Funding type
This project is privately funded, on private land for private use.
T-2237 2025 Checklane Rebalance - Phase 3
2427 E Expressway 83, Mission, TX, 78572
T-2237 2025 Checklane Rebalance - Phase 3 is a renovation/alteration project at 2427 E Expressway 83, Mission, in Hidalgo County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2026). The project has an estimated value of $173K across about 2,880 sq ft.
- Estimated project value
- $173K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 2,880 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $60/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 12 days
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
6 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
100 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
12 days after the preceding date shown.
Source: TDLR filing
View source recordInspection complete · TDLR filing
The filing records completion of the accessibility inspection.
127 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
104 days after the preceding date shown.
Source: TDLR filing
View source record
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78572 (Mission)
One email per change. Unsubscribe in one click. Privacy.
T-2237 2025 Checklane Rebalance - Phase 3 is a Renovation/Alteration project located at 2427 E Expressway 83, Mission, TX 78572 in Mission, Texas. The project has an estimated value of $173K covering 2,880 sq ft. Target Corporation is the property owner and RSP Architects is the design firm of record. The project was registered with TDLR on June 13, 2025.
Frequently Asked Questions
What is T-2237 2025 Checklane Rebalance - Phase 3?
T-2237 2025 Checklane Rebalance - Phase 3 is a renovation/alteration project at 2427 E Expressway 83 in Mission, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Includes replacement of self-checkouts, relocation of belted checklane fixtures and impacted power poles: minor demolition and repair / replacement of flooring at checklanes.
Is T-2237 2025 Checklane Rebalance - Phase 3 open in Mission?
Construction on T-2237 2025 Checklane Rebalance - Phase 3 is complete — TDLR records show the project passed its required accessibility inspection in May 2026. The building is finished and very likely open.
Where is T-2237 2025 Checklane Rebalance - Phase 3 located?
T-2237 2025 Checklane Rebalance - Phase 3 is located at 2427 E Expressway 83, Mission, TX, 78572, in Hidalgo County.
Who is the owner or developer of T-2237 2025 Checklane Rebalance - Phase 3?
Target Corporation is the property owner/developer of record for T-2237 2025 Checklane Rebalance - Phase 3, per its TDLR project registration.
Who is the architect or design firm for T-2237 2025 Checklane Rebalance - Phase 3?
RSP Architects is the design firm of record for T-2237 2025 Checklane Rebalance - Phase 3, according to its TDLR filing.
How much does T-2237 2025 Checklane Rebalance - Phase 3 cost and how big is it?
T-2237 2025 Checklane Rebalance - Phase 3 has an estimated construction value of $173K and approximately 2,880 square feet (about $60/sqft), based on its TDLR filing.
Scope of Work
Includes replacement of self-checkouts, relocation of belted checklane fixtures and impacted power poles: minor demolition and repair / replacement of flooring at checklanes.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
2427 E Expressway 83, Mission, TX, 78572
Related Projects
Same Owner
$16.8M totalWatch all construction in 78572 (Mission)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Mission?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.