Project intelligenceTDLR TABS2025021182New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

McKinney FY 2023 Citywide Street Rehabilitation

Morris St, Erwin Ave, Oak St, Church St, Mckinney, TX, 75069

Opening ~Jan 2027Review Complete

McKinney FY 2023 Citywide Street Rehabilitation is a new construction project at Morris St, Erwin Ave, Oak St, Church St, Mckinney, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jan 2027. The project has an estimated value of $50.0M across about 7,500 sq ft.

Estimated project value
$50.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
7,500 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$6.67K/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 3mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jun 12, 2025583 days across supplied datesJan 16, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    126 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    457 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75069 (Mckinney)

One email per change. Unsubscribe in one click. Privacy.

McKinney FY 2023 Citywide Street Rehabilitation is a New Construction project located at Morris St, Erwin Ave, Oak St, Church St, Mckinney, TX 75069 in Mckinney, Texas. The project has an estimated value of $50.0M covering 7,500 sq ft. City of McKinney is the property owner and Lockwood, Andrews & Newnam, Inc. is the design firm of record. The project was registered with TDLR on June 12, 2025.

Frequently Asked Questions

What is McKinney FY 2023 Citywide Street Rehabilitation?

McKinney FY 2023 Citywide Street Rehabilitation is a new construction project at Morris St, Erwin Ave, Oak St, Church St in Mckinney, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Replace five street segments in residential McKinney, TX (~7,500 LF total) and installing / replacing sidewalks throughout.

Is McKinney FY 2023 Citywide Street Rehabilitation open in Mckinney?

McKinney FY 2023 Citywide Street Rehabilitation is still under construction in Mckinney, TX, with an estimated completion of Jan 2027 according to its TDLR registration.

Where is McKinney FY 2023 Citywide Street Rehabilitation located?

McKinney FY 2023 Citywide Street Rehabilitation is located at Morris St, Erwin Ave, Oak St, Church St, Mckinney, TX, 75069, in Collin County.

Who is the owner or developer of McKinney FY 2023 Citywide Street Rehabilitation?

City of McKinney is the property owner/developer of record for McKinney FY 2023 Citywide Street Rehabilitation, per its TDLR project registration.

Who is the architect or design firm for McKinney FY 2023 Citywide Street Rehabilitation?

Lockwood, Andrews & Newnam, Inc. is the design firm of record for McKinney FY 2023 Citywide Street Rehabilitation, according to its TDLR filing.

How much does McKinney FY 2023 Citywide Street Rehabilitation cost and how big is it?

McKinney FY 2023 Citywide Street Rehabilitation has an estimated construction value of $50.0M and approximately 7,500 square feet (about $6.67K/sqft), based on its TDLR filing.

Scope of Work

Replace five street segments in residential McKinney, TX (~7,500 LF total) and installing / replacing sidewalks throughout.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Morris St, Erwin Ave, Oak St, Church St, Mckinney, TX, 75069

Location by street address

Watch all construction in 75069 (Mckinney)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Mckinney?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.