Project intelligenceTDLR TABS2026001857New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

US 77 (CSJ: 0269-02-070)

From: Cathy Dr To: 3rd St, Hallettsville, TX, 77964

Opening ~Apr 2027Review Complete

US 77 (CSJ: 0269-02-070) is a new construction project at From: Cathy Dr To: 3rd St, Hallettsville, in Lavaca County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Apr 2027. The project has an estimated value of $309K across about 22,122 sq ft.

Estimated project value
$309K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
22,122 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$14/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1 year
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Sep 25, 2025553 days across supplied datesApr 1, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    188 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    365 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77964 (Hallettsville)

One email per change. Unsubscribe in one click. Privacy.

US 77 (CSJ: 0269-02-070) is a New Construction project located at From: Cathy Dr To: 3rd St in Hallettsville, Texas. The project has an estimated value of $309K covering 22,122 sq ft. TxDOT District: Yoakum is the property owner and KCI Technologies is the design firm of record. The project was registered with TDLR on September 25, 2025.

Frequently Asked Questions

What is US 77 (CSJ: 0269-02-070)?

US 77 (CSJ: 0269-02-070) is a new construction project at From: Cathy Dr To: 3rd St in Hallettsville, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construct sidewalks, ADA curb ramps and improve pavement markings.

Is US 77 (CSJ: 0269-02-070) open in Hallettsville?

US 77 (CSJ: 0269-02-070) is still under construction in Hallettsville, TX, with an estimated completion of Apr 2027 according to its TDLR registration.

Where is US 77 (CSJ: 0269-02-070) located?

US 77 (CSJ: 0269-02-070) is located at From: Cathy Dr To: 3rd St, Hallettsville, TX, 77964, in Lavaca County.

Who is the owner or developer of US 77 (CSJ: 0269-02-070)?

TxDOT District: Yoakum is the property owner/developer of record for US 77 (CSJ: 0269-02-070), per its TDLR project registration.

Who is the architect or design firm for US 77 (CSJ: 0269-02-070)?

KCI Technologies is the design firm of record for US 77 (CSJ: 0269-02-070), according to its TDLR filing.

How much does US 77 (CSJ: 0269-02-070) cost and how big is it?

US 77 (CSJ: 0269-02-070) has an estimated construction value of $309K and approximately 22,122 square feet (about $14/sqft), based on its TDLR filing.

Scope of Work

Construct sidewalks, ADA curb ramps and improve pavement markings.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

From: Cathy Dr To: 3rd St, Hallettsville, TX, 77964

29.44532, -96.93847

Watch all construction in 77964 (Hallettsville)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Hallettsville?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.