Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Hallettsville Street Reconstruction & Drainage Improvements (GLO)
N. Ridge Street, Hallettsville, TX, 77964
Hallettsville Street Reconstruction & Drainage Improvements (GLO) is a new construction project at N. Ridge Street, Hallettsville, in Lavaca County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Nov 2026. The project has an estimated value of $8.0M across about 3,500 sq ft.
- Estimated project value
- $8.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 3,500 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $2.29K/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 2y 10mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Scheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Source: TDLR filing
View source recordProject registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
509 days after the preceding date shown.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
514 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Hallettsville Street Reconstruction & Drainage Improvements (GLO)
The Hallettsville Street Reconstruction & Drainage Improvements (GLO) project is underway on N. Ridge Street in Hallettsville. This new construction work involves approximately 700 linear feet of five-foot-wide sidewalk and the installation of six ramps. The project is registered with TDLR and is scheduled to finish in November 2026, with construction starting in February 2024.
TRC Engineers Inc. serves as the design firm of record for this infrastructure upgrade. Jesus E Lardizabal is the registered accessibility specialist associated with the filing. The estimated cost for the project is $8,000,000, covering a total area of 3,500 sq ft. This valuation results in a cost per square foot of $2,286, which is significantly above the county median for similar new construction filings in Lavaca County.
Project Scope and Location
The work is funded through public funds, public land, or Federally funded roadway sources. The specific scope includes the new sidewalk and ramps, addressing accessibility and drainage needs along this section of N. Ridge Street. The project is part of a broader municipal effort to improve local infrastructure in the area.
The City of Hallettsville has other TDLR-registered projects, including the Concessions and Restrooms Building and the Hallettsville Garden & Cultural Center. TRC Engineers Inc. has also worked on other projects, such as a closed project in Seguin. The scheduled build window for this specific project is 1,023 days, which is longer than the median build window of 259 days for new construction in the county. This extended timeline reflects the scope of the street reconstruction and drainage improvements.
TDLR completed the plan review in June 2025. The project status is marked as Review Complete. The estimated cost and square footage figures are taken directly from the TDLR registration records. The project aims to enhance the usability and safety of the N. Ridge Street corridor for residents and visitors in Hallettsville.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77964 (Hallettsville)
One email per change. Unsubscribe in one click. Privacy.
Hallettsville Street Reconstruction & Drainage Improvements (GLO) is a New Construction project located at N. Ridge Street in Hallettsville, Texas. The project has an estimated value of $8.0M covering 3,500 sq ft. City of Hallettsville is the property owner and TRC Engineers Inc. is the design firm of record. The project was registered with TDLR on June 24, 2025.
Frequently Asked Questions
When is the Hallettsville street project scheduled to finish?
The project is scheduled to finish in November 2026. Construction started in February 2024, and TDLR completed the plan review in June 2025.
Who is the design firm for this project?
TRC Engineers Inc. is the design firm of record for the Hallettsville Street Reconstruction & Drainage Improvements (GLO) project.
What is the estimated cost of the project?
The estimated cost for the project is $8,000,000. This covers approximately 3,500 sq ft of new construction work.
What specific work is included in the scope?
The scope includes approximately 700 linear feet of five-foot-wide sidewalk on N. Ridge Street and the installation of six ramps.
What is Hallettsville Street Reconstruction & Drainage Improvements (GLO)?
Hallettsville Street Reconstruction & Drainage Improvements (GLO) is a new construction project at N. Ridge Street in Hallettsville, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Approximately 700 linear feet of five (5') foot wide sidewalk on N Ridge St, Hallettsville TX. Also includes total of 6 ramps.
Is Hallettsville Street Reconstruction & Drainage Improvements (GLO) open in Hallettsville?
Hallettsville Street Reconstruction & Drainage Improvements (GLO) is still under construction in Hallettsville, TX, with an estimated completion of Nov 2026 according to its TDLR registration.
Where is Hallettsville Street Reconstruction & Drainage Improvements (GLO) located?
Hallettsville Street Reconstruction & Drainage Improvements (GLO) is located at N. Ridge Street, Hallettsville, TX, 77964, in Lavaca County.
Who is the owner or developer of Hallettsville Street Reconstruction & Drainage Improvements (GLO)?
City of Hallettsville is the property owner/developer of record for Hallettsville Street Reconstruction & Drainage Improvements (GLO), per its TDLR project registration.
Who is the architect or design firm for Hallettsville Street Reconstruction & Drainage Improvements (GLO)?
TRC Engineers Inc. is the design firm of record for Hallettsville Street Reconstruction & Drainage Improvements (GLO), according to its TDLR filing.
How much does Hallettsville Street Reconstruction & Drainage Improvements (GLO) cost and how big is it?
Hallettsville Street Reconstruction & Drainage Improvements (GLO) has an estimated construction value of $8.0M and approximately 3,500 square feet (about $2.29K/sqft), based on its TDLR filing.
Scope of Work
Approximately 700 linear feet of five (5') foot wide sidewalk on N Ridge St, Hallettsville TX. Also includes total of 6 ramps.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
N. Ridge Street, Hallettsville, TX, 77964
Related Projects
Same Owner
$8.4M totalSame Design Firm
$147.2M totalWatch all construction in 77964 (Hallettsville)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Hallettsville?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.