EV CHARGER REPLACEMENT is a renovation/alteration project at 12907-A Fry Rd, Cypress, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2026). The project has an estimated value of $900K across about 5,000 sq ft.
Project has been completed and closed
EV CHARGER REPLACEMENT is a Renovation/Alteration project located at 12907-A Fry Rd, Cypress, TX 77433 in Cypress, Texas. The project has an estimated value of $900K covering 5,000 sq ft. Texas Petroleum Group is the property owner and Sevan Design, LLC is the design firm of record. The project was registered with TDLR on June 9, 2025.
EV CHARGER REPLACEMENT is a renovation/alteration project at 12907-A Fry Rd in Cypress, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: INTALLATION OF EV CHARGING STATIONS
Construction on EV CHARGER REPLACEMENT is complete โ TDLR records show the project passed its required accessibility inspection in May 2026. The building is finished and very likely open.
EV CHARGER REPLACEMENT is located at 12907-A Fry Rd, Cypress, TX, 77433, in Harris County.
Texas Petroleum Group is the property owner/developer of record for EV CHARGER REPLACEMENT, per its TDLR project registration.
Sevan Design, LLC is the design firm of record for EV CHARGER REPLACEMENT, according to its TDLR filing.
EV CHARGER REPLACEMENT has an estimated construction value of $900K and approximately 5,000 square feet (about $180/sqft), based on its TDLR filing.
INTALLATION OF EV CHARGING STATIONS
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Jun 9, 2025
Review Complete
Jun 9, 2025
Inspection Complete
Feb 6, 2026
Closed
May 21, 2026
242d
Construction phase