Project intelligenceTDLR TABS2025021907New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Hallettsville Street Reconstruction & Drainage Improvements (GLO)

N. Ridge Street, Hallettsville, TX, 77964

Opening ~Nov 2026Review Complete

Hallettsville Street Reconstruction & Drainage Improvements (GLO) is a new construction project at N. Ridge Street, Hallettsville, in Lavaca County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Nov 2026. The project has an estimated value of $8.0M across about 3,500 sq ft.

Estimated project value
$8.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
3,500 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$2.29K/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2y 10mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Feb 1, 20241,023 days across supplied datesNov 20, 2026

4 timeline dates shown.

  1. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Source: TDLR filing

    View source record
  2. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    509 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    514 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77964 (Hallettsville)

One email per change. Unsubscribe in one click. Privacy.

Hallettsville Street Reconstruction & Drainage Improvements (GLO) is a New Construction project located at N. Ridge Street in Hallettsville, Texas. The project has an estimated value of $8.0M covering 3,500 sq ft. City of Hallettsville is the property owner and TRC Engineers Inc. is the design firm of record. The project was registered with TDLR on June 24, 2025.

Frequently Asked Questions

What is Hallettsville Street Reconstruction & Drainage Improvements (GLO)?

Hallettsville Street Reconstruction & Drainage Improvements (GLO) is a new construction project at N. Ridge Street in Hallettsville, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Approximately 700 linear feet of five (5') foot wide sidewalk on N Ridge St, Hallettsville TX. Also includes total of 6 ramps.

Is Hallettsville Street Reconstruction & Drainage Improvements (GLO) open in Hallettsville?

Hallettsville Street Reconstruction & Drainage Improvements (GLO) is still under construction in Hallettsville, TX, with an estimated completion of Nov 2026 according to its TDLR registration.

Where is Hallettsville Street Reconstruction & Drainage Improvements (GLO) located?

Hallettsville Street Reconstruction & Drainage Improvements (GLO) is located at N. Ridge Street, Hallettsville, TX, 77964, in Lavaca County.

Who is the owner or developer of Hallettsville Street Reconstruction & Drainage Improvements (GLO)?

City of Hallettsville is the property owner/developer of record for Hallettsville Street Reconstruction & Drainage Improvements (GLO), per its TDLR project registration.

Who is the architect or design firm for Hallettsville Street Reconstruction & Drainage Improvements (GLO)?

TRC Engineers Inc. is the design firm of record for Hallettsville Street Reconstruction & Drainage Improvements (GLO), according to its TDLR filing.

How much does Hallettsville Street Reconstruction & Drainage Improvements (GLO) cost and how big is it?

Hallettsville Street Reconstruction & Drainage Improvements (GLO) has an estimated construction value of $8.0M and approximately 3,500 square feet (about $2.29K/sqft), based on its TDLR filing.

Scope of Work

Approximately 700 linear feet of five (5') foot wide sidewalk on N Ridge St, Hallettsville TX. Also includes total of 6 ramps.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

N. Ridge Street, Hallettsville, TX, 77964

29.44884, -96.93609

Watch all construction in 77964 (Hallettsville)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Hallettsville?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.