Project intelligenceTDLR TABS2026009732New Construction
Funding type

This project is privately funded, on private land for private use.

Diamond Distribution Parking Lot Expansion in Laredo, TX

6202 Bob Bullock Loop, Laredo, TX, 78041

Target date passed (May 2026)Review Complete

Diamond Distribution Parking Lot Expansion is a new construction project at 6202 Bob Bullock Loop, Laredo, in Webb County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish May 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $685K across about 77,753 sq ft.

Estimated project value
$685K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
77,753 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$9/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
4 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jan 9, 2026123 days across supplied datesMay 12, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    3 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    77 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    43 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Diamond Distribution Parking Lot Expansion

Zuco Minerals and Development filed plans in January 2026 to expand the parking lot at 6202 Bob Bullock Loop in Laredo. The project, named on the filing as the Diamond Distribution Parking Lot Expansion, involves the new construction of a parking area and the addition of new sidewalks. The total estimated cost is $685,000 for a site size of 77,753 square feet.

The work is privately funded on private land for private use. KCI Technologies is the design firm of record, and Monica Guajardo is the registered accessibility specialist. This location places the site in an area with a population of about 47,089 and a median household income of $61,007, according to U.S. Census estimates for ZIP code 78041.

Construction Timeline and Status

Construction was scheduled to begin in January 2026 and finish in May 2026, creating a planned build window of 120 days. This duration is shorter than the county median of 240 days for similar new construction projects in Webb County. The estimated cost per square foot is $9, which is below the county median of $95 for comparable filings. The total project cost is also below the county median of $900,000 for new construction in the area.

TDLR completed plan review in March 2026. Although the scheduled completion date of May 2026 has passed, TDLR has not yet recorded a final inspection. Therefore, the current state of the site is not confirmed in the public record. The registration status remains Review Complete, indicating that the design phase was approved, but the physical completion of the work is not verified in the TDLR database.

KCI Technologies has registered six other projects in Texas, totaling $7,750,417. These include various street improvements in Houston, a hangar in Kerrville, and projects in La Grange and Hallettsville. All of these other projects have also completed their plan review stages. The Zuco Minerals and Development project stands as a specific infrastructure addition to the distribution facility at the Bob Bul Loop address.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78041 (Laredo)

One email per change. Unsubscribe in one click. Privacy.

Diamond Distribution Parking Lot Expansion is a New Construction project located at 6202 Bob Bullock Loop, Laredo, TX 78041 in Laredo, Texas. The project has an estimated value of $685K covering 77,753 sq ft. Zuco Minerals and Development is the property owner and KCI Technologies is the design firm of record. The project was registered with TDLR on January 9, 2026.

Frequently Asked Questions

What is the primary scope of work for this project?

The filing describes the construction of a new parking lot and the addition of new sidewalks at 6202 Bob Bullock Loop in Laredo.

Who is the design firm for this construction?

KCI Technologies is listed as the design firm of record for the Diamond Distribution Parking Lot Expansion project.

What is the estimated cost and size of the project?

The estimated cost is $685,000 for a total area of 77,753 square feet, resulting in a cost of $9 per square foot.

Is the project currently open for business?

The TDLR record does not confirm business operations. It notes that TDLR has not yet recorded a final inspection, so the site's status is unverified.

What is Diamond Distribution Parking Lot Expansion?

Diamond Distribution Parking Lot Expansion is a new construction project at 6202 Bob Bullock Loop in Laredo, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of a new parking lot and addition of new sidewalks

Is Diamond Distribution Parking Lot Expansion open in Laredo?

Diamond Distribution Parking Lot Expansion was scheduled to finish construction in May 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Diamond Distribution Parking Lot Expansion located?

Diamond Distribution Parking Lot Expansion is located at 6202 Bob Bullock Loop, Laredo, TX, 78041, in Webb County.

Who is the owner or developer of Diamond Distribution Parking Lot Expansion?

Zuco Minerals and Development is the property owner/developer of record for Diamond Distribution Parking Lot Expansion, per its TDLR project registration.

Who is the architect or design firm for Diamond Distribution Parking Lot Expansion?

KCI Technologies is the design firm of record for Diamond Distribution Parking Lot Expansion, according to its TDLR filing.

How much does Diamond Distribution Parking Lot Expansion cost and how big is it?

Diamond Distribution Parking Lot Expansion has an estimated construction value of $685K and approximately 77,753 square feet (about $9/sqft), based on its TDLR filing.

Scope of Work

Construction of a new parking lot and addition of new sidewalks

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

6202 Bob Bullock Loop, Laredo, TX, 78041

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 78041 (Laredo)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.