Quinlan Sidewalk Improvements (CSJ: 0901-22-130, etc.)

Various Locations, Quinlan, TX, 75474

Target date passed (Feb 2026)Review Complete

Quinlan Sidewalk Improvements (CSJ: 0901-22-130, etc.) is a new construction project at Various Locations, Quinlan, in Hunt County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Feb 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $524K across about 14,712 sq ft.

Estimated project value
$524K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
14,712 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$36/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
7 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jun 10, 2025255 days across supplied datesFeb 20, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    58 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    197 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Quinlan Sidewalk Improvements (CSJ: 0901-22-130, etc.)

CSJ: 0901-22-130, etc. is a new construction project for sidewalk improvements in Quinlan, Hunt County. The filing lists the project name as Quinlan Sidewalk Improvements (CSJ: 0901-22-130, etc.). TxDOT District: Paris is the owner of record, with Pape-Dawson Engineers, Inc. serving as the design firm. The scope includes constructing sidewalks, ADA curb ramps, curb repair, drainage structures, driveway reconstruction, signing, and pavement markings. The total estimated cost is $523,606 for 14,712 square feet of work.

The project was registered with TDLR in June 2025, and plan review was completed in the same month. Construction started in August 2025, with a scheduled completion date of February 2026. TDLR has not yet recorded a final inspection, so the current state of the site is not confirmed in the public record. Frank Fonseca is the registered accessibility specialist for this filing.

Cost and Scope Context

The estimated cost of $523,606 is below the Hunt County median of $850,000 for similar new construction filings. The cost per square foot is $36, which is below the county median of $170. The scheduled build window of 197 days is close to the county median of 225 days. Pape-Dawson Engineers, Inc. has six other TDLR-registered projects totaling $10,015,868. TxDOT District: Paris has six other projects totaling $78,306,098, including work in Rio Grande City, Roxton, Sherman, Paris, and Van Alstyne.

Quinlan is located in Hunt County, where the unemployment rate was 4.6 percent in August 2026, lower than a year earlier. The area profile for ZIP 75474 shows a population of about 16,813 and a median household income of $66,299. Nearby businesses include Ryan's Transmission, First Baptist Church Quinlan, and the Hunt County Tax Substation. Other registered projects in the area include renovations at Walmart 4215 and Quinlan Main St Shops.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75474 (Quinlan)

One email per change. Unsubscribe in one click. Privacy.

Quinlan Sidewalk Improvements (CSJ: 0901-22-130, etc.) is a New Construction project located at Various Locations in Quinlan, Texas. The project has an estimated value of $524K covering 14,712 sq ft. TxDOT District: Paris is the property owner and Pape-Dawson Engineers, Inc. is the design firm of record. The project was registered with TDLR on June 10, 2025.

Frequently Asked Questions

What is the status of the Quinlan sidewalk project?

TDLR has not yet recorded a final inspection. Construction was scheduled to finish in February 2026, but the current site state is unconfirmed in public records.

Who is building the sidewalks in Quinlan?

TxDOT District: Paris is the owner of record. Pape-Dawson Engineers, Inc. is the design firm, and Frank Fonseca is the registered accessibility specialist.

How much does the Quinlan sidewalk project cost?

The estimated cost is $523,606 for 14,712 square feet. This works out to $36 per square foot, which is below the Hunt County median.

Is the Quinlan sidewalk project open for use?

The record does not confirm if the project is open. TDLR has not yet recorded a final inspection, so the site's current status is unverified.

What is Quinlan Sidewalk Improvements (CSJ: 0901-22-130, etc.)?

Quinlan Sidewalk Improvements (CSJ: 0901-22-130, etc.) is a new construction project at Various Locations in Quinlan, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construct sidewalks, ADA curb ramps, curb repair, drainage structures, driveway reconstruction, signing and pavement markings.

Is Quinlan Sidewalk Improvements (CSJ: 0901-22-130, etc.) open in Quinlan?

Quinlan Sidewalk Improvements (CSJ: 0901-22-130, etc.) was scheduled to finish construction in Feb 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Quinlan Sidewalk Improvements (CSJ: 0901-22-130, etc.) located?

Quinlan Sidewalk Improvements (CSJ: 0901-22-130, etc.) is located at Various Locations, Quinlan, TX, 75474, in Hunt County.

Who is the owner or developer of Quinlan Sidewalk Improvements (CSJ: 0901-22-130, etc.)?

TxDOT District: Paris is the property owner/developer of record for Quinlan Sidewalk Improvements (CSJ: 0901-22-130, etc.), per its TDLR project registration.

Who is the architect or design firm for Quinlan Sidewalk Improvements (CSJ: 0901-22-130, etc.)?

Pape-Dawson Engineers, Inc. is the design firm of record for Quinlan Sidewalk Improvements (CSJ: 0901-22-130, etc.), according to its TDLR filing.

How much does Quinlan Sidewalk Improvements (CSJ: 0901-22-130, etc.) cost and how big is it?

Quinlan Sidewalk Improvements (CSJ: 0901-22-130, etc.) has an estimated construction value of $524K and approximately 14,712 square feet (about $36/sqft), based on its TDLR filing.

Scope of Work

Construct sidewalks, ADA curb ramps, curb repair, drainage structures, driveway reconstruction, signing and pavement markings.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Various Locations, Quinlan, TX, 75474

Loading location map…
32.91035, -96.13444

Watch all construction in 75474 (Quinlan)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.