Pitch 25
Pitch 25 is a renovation/alteration project at 221 Burleson St, San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Nov 2026. The project has an estimated value of $4.0M across about 25,590 sq ft.
๐Project Metrics
TDLR #TABS2025022214Project Registered
Project has been registered with TDLR and is in pre-construction phase
Pitch 25 is a Renovation/Alteration project located at 221 Burleson St, San Antonio, TX 78202 in San Antonio, Texas. The project has an estimated value of $4.0M covering 25,590 sq ft. Pitch 25 SATX Real Estate LLC is the property owner and Cisneros Design Studio, Architects LLC is the design firm of record. The project was registered with TDLR on June 27, 2025.
โFrequently Asked Questions
What is Pitch 25?
Pitch 25 is a renovation/alteration project at 221 Burleson St in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: PROJECT CONSISTS OF AN INTERIOR RENOVATION OF AN EXISTING SINGLE STORY EXHIBITION HALL WITH A MEZZANINE INTO A BAR/RESTAURANT.
Is Pitch 25 open in San Antonio?
Pitch 25 is still under construction in San Antonio, TX, with an estimated completion of Nov 2026 according to its TDLR registration.
Where is Pitch 25 located?
Pitch 25 is located at 221 Burleson St, San Antonio, TX, 78202, in Bexar County.
Who is the owner or developer of Pitch 25?
Pitch 25 SATX Real Estate LLC is the property owner/developer of record for Pitch 25, per its TDLR project registration.
Who is the architect or design firm for Pitch 25?
Cisneros Design Studio, Architects LLC is the design firm of record for Pitch 25, according to its TDLR filing.
How much does Pitch 25 cost and how big is it?
Pitch 25 has an estimated construction value of $4.0M and approximately 25,590 square feet (about $156/sqft), based on its TDLR filing.
๐Scope of Work
PROJECT CONSISTS OF AN INTERIOR RENOVATION OF AN EXISTING SINGLE STORY EXHIBITION HALL WITH A MEZZANINE INTO A BAR/RESTAURANT.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jun 27, 2025
Review Complete
Inspection Complete
Closed