Fourth Ward Street Reconstruction Project-Phase 3 in Houston, TX
1100 Cleveland St, Houston, TX, 77019
Fourth Ward Street Reconstruction Project-Phase 3 is a renovation/alteration project at 1100 Cleveland St, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jul 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $4.9M across about 200,000 sq ft.
- Estimated project value
- $4.9M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 200,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $25/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 3mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Scheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Source: TDLR filing
View source recordProject registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
312 days after the preceding date shown.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
50 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
78 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Fourth Ward Street Reconstruction Project-Phase 3
Fourth Ward various streets, filed as the Fourth Ward Street Reconstruction Project-Phase 3, involves the renovation and alteration of roadway and sidewalk infrastructure in Houston's Fourth Ward neighborhood. The project is located at 1100 Cleveland St, Houston, TX 77019, within Harris County. The scope covers the removal of existing roads and sidewalks, followed by the construction of new roads, curbs, and sidewalks. The area is bounded on the north by Saulnier Street and on the east by Valentine St. The streets involved are one-way with limited right-of-way.
The owner of record is the Fourth Ward Redevelopment Authority, with KCI Technologies serving as the design firm. Holly Respondek is the registered accessibility specialist for the project. The estimated cost is $4,914,052 for a total area of 200,000 sq ft, resulting in a computed cost of $25 per sq ft. This project involves public funds, public land, or is a Federally funded roadway project.
Project Timeline and Status
Construction was scheduled to begin in April 2025, with a planned completion date of July 2026. TDLR completed plan review in April 2026. However, TDLR has not yet recorded a final inspection, so the current state of the site is not confirmed in the public record. The project is registered with TDLR and the status is listed as Review Complete. The scheduled build window of 440 days is longer than the county median of 92 days for similar renovation and alteration filings in Harris County.
In terms of scale, the estimated cost is above the county median for its type, placing it in the top quarter of comparable projects. The median estimated cost for similar filings in Harris County is $250,000, with the middle half ranging from $125,436 to $600,000. The median size for these projects is 4,000 sq ft, with a median cost of $80 per sq ft. This project's $25 per sq ft is below the county median of $80. KCI Technologies has six other TDLR-registered projects totaling $3,521,365, including work in Kerrville, Laredo, La Grange, and Hallettsville.
The surrounding area, ZIP 77019, has a population of about 23,662 and a median household income of $108,353 according to U.S. Census ACS 2023 five-year estimates. The area contains 14,387 housing units, with a median owner-occupied home value of $724,900. Housing in this ZIP code is mostly renter-occupied. Nearby businesses include Cyclone Anaya's Tex-Mex Kitchen, Coco Crepes & Coffee, MAA Midtown Square, Marquis Enclave, Midtown Arbor Place Apartments, and Metro Midtown. The Harris County unemployment rate was 5.2 percent in July 2026, higher than a year earlier.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77019 (Houston)
One email per change. Unsubscribe in one click. Privacy.
Fourth Ward Street Reconstruction Project-Phase 3 is a Renovation/Alteration project located at 1100 Cleveland St, Houston, TX 77019 in Houston, Texas. The project has an estimated value of $4.9M covering 200,000 sq ft. FOURTH WARD REDEVELOPMENT AUTHORITY is the property owner and KCI Technologies is the design firm of record. The project was registered with TDLR on February 27, 2026.
Frequently Asked Questions
Is the Fourth Ward Street Reconstruction Project complete?
The scheduled completion date was July 2026, but TDLR has not yet recorded a final inspection. Therefore, the current state of the site is not confirmed in the public record.
Who owns and designed this project?
The owner of record is the Fourth Ward Redevelopment Authority. The design firm of record is KCI Technologies, and Holly Respondek is the registered accessibility specialist.
What is the estimated cost of the project?
The estimated cost is $4,914,052. This figure is above the county median for similar renovation and alteration projects in Harris County.
Where exactly is the project located?
The project is located at 1100 Cleveland St, Houston, TX 77019, in the Fourth Ward neighborhood of Harris County.
What work is being performed?
The work consists of roadway and sidewalk removal, and the construction of new roads, curbs, and sidewalks. The area is bounded by Saulnier Street and Valentine St.
What is Fourth Ward Street Reconstruction Project-Phase 3?
Fourth Ward Street Reconstruction Project-Phase 3 is a renovation/alteration project at 1100 Cleveland St in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Project consists of roadway and sidewalk removal, and the construction of roads, curbs and sidewalks. Streets within this project are one-way and have limited ROW. Project area is bounded on the north by Saulnier Street, on the east by V…
Is Fourth Ward Street Reconstruction Project-Phase 3 open in Houston?
Fourth Ward Street Reconstruction Project-Phase 3 was scheduled to finish construction in Jul 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Fourth Ward Street Reconstruction Project-Phase 3 located?
Fourth Ward Street Reconstruction Project-Phase 3 is located at 1100 Cleveland St, Houston, TX, 77019, in Harris County.
Who is the owner or developer of Fourth Ward Street Reconstruction Project-Phase 3?
FOURTH WARD REDEVELOPMENT AUTHORITY is the property owner/developer of record for Fourth Ward Street Reconstruction Project-Phase 3, per its TDLR project registration.
Who is the architect or design firm for Fourth Ward Street Reconstruction Project-Phase 3?
KCI Technologies is the design firm of record for Fourth Ward Street Reconstruction Project-Phase 3, according to its TDLR filing.
How much does Fourth Ward Street Reconstruction Project-Phase 3 cost and how big is it?
Fourth Ward Street Reconstruction Project-Phase 3 has an estimated construction value of $4.9M and approximately 200,000 square feet (about $25/sqft), based on its TDLR filing.
Scope of Work
Project consists of roadway and sidewalk removal, and the construction of roads, curbs and sidewalks. Streets within this project are one-way and have limited ROW. Project area is bounded on the north by Saulnier Street, on the east by Valentine St
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
1100 Cleveland St, Houston, TX, 77019
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Watch all construction in 77019 (Houston)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Houston?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.