Project intelligenceTDLR TABS2025020005Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

Initial Subdivision & Common Corridor for Suites 803 & 804

500 N. IH69, Suite 620 500 N. IH69, Robstown, TX, 78380

Target date passed (Aug 2025)Review Complete

Initial Subdivision & Common Corridor for Suites 803 & 804 is a renovation/alteration project at 500 N. IH69, Suite 620 500 N. IH69, Robstown, in Nueces County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Aug 2025 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $50K across about 1,500 sq ft.

Estimated project value
$50K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1,500 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$33/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

May 29, 202578 days across supplied datesAug 15, 2025

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    18 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    60 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78380 (Robstown)

One email per change. Unsubscribe in one click. Privacy.

Initial Subdivision & Common Corridor for Suites 803 & 804 is a Renovation/Alteration project located at 500 N. IH69, Suite 620 500 N. IH69, Robstown, TX 78380 in Robstown, Texas. The project has an estimated value of $50K covering 1,500 sq ft. Stonewater Properties is the property owner and David E. Lewis, Architect is the design firm of record. The project was registered with TDLR on May 29, 2025.

Frequently Asked Questions

What is Initial Subdivision & Common Corridor for Suites 803 & 804?

Initial Subdivision & Common Corridor for Suites 803 & 804 is a renovation/alteration project at 500 N. IH69, Suite 620 500 N. IH69 in Robstown, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of Corridor subdividing Suite 803 & 804 and construction of Suite 804C

Is Initial Subdivision & Common Corridor for Suites 803 & 804 open in Robstown?

Initial Subdivision & Common Corridor for Suites 803 & 804 was scheduled to finish construction in Aug 2025 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Initial Subdivision & Common Corridor for Suites 803 & 804 located?

Initial Subdivision & Common Corridor for Suites 803 & 804 is located at 500 N. IH69, Suite 620 500 N. IH69, Robstown, TX, 78380, in Nueces County.

Who is the owner or developer of Initial Subdivision & Common Corridor for Suites 803 & 804?

Stonewater Properties is the property owner/developer of record for Initial Subdivision & Common Corridor for Suites 803 & 804, per its TDLR project registration.

Who is the architect or design firm for Initial Subdivision & Common Corridor for Suites 803 & 804?

David E. Lewis, Architect is the design firm of record for Initial Subdivision & Common Corridor for Suites 803 & 804, according to its TDLR filing.

How much does Initial Subdivision & Common Corridor for Suites 803 & 804 cost and how big is it?

Initial Subdivision & Common Corridor for Suites 803 & 804 has an estimated construction value of $50K and approximately 1,500 square feet (about $33/sqft), based on its TDLR filing.

Scope of Work

Construction of Corridor subdividing Suite 803 & 804 and construction of Suite 804C

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

500 N. IH69, Suite 620 500 N. IH69, Robstown, TX, 78380

Location by street address

Watch all construction in 78380 (Robstown)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Robstown?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.