US Conec
US Conec is a renovation/alteration project at 5201 Alliance Gateway Freeway, Fort Worth, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $2.0M across about 99,632 sq ft.
๐Project Metrics
TDLR #TABS2025021609Review Complete
Design review complete, construction may proceed
US Conec is a Renovation/Alteration project located at 5201 Alliance Gateway Freeway, Fort Worth, TX 76177 in Fort Worth, Texas. The project has an estimated value of $2.0M covering 99,632 sq ft. Hillwood Properties is the property owner and BHA Studio is the design firm of record. The project was registered with TDLR on June 18, 2025.
โFrequently Asked Questions
What is US Conec?
US Conec is a renovation/alteration project at 5201 Alliance Gateway Freeway in Fort Worth, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior remodel of existing tenant finish out. Exterior equipment yard.
Is US Conec open in Fort Worth?
US Conec is currently under construction in Fort Worth, TX. Its current TDLR status is "Review Complete".
Where is US Conec located?
US Conec is located at 5201 Alliance Gateway Freeway, Fort Worth, TX, 76177, in Tarrant County.
Who is the owner or developer of US Conec?
Hillwood Properties is the property owner/developer of record for US Conec, per its TDLR project registration.
Who is the architect or design firm for US Conec?
BHA Studio is the design firm of record for US Conec, according to its TDLR filing.
How much does US Conec cost and how big is it?
US Conec has an estimated construction value of $2.0M and approximately 99,632 square feet (about $20/sqft), based on its TDLR filing.
๐Scope of Work
Interior remodel of existing tenant finish out. Exterior equipment yard.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jun 18, 2025
Review Complete
Jun 18, 2025
Inspection Complete
Closed