Project intelligenceTDLR TABS2027003140New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Intersection Capacity Improvements (FY 23) - CIP ST2303 in Mckinney, TX

3 Intersections, Mckinney, TX, 75072

Opening ~Dec 2027Project Registered

Intersection Capacity Improvements (FY 23) - CIP ST2303 is a new construction project at 3 Intersections, Mckinney, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2027. The project has an estimated value of $300K across about 12,500 sq ft.

Estimated project value
$300K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
12,500 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$24/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 3mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

Explore the linked construction record and source history

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Sep 1, 2026456 days across supplied datesDec 1, 2027

3 timeline dates shown.

  1. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Source: TDLR filing

    View source record
  2. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    37 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    419 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Intersection Capacity Improvements (FY 23) - CIP ST2303

The City of McKinney is undertaking a new construction project to install sidewalks, trails, and pedestrian infrastructure at three intersections in the city. The scope covers approximately 12,500 square feet of new surface area, including specific provisions for pedestrian ramps and pavement markings. This work is part of the Intersection Capacity Improvements program for Fiscal Year 23, designated as CIP ST2303.

The project is located at an address described as '3 Intersections' in McKinney, Texas, within Collin County. The estimated cost for this public works project is $300,000, which calculates to a rate of $24 per square foot. This figure is below the median estimated cost of $800,000 for similar new construction filings in Collin County.

CobbFendley is the design firm of record for the project. Marcela Abadi Rhoads serves as the registered accessibility specialist. The City of McKinney has six other TDLR-registered projects with a combined value of $4,905,000, indicating a consistent pattern of public infrastructure investment in the area. The funding for this specific project involves public funds, public land, or is a Federally funded roadway project.

The project was registered with TDLR in October 2026. Plan review is pending, and the scheduled construction start date is September 2026. The filing indicates a scheduled build window of 456 days, which is longer than the county median of 212 days for similar projects. The completion date on the filing is targeted for December 2027.

The surrounding area, ZIP code 75072, has a population of about 55,997 according to U.S. Census ACS 2023 five-year estimates. The median household income in this area is $155,294, and the median owner-occupied home value is $472,700. Housing in this ZIP code is predominantly owner-occupied. The Collin County unemployment rate was 4.4 percent in August 2026, lower than a year earlier.

This project represents a focused effort to improve pedestrian accessibility and capacity at key intersection points in McKinney. The inclusion of trails and sidewalks suggests an emphasis on non-motorized transportation options. The registration status confirms that the project is in the planning and review phase, with construction expected to begin in the latter half of 2026.

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75072 (Mckinney)

One email per change. Unsubscribe in one click. Privacy.

Intersection Capacity Improvements (FY 23) - CIP ST2303 is a New Construction project located at 3 Intersections, Mckinney, TX 75072 in Mckinney, Texas. The project has an estimated value of $300K covering 12,500 sq ft. City of McKinney is the property owner and CobbFendley is the design firm of record. The project was registered with TDLR on October 8, 2026.

Frequently Asked Questions

What is the scope of work for this project?

The scope includes sidewalks and trails totaling approximately 12,500 square feet, along with pedestrian ramps and pavement markings at three intersections in McKinney.

Who is the design firm for this project?

CobbFendley is the design firm of record for the Intersection Capacity Improvements project in McKinney.

What is the estimated cost of the project?

The estimated cost is $300,000, which is below the median cost for new construction projects in Collin County.

When is the project targeted for completion?

The project is targeted for December 2027, with a scheduled construction start date of September 2026.

Is the project currently open to the public?

No, the project is in the registration and plan review phase. Construction is scheduled to start in September 2026.

What is Intersection Capacity Improvements (FY 23) - CIP ST2303?

Intersection Capacity Improvements (FY 23) - CIP ST2303 is a new construction project at 3 Intersections in Mckinney, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Sidewalks and trails (~12,500 SF), pedestrian ramps, and pavement markings

Is Intersection Capacity Improvements (FY 23) - CIP ST2303 open in Mckinney?

Intersection Capacity Improvements (FY 23) - CIP ST2303 is still under construction in Mckinney, TX, with an estimated completion of Dec 2027 according to its TDLR registration.

Where is Intersection Capacity Improvements (FY 23) - CIP ST2303 located?

Intersection Capacity Improvements (FY 23) - CIP ST2303 is located at 3 Intersections, Mckinney, TX, 75072, in Collin County.

Who is the owner or developer of Intersection Capacity Improvements (FY 23) - CIP ST2303?

City of McKinney is the property owner/developer of record for Intersection Capacity Improvements (FY 23) - CIP ST2303, per its TDLR project registration.

Who is the architect or design firm for Intersection Capacity Improvements (FY 23) - CIP ST2303?

CobbFendley is the design firm of record for Intersection Capacity Improvements (FY 23) - CIP ST2303, according to its TDLR filing.

How much does Intersection Capacity Improvements (FY 23) - CIP ST2303 cost and how big is it?

Intersection Capacity Improvements (FY 23) - CIP ST2303 has an estimated construction value of $300K and approximately 12,500 square feet (about $24/sqft), based on its TDLR filing.

Scope of Work

Sidewalks and trails (~12,500 SF), pedestrian ramps, and pavement markings

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

3 Intersections, Mckinney, TX, 75072

33.18949, -96.73434

Watch all construction in 75072 (Mckinney)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Mckinney?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.