE WELDING LAB IMPROVEMENTS AT PASADENA HIGH SCHOOL?

Pasadena Independent School District is the property owner/developer of record for 2022 BOND CTE WELDING LAB IMPROVEMENTS AT PASADENA HIGH SCHOOL, per its TDLR project registration.

Who is the architect or design firm for 2022 BOND CTE WELDING LAB IMPROVEMENTS AT PASADENA HIGH SCHOOL?

LTY Engineers is the design firm of record for 2022 BOND CTE WELDING LAB IMPROVEMENTS AT PASADENA HIGH SCHOOL, according to its TDLR filing.

How much does 2022 BOND CTE WELDING LAB IMPROVEMENTS AT PASADENA HIGH SCHOOL cost and how big is it?

2022 BOND CTE WELDING LAB IMPROVEMENTS AT PASADENA HIGH SCHOOL has an estimated construction value of $405K and approximately 2,500 square feet (about $162/sqft), based on its TDLR filing.

Scope of Work

Revise the existing welding shop at Pasadena High School to accommodate existing and additional equipment and increase ventilation to the space.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

206 SHAVER ST., Pasadena, TX, 77506

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 77506 (Pasadena)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Pasadena?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.