Project intelligenceTDLR TABS2027002603Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

District 7 Neighborhood: Pedestrian Mobility & Street Improvements - W Mulberry Ave in San Antonio, TX

W Mulberry Ave (Kapmann Blvd to E Elmendorf St), San Antonio, TX, 78201

Opening ~Mar 2027Project Registered

District 7 Neighborhood: Pedestrian Mobility & Street Improvements - W Mulberry Ave is a renovation/alteration project at W Mulberry Ave (Kapmann Blvd to E Elmendorf St), San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Mar 2027. The project has an estimated value of $638K across about 49,446 sq ft.

Estimated project value
$638K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
49,446 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$13/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
5 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Oct 2, 2026180 days across supplied datesMar 31, 2027

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    31 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    149 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About District 7 Neighborhood: Pedestrian Mobility & Street Improvements - W Mulberry Ave

District 7 Neighborhood: Pedestrian Mobility & Street Improvements - W Mulberry Ave involves the renovation of a segment of W Mulberry Ave, stretching from Kapmann Blvd to E Elmendorf St in San Antonio. The project scope includes the construction of approximately 49,446 sq ft of new sidewalk, driveways, curb ramps, and other pedestrian-related facilities. The total estimated cost for this work is $637,898.

CobbFendley serves as the design firm of record for this initiative. Sarah W Vasquez is the registered accessibility specialist associated with the filing. The project was registered with TDLR in October 2026, and construction is scheduled to begin in November 2026. Completion is targeted for March 2027. The TDLR status is listed as Project Registered, with plan review pending.

Project Scale and Cost Context

In Bexar County, the median estimated cost for renovation or alteration filings is $250,000. This project’s cost of $637,898 places it above the county median for its type, falling within the top quarter of comparable filings. The median size for such projects in the county is 4,108 sq ft, whereas this project covers 49,446 sq ft, significantly larger than the median. The calculated cost per square foot is $13, which is below the county median of $85 per square foot. The scheduled build window is 149 days, longer than the county median of 103 days.

The site is located in San Antonio, TX 78201, within Bexar County. The U.S. Census Bureau’s 2023 five-year estimates for ZIP code 78201 indicate a population of about 43,426 residents and a median household income of $46,129. There are approximately 18,661 housing units in the area, with an even mix of owner- and renter-occupied homes. The median owner-occupied home value is estimated at $187,400.

The City of San Antonio is the owner of record for this project. The city has six other TDLR-registered projects totaling $4,167,870, including work on Clearview Dr. and Pearsall Park. CobbFendley, the design firm, has six other registered projects totaling $17,724,527, spanning locations such as Deer Park and Houston. This specific project involves public funds and public land, classifying it as a Federally funded roadway project. The Bexar County unemployment rate was 4.7 percent in July 2026, which is higher than the rate recorded a year earlier.

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78201 (San Antonio)

One email per change. Unsubscribe in one click. Privacy.

District 7 Neighborhood: Pedestrian Mobility & Street Improvements - W Mulberry Ave is a Renovation/Alteration project located at W Mulberry Ave (Kapmann Blvd to E Elmendorf St), San Antonio, TX 78201 in San Antonio, Texas. The project has an estimated value of $638K covering 49,446 sq ft. City of San Antonio is the property owner and CobbFendley is the design firm of record. The project was registered with TDLR on October 2, 2026.

Frequently Asked Questions

When is the W Mulberry Ave project expected to be finished?

Construction is targeted for March 2027. The project was registered in October 2026, with a scheduled start in November 2026 and plan review pending.

Who is designing the pedestrian improvements on W Mulberry Ave?

CobbFendley is the design firm of record. Sarah W Vasquez is the registered accessibility specialist listed in the TDLR filing for this renovation.

What is the total cost of the W Mulberry Ave renovation?

The estimated cost for the project is $637,898. This covers approximately 49,446 sq ft of sidewalk, driveways, curb ramps, and other pedestrian facilities.

Who owns the land for this street improvement project?

The City of San Antonio is the owner/developer of record. The project involves public funds and public land, and it is classified as a Federally funded roadway project.

What is District 7 Neighborhood: Pedestrian Mobility & Street Improvements - W Mulberry Ave?

District 7 Neighborhood: Pedestrian Mobility & Street Improvements - W Mulberry Ave is a renovation/alteration project at W Mulberry Ave (Kapmann Blvd to E Elmendorf St) in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of approximately 49,446sf of sidewalk, driveways, curb ramps, and other pedestrian related facilities.

Is District 7 Neighborhood: Pedestrian Mobility & Street Improvements - W Mulberry Ave open in San Antonio?

District 7 Neighborhood: Pedestrian Mobility & Street Improvements - W Mulberry Ave is still under construction in San Antonio, TX, with an estimated completion of Mar 2027 according to its TDLR registration.

Where is District 7 Neighborhood: Pedestrian Mobility & Street Improvements - W Mulberry Ave located?

District 7 Neighborhood: Pedestrian Mobility & Street Improvements - W Mulberry Ave is located at W Mulberry Ave (Kapmann Blvd to E Elmendorf St), San Antonio, TX, 78201, in Bexar County.

Who is the owner or developer of District 7 Neighborhood: Pedestrian Mobility & Street Improvements - W Mulberry Ave?

City of San Antonio is the property owner/developer of record for District 7 Neighborhood: Pedestrian Mobility & Street Improvements - W Mulberry Ave, per its TDLR project registration.

Who is the architect or design firm for District 7 Neighborhood: Pedestrian Mobility & Street Improvements - W Mulberry Ave?

CobbFendley is the design firm of record for District 7 Neighborhood: Pedestrian Mobility & Street Improvements - W Mulberry Ave, according to its TDLR filing.

How much does District 7 Neighborhood: Pedestrian Mobility & Street Improvements - W Mulberry Ave cost and how big is it?

District 7 Neighborhood: Pedestrian Mobility & Street Improvements - W Mulberry Ave has an estimated construction value of $638K and approximately 49,446 square feet (about $13/sqft), based on its TDLR filing.

Scope of Work

Construction of approximately 49,446sf of sidewalk, driveways, curb ramps, and other pedestrian related facilities.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

W Mulberry Ave (Kapmann Blvd to E Elmendorf St), San Antonio, TX, 78201

29.45008, -98.52663

Watch all construction in 78201 (San Antonio)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in San Antonio?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.