Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
FM 756 (CSJ: 0492-04-034, etc.) in Tyler, TX
From: Jeff Davis Drive To: FM 346, Tyler, TX, 75703
FM 756 (CSJ: 0492-04-034, etc.) is a new construction project at From: Jeff Davis Drive To: FM 346, Tyler, in Smith County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2030. The project has an estimated value of $85.2M across about 187,764 sq ft.
- Estimated project value
- $85.2M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 187,764 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $454/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 4y 7mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
355 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
1,663 days after the preceding date shown.
Source: TDLR filing
View source record
📰About FM 756 (CSJ: 0492-04-034, etc.)
TxDOT District: Tyler is widening a section of FM 756 in Tyler to create a four-lane divided roadway with a flush median. The project, filed as CSJ: 0492-04-034, spans the stretch from Jeff Davis Drive to FM 346 in Smith County. This new construction effort includes dedicated bike lanes and a bi-directional sidewalk, transforming the corridor into a multi-modal transportation route.
The estimated cost for this infrastructure upgrade is $85,200,000. With a total area of 187,764 sq ft, the cost per square foot calculates to $454. This investment is funded through public funds and is classified as a Federally funded roadway project. The scale of the work reflects a major commitment to improving regional connectivity and safety in the Tyler area.
Project Timeline and Status
Construction is scheduled to begin in June 2026. TDLR completed plan review in June 2025, clearing the path for the upcoming build phase. The project is scheduled to finish in December 2030. This timeline indicates a multi-year construction window, allowing for phased implementation of the roadway improvements and associated infrastructure.
The design firm of record is HW Lochner, which is responsible for the technical planning of this expansion. Frank Fonseca is the registered accessibility specialist associated with the filing. TDLR status is Review Complete, confirming that all necessary regulatory checks have been satisfied prior to the start of physical construction.
Regional Context
This project is part of a broader portfolio managed by TxDOT District: Tyler, which has six other TDLR-registered projects totaling $7,769,273 in the region. These include various roadway and infrastructure improvements in Tyler and Gladewater. The $85,200,000 cost for this specific widening project is above the county median for new construction filings, placing it in the top quarter of estimated costs for Smith County projects of this type.
The median estimated cost for new construction in Smith County is $850,000, while the median size is 6,030 sq ft. This project’s size and cost significantly exceed those medians, reflecting its nature as a major highway improvement rather than a standard building project. The scheduled build window of 1,663 days is longer than the county median of 214 days, consistent with the complexity of civil engineering work involving lane expansions and utility adjustments.
The immediate area around the construction site includes local businesses such as BXC Roofing, Tennison Automotive, and Fernandez Auto Service LLC. These establishments serve the residential and commercial population in ZIP code 75703, where the median household income is estimated at $76,347. The project aims to enhance mobility for residents and commuters in this established community.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75703 (Tyler)
One email per change. Unsubscribe in one click. Privacy.
FM 756 (CSJ: 0492-04-034, etc.) is a New Construction project located at From: Jeff Davis Drive To: FM 346, Tyler, TX 75703 in Tyler, Texas. The project has an estimated value of $85.2M covering 187,764 sq ft. TxDOT District: Tyler is the property owner and HW Lochner is the design firm of record. The project was registered with TDLR on June 11, 2025.
Frequently Asked Questions
What is the scope of work for the FM 756 project?
The project involves widening the roadway to four lanes with a divided median. It also includes adding a flush median, dedicated bike lanes, and a bi-directional sidewalk to improve safety and accessibility for all users.
When will construction start and end?
Construction is scheduled to start in June 2026. The project is scheduled to finish in December 2030. This timeline allows for a multi-year construction period to complete the infrastructure upgrades.
Who is the owner and design firm for this project?
The owner of record is TxDOT District: Tyler. The design firm of record is HW Lochner. Frank Fonseca is the registered accessibility specialist associated with the TDLR filing for this project.
Is this project funded by public money?
Yes, the project involves public funds and is a Federally funded roadway project. This funding structure is typical for major infrastructure improvements managed by state transportation departments in Texas.
What is the estimated cost of the project?
The estimated cost is $85,200,000. This figure covers the widening of the roadway, median installation, and the addition of bike lanes and sidewalks across the designated section of FM 756.
What is FM 756 (CSJ: 0492-04-034, etc.)?
FM 756 (CSJ: 0492-04-034, etc.) is a new construction project at From: Jeff Davis Drive To: FM 346 in Tyler, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Widen to a 4-lane divided roadway with flush median, dedicated bike lane and bi-directional sidewalk.
Is FM 756 (CSJ: 0492-04-034, etc.) open in Tyler?
FM 756 (CSJ: 0492-04-034, etc.) is still under construction in Tyler, TX, with an estimated completion of Dec 2030 according to its TDLR registration.
Where is FM 756 (CSJ: 0492-04-034, etc.) located?
FM 756 (CSJ: 0492-04-034, etc.) is located at From: Jeff Davis Drive To: FM 346, Tyler, TX, 75703, in Smith County.
Who is the owner or developer of FM 756 (CSJ: 0492-04-034, etc.)?
TxDOT District: Tyler is the property owner/developer of record for FM 756 (CSJ: 0492-04-034, etc.), per its TDLR project registration.
Who is the architect or design firm for FM 756 (CSJ: 0492-04-034, etc.)?
HW Lochner is the design firm of record for FM 756 (CSJ: 0492-04-034, etc.), according to its TDLR filing.
How much does FM 756 (CSJ: 0492-04-034, etc.) cost and how big is it?
FM 756 (CSJ: 0492-04-034, etc.) has an estimated construction value of $85.2M and approximately 187,764 square feet (about $454/sqft), based on its TDLR filing.
Scope of Work
Widen to a 4-lane divided roadway with flush median, dedicated bike lane and bi-directional sidewalk.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
From: Jeff Davis Drive To: FM 346, Tyler, TX, 75703
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Watch all construction in 75703 (Tyler)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Tyler?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.