Project intelligenceTDLR TABS2025022051Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

PNC Bank ADA Remediation Design

1902 West Tyler Ave., Harlingen, TX, 78550

Construction complete · Apr 2026Project Closed

PNC Bank ADA Remediation Design is a renovation/alteration project at 1902 West Tyler Ave., Harlingen, in Cameron County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2026). The project has an estimated value of $350K across about 10,610 sq ft.

Estimated project value
$350K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
10,610 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$33/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jun 25, 2025305 days across supplied datesApr 26, 2026

6 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    98 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    60 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    59 days after the preceding date shown.

    Source: TDLR filing

    View source record
  6. Project closed · TDLR filing

    The project record was closed in TDLR.

    88 days after the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78550 (Harlingen)

One email per change. Unsubscribe in one click. Privacy.

PNC Bank ADA Remediation Design is a Renovation/Alteration project located at 1902 West Tyler Ave., Harlingen, TX 78550 in Harlingen, Texas. The project has an estimated value of $350K covering 10,610 sq ft. PNC Bank, N.A. is the property owner and Michael Baker International is the design firm of record. The project was registered with TDLR on June 25, 2025.

Frequently Asked Questions

What is PNC Bank ADA Remediation Design?

PNC Bank ADA Remediation Design is a renovation/alteration project at 1902 West Tyler Ave. in Harlingen, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Improvements are to address exterior accessible parking/access aisles and accessible pedestrian paths into compliance with current ADA standards including demolition and replacement of 10,610 SF of Concrete pavement & sidewalks.

Is PNC Bank ADA Remediation Design open in Harlingen?

Construction on PNC Bank ADA Remediation Design is complete — TDLR records show the project passed its required accessibility inspection in Apr 2026. The building is finished and very likely open.

Where is PNC Bank ADA Remediation Design located?

PNC Bank ADA Remediation Design is located at 1902 West Tyler Ave., Harlingen, TX, 78550, in Cameron County.

Who is the owner or developer of PNC Bank ADA Remediation Design?

PNC Bank, N.A. is the property owner/developer of record for PNC Bank ADA Remediation Design, per its TDLR project registration.

Who is the architect or design firm for PNC Bank ADA Remediation Design?

Michael Baker International is the design firm of record for PNC Bank ADA Remediation Design, according to its TDLR filing.

How much does PNC Bank ADA Remediation Design cost and how big is it?

PNC Bank ADA Remediation Design has an estimated construction value of $350K and approximately 10,610 square feet (about $33/sqft), based on its TDLR filing.

Scope of Work

Improvements are to address exterior accessible parking/access aisles and accessible pedestrian paths into compliance with current ADA standards including demolition and replacement of 10,610 SF of Concrete pavement & sidewalks.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

1902 West Tyler Ave., Harlingen, TX, 78550

Location by street address

Watch all construction in 78550 (Harlingen)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Harlingen?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.