Project intelligenceTDLR TABS2025021132New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

White Avenue Sidewalk and Accessibility Improvements in Mckinney, TX

White Avenue (from Redbud Blvd to Tennesee St), Mckinney, TX, 75069

Target date passed (Apr 2026)Review Complete

White Avenue Sidewalk and Accessibility Improvements is a new construction project at White Avenue (from Redbud Blvd to Tennesee St), Mckinney, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Apr 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $1.3M across about 6,000 sq ft.

Estimated project value
$1.3M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
6,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$210/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
6 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jun 12, 2025295 days across supplied datesApr 3, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    126 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    169 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About White Avenue Sidewalk and Accessibility Improvements

The White Avenue Sidewalk and Accessibility Improvements project involves the new construction of a 6,000-square-foot sidewalk corridor along the north side of White Avenue in McKinney. The work spans from Redbud Boulevard to Tennessee Street in the 75069 area. The estimated cost for this infrastructure upgrade is $1,258,790. This figure places the project above the median estimated cost of $800,000 for similar new construction filings in Collin County. The per-square-foot cost of $210 is also above the county median of $120 per square foot.

Project Scope and Design

Lockwood, Andrews & Newnam, Inc. serves as the design firm of record for this work. The scope involves installing a 6-foot sidewalk and ramps along the north curb line. The design narrows the street by approximately 3 feet to accommodate the new pedestrian infrastructure. Marcela Abadi Rhoads is the registered accessibility specialist associated with the filing. The project utilizes public funds and involves public land, classifying it as a Federally funded roadway project under Texas regulations.

TDLR completed the plan review for the White Avenue Sidewalk and Accessibility Improvements in June 2025. Construction was scheduled to begin in October 2025 with a planned completion date of April 2026. However, the Texas Department of Licensing and Regulation has not yet recorded a final inspection. Consequently, the current physical state of the site is not confirmed in the public record. The scheduled build window of 169 days is close to the county median of 212 days for projects of this type.

Context and Location

This project is one of several registered with the City of McKinney. Other filings by the same owner include the McKinney Commercial Terminal and the McKinney Municipal Complex. The design firm has also worked on larger projects, including the McKinney Citywide initiative and facilities in Fort Worth and Houston. The project sits within ZIP code 75069, an area with a population of about 39,332 according to U.S. Census estimates. The median household income in this area is $82,804, and the median owner-occupied home value is $413,700.

The Collin County unemployment rate was 4.4 percent in August 2026, which is lower than a year earlier. This economic context surrounds the construction activity in the region. The specific focus of this filing remains the physical installation of the sidewalk and ramps on White Avenue. No other operational details or business openings are indicated in the TDLR registration data.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75069 (Mckinney)

One email per change. Unsubscribe in one click. Privacy.

White Avenue Sidewalk and Accessibility Improvements is a New Construction project located at White Avenue (from Redbud Blvd to Tennesee St), Mckinney, TX 75069 in Mckinney, Texas. The project has an estimated value of $1.3M covering 6,000 sq ft. City of McKinney is the property owner and Lockwood, Andrews & Newnam, Inc. is the design firm of record. The project was registered with TDLR on June 12, 2025.

Frequently Asked Questions

Is the White Avenue sidewalk project finished?

The TDLR record shows the project has not yet recorded a final inspection. While the scheduled completion date was April 2026, the public record does not confirm the site is finished or operational.

What is the estimated cost of the work?

The estimated cost for the White Avenue sidewalk and accessibility improvements is $1,258,790. This amount is above the median cost for new construction projects in Collin County.

Who is the design firm for this project?

Lockwood, Andrews & Newnam, Inc. is the design firm of record. Marcela Abadi Rhoads is the registered accessibility specialist listed in the TDLR filing for this specific project.

How much sidewalk is being installed?

The project involves installing a 6-foot sidewalk along a 6,000-foot corridor. The total square footage of the new construction is listed as 6,000 sq ft.

Is this a public or private project?

This is a public project. The owner of record is the City of McKinney, and the filing indicates it involves public funds and public land.

What is White Avenue Sidewalk and Accessibility Improvements?

White Avenue Sidewalk and Accessibility Improvements is a new construction project at White Avenue (from Redbud Blvd to Tennesee St) in Mckinney, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Installing 6' sidewalk and ramps along north side of White Avenue(6,000 ft corridor, narrowing street ~3' off the north curb line.

Is White Avenue Sidewalk and Accessibility Improvements open in Mckinney?

White Avenue Sidewalk and Accessibility Improvements was scheduled to finish construction in Apr 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is White Avenue Sidewalk and Accessibility Improvements located?

White Avenue Sidewalk and Accessibility Improvements is located at White Avenue (from Redbud Blvd to Tennesee St), Mckinney, TX, 75069, in Collin County.

Who is the owner or developer of White Avenue Sidewalk and Accessibility Improvements?

City of McKinney is the property owner/developer of record for White Avenue Sidewalk and Accessibility Improvements, per its TDLR project registration.

Who is the architect or design firm for White Avenue Sidewalk and Accessibility Improvements?

Lockwood, Andrews & Newnam, Inc. is the design firm of record for White Avenue Sidewalk and Accessibility Improvements, according to its TDLR filing.

How much does White Avenue Sidewalk and Accessibility Improvements cost and how big is it?

White Avenue Sidewalk and Accessibility Improvements has an estimated construction value of $1.3M and approximately 6,000 square feet (about $210/sqft), based on its TDLR filing.

Scope of Work

Installing 6' sidewalk and ramps along north side of White Avenue(6,000 ft corridor, narrowing street ~3' off the north curb line.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

White Avenue (from Redbud Blvd to Tennesee St), Mckinney, TX, 75069

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75069 (Mckinney)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Mckinney?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.